Capitol Lakes

NPL Site

Baton Rouge, LA

Site Status

NPL Status
NPL Site
Federal Facility
No
Construction Complete
No
HRS Score
50.00
Deleted from NPL
No

Contaminants

Contaminant data is not available for this site. The EPA's contaminant records for Superfund sites are maintained in a separate database that may not include all sites.

Location

City
Baton Rouge
Coordinates
30.4605, -91.1850

Other Superfund Sites in Louisiana

Site Name Status HRS Score
Agriculture Street Landfill NPL Site 50.00
American Creosote DeRidder NPL Site 50.00
American Creosote Works, Inc. (Winnfield Plant) NPL Site 50.70
Bayou Bonfouca NPL Site 29.78
Bayou Sorrel Deleted NPL Site 34.69
Central Wood Preserving Co. Deleted NPL Site 48.53
Cleve Reber Deleted NPL Site 48.80
Colonial Creosote NPL Site 50.00
Combustion, Inc. NPL Site 33.79
D.L. Mud, Inc. Deleted NPL Site 32.37

About Superfund

The National Priorities List (NPL) is the list of sites of national priority among the known releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. The NPL is intended primarily to guide the EPA in determining which sites warrant further investigation.

The Hazard Ranking System (HRS) score is the principal mechanism the EPA uses to evaluate sites for placement on the NPL. Sites with an HRS score of 28.50 or greater are eligible for the NPL. Higher scores indicate greater potential risk.

The EPA's Superfund cleanup process typically follows these phases: preliminary assessment, site inspection, NPL listing, remedial investigation/feasibility study, remedy selection, remedial design/action, construction completion, post-construction completion, and NPL deletion. Some sites remain on the NPL for decades.

PlainEnviro presents this data without advocacy framing. The presence of a site on the NPL does not by itself indicate an immediate health risk to nearby residents. For site-specific health questions, consult your local environmental or health agency.