Perdido Ground Water Contamination
Deleted NPL SitePerdido, AL
Site Status
Contaminants
Contaminant data is not available for this site. The EPA's contaminant records for Superfund sites are maintained in a separate database that may not include all sites.
Location
Other Superfund Sites in Alabama
| Site Name | Status | HRS Score |
|---|---|---|
| 35th Avenue | Proposed NPL Site | 50.00 |
| Alabama Army Ammunition Plant | NPL Site | 36.83 |
| Alabama Plating Company, Inc. | NPL Site | 30.20 |
| American Brass | NPL Site | 55.61 |
| Anniston Army Depot (Southeast Industrial Area) | NPL Site | 51.91 |
| Ciba-Geigy Corp. (McIntosh Plant) | NPL Site | 53.42 |
| Interstate Lead Co. (ILCO) | NPL Site | 42.86 |
| Mowbray Engineering Co. | Deleted NPL Site | 53.67 |
| Olin Corp. (McIntosh Plant) | NPL Site | 39.71 |
| Redstone Arsenal (USARMY/NASA) | NPL Site | 50.00 |
About Superfund
The National Priorities List (NPL) is the list of sites of national priority among the known releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. The NPL is intended primarily to guide the EPA in determining which sites warrant further investigation.
The Hazard Ranking System (HRS) score is the principal mechanism the EPA uses to evaluate sites for placement on the NPL. Sites with an HRS score of 28.50 or greater are eligible for the NPL. Higher scores indicate greater potential risk.
The EPA's Superfund cleanup process typically follows these phases: preliminary assessment, site inspection, NPL listing, remedial investigation/feasibility study, remedy selection, remedial design/action, construction completion, post-construction completion, and NPL deletion. Some sites remain on the NPL for decades.
PlainEnviro presents this data without advocacy framing. The presence of a site on the NPL does not by itself indicate an immediate health risk to nearby residents. For site-specific health questions, consult your local environmental or health agency.