Teco Energy Inc toxic releases

Teco Energy Inc's 2 TRI facilities reported 149,768 pounds of toxic chemical releases to EPA for 2024, 95% of it to air; the largest was Polk Power Station in Mulberry, FL (141,031 pounds). It ranked 686th of 4,231 parent companies by 2024 releases. (EPA TRI 2019-2024.)

Check this record at EPA: EPA TRI basic data files (the parent company column)

149,768lbreleased, 2024

2facilities reporting, 2024

2facilities since 2019

1state

How do Teco Energy Inc's 2024 releases compare?

Teco Energy Inc ranked 686th of 4,231 parent companies by 2024 releases. Its largest facility released 94% of the company's 2024 total; the average across its 2 reporting facilities was 74,884 pounds. 95% of the 2024 total went to air, 4% to land on site, under 1% to water and under 1% to off-site disposal. Its facilities filed 2024 TRI forms for 4 chemicals; ammonia was released in the largest amount (148,555 pounds, 99% of the total, from 2 facilities). Against 2023 (181,090 pounds from 2 facilities), 2024 was lower by 17%. Against 2019 (290,175 pounds from 2 facilities), 2024 was lower by 48%.

Source: Computed by PlainEnviro from the EPA TRI basic data files 2019-2024 (forms naming this parent).

Which facilities does Teco Energy Inc report to TRI?

  1. Polk Power StationMulberry, FL 141,031 pounds
  2. Tampa Electric Co Big Bend Power StationApollo Beach, FL 8,737 pounds
Facilities that named Teco Energy Inc as parent, 2019-2024 (pounds released)
FacilityPlaceReleased 2024
Polk Power StationMulberry, FL141,031
Tampa Electric Co Big Bend Power StationApollo Beach, FL8,737

Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.

Are Teco Energy Inc's releases going up or down?

Toxic releases reported under Teco Energy Inc, 2019-2024 (pounds)
290K276K299K225K181K150K
Toxic releases reported under Teco Energy Inc, 2019-2024
2019290K pounds
2020276K pounds
2021299K pounds
2022225K pounds
2023181K pounds
2024150K pounds

Releases reported under Teco Energy Inc fell from 290,175 pounds in 2019 to 149,768 pounds in 2024 (-48%), from the same number of facilities in both years (2). Each year counts the forms that named it as parent, so facilities it bought or sold count only in their years under it.

Source: EPA TRI basic data files 2019-2024.

Which chemicals did Teco Energy Inc's facilities release most in 2024?

Across its facilities, Teco Energy Inc reported releases above zero of 4 chemicals for 2024; ammonia was the largest at 148,555 pounds (99%).

  1. Ammonia2 facilities 148,555 pounds
  2. Sulfuric acid (acid aerosols including mists, vapors, gas, fog, and other airborne forms of any particle size)1 facility 830 pounds
  3. Hydrochloric acid (acid aerosols including mists, vapors, gas, fog, and other airborne forms of any particle size)1 facility 300 pounds
  4. Lead and lead compounds1 facility 83 pounds

Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.

What can the figures under Teco Energy Inc not tell you?

They add up what each facility naming Teco Energy Inc as parent estimated and filed (EPA standardizes the parent name): not EPA measurements, and a release is not a measure of what people nearby are exposed to; inspections, violations and penalties are on each facility's page. What TRI figures can and cannot tell you.

Sources: the EPA files behind this page
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
  • EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov