Parent company · TRI
Vinci Construction USA toxic releases
Vinci Construction USA's 5 TRI facilities reported 4 pounds of toxic chemical releases to EPA for 2024, 100% of it to air; the largest was Blythe Construction Inc. - Arrowood Plant in Pineville, NC (1 pound). It ranked 3,483rd of 4,231 parent companies by 2024 releases. (EPA TRI 2019-2024.)
Check this record at EPA: EPA TRI basic data files (the parent company column)
4lbreleased, 2024
5facilities reporting, 2024
5facilities since 2019
3states
How do Vinci Construction USA's 2024 releases compare?
Vinci Construction USA ranked 3,483rd of 4,231 parent companies by 2024 releases. Its largest facility released 34% of the company's 2024 total; the average across its 5 reporting facilities was under 1 pound. 100% of the 2024 total went to air, 0% to land on site, 0% to water and 0% to off-site disposal. Its facilities filed 2024 TRI forms for 2 chemicals, 1 of them with releases above zero; polycyclic aromatic compounds was released in the largest amount (4 pounds, 100% of the total, from 5 facilities). Its 2024 facilities are in 3 states; those in North Carolina reported the most (56%). Against 2023 (3 pounds from 4 facilities), 2024 was higher by 46%. Against 2019 (3 pounds from 3 facilities), 2024 was higher by 53%.
Source: Computed by PlainEnviro from the EPA TRI basic data files 2019-2024 (forms naming this parent).
Which facilities does Vinci Construction USA report to TRI?
- Blythe Construction Inc. - Arrowood PlantPineville, NC 1 pound
- Northeast Paving Bridgeville PlantBridgeville, PA under 1 pound
- BlytheCharlotte, NC under 1 pound
- Virginia Paving Alexandria PlantAlexandria, VA under 1 pound
- Northeast Paving Springdale PlantSpringdale, PA under 1 pound
| Facility | Place | Released 2024 |
|---|---|---|
| Blythe Construction Inc. - Arrowood Plant | Pineville, NC | 1 |
| Northeast Paving Bridgeville Plant | Bridgeville, PA | 1 |
| Blythe | Charlotte, NC | 1 |
| Virginia Paving Alexandria Plant | Alexandria, VA | 1 |
| Northeast Paving Springdale Plant | Springdale, PA | 0 |
Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.
Are Vinci Construction USA's releases going up or down?
| 2019 | 3 pounds |
|---|---|
| 2020 | 2 pounds |
| 2021 | 2 pounds |
| 2022 | 4 pounds |
| 2023 | 3 pounds |
| 2024 | 4 pounds |
Releases reported under Vinci Construction USA rose from 3 pounds in 2019 to 4 pounds in 2024 (+53%), from 3 facilities to 5. Each year counts the forms that named it as parent, so facilities it bought or sold count only in their years under it.
Source: EPA TRI basic data files 2019-2024.
In which states does Vinci Construction USA report?
Vinci Construction USA's facilities are in 3 states; North Carolina had the most 2024 releases (2 pounds).
| State | Facilities since 2019 | Reporting 2024 | Released 2024 |
|---|---|---|---|
| North Carolina | 2 | 2 | 2 |
| Pennsylvania | 2 | 2 | 1 |
| Virginia | 1 | 1 | 1 |
Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.
Which chemicals did Vinci Construction USA's facilities release most in 2024?
Across its facilities, Vinci Construction USA reported releases above zero of 1 chemical for 2024; polycyclic aromatic compounds was the largest at 4 pounds (100%).
- Polycyclic aromatic compounds5 facilities 4 pounds
Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.
What can the figures under Vinci Construction USA not tell you?
They add up what each facility naming Vinci Construction USA as parent estimated and filed (EPA standardizes the parent name): not EPA measurements, and a release is not a measure of what people nearby are exposed to; inspections, violations and penalties are on each facility's page. What TRI figures can and cannot tell you.
Sources: the EPA files behind this page
- EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
- EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
- EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
- EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
- EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov