PlainEnviro

Parent company · TRI

Whelen Engineering toxic releases

Whelen Engineering's 2 TRI facilities reported 5 pounds of toxic chemical releases to EPA for 2024, 100% of it to air; the largest was Whelen Engineering Co in Chester, CT (3 pounds). It ranked 3,459th of 4,231 parent companies by 2024 releases. (EPA TRI 2019-2024.)

Check this record at EPA: EPA TRI basic data files (the parent company column)

5lbreleased, 2024

2facilities reporting, 2024

2facilities since 2019

2states

How do Whelen Engineering's 2024 releases compare?

Whelen Engineering ranked 3,459th of 4,231 parent companies by 2024 releases. Its largest facility released 55% of the company's 2024 total; the average across its 2 reporting facilities was 3 pounds. 100% of the 2024 total went to air, 0% to land on site, 0% to water and 0% to off-site disposal. Its facilities filed 2024 TRI forms for 1 chemical; lead was released in the largest amount (5 pounds, 100% of the total, from 2 facilities). Its 2024 facilities are in 2 states; those in Connecticut reported the most (55%).

Source: Computed by PlainEnviro from the EPA TRI basic data files 2019-2024 (forms naming this parent).

Which facilities does Whelen Engineering report to TRI?

  1. Whelen Engineering CoChester, CT 3 pounds
  2. Whelen EngineeringCharlestown, NH 2 pounds
Facilities that named Whelen Engineering as parent, 2019-2024 (pounds released)
FacilityPlaceReleased 2024
Whelen Engineering CoChester, CT3
Whelen EngineeringCharlestown, NH2

Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.

Are Whelen Engineering's releases going up or down?

Toxic releases reported under Whelen Engineering, 2019-2024 (pounds)
000005
Toxic releases reported under Whelen Engineering, 2019-2024
20190 pounds
20200 pounds
20210 pounds
20220 pounds
20230 pounds
20245 pounds

Releases reported under Whelen Engineering rose from none in 2019 to 5 pounds in 2024, from the same number of facilities in both years (2). Each year counts the forms that named it as parent, so facilities it bought or sold count only in their years under it.

Source: EPA TRI basic data files 2019-2024.

In which states does Whelen Engineering report?

Whelen Engineering's facilities are in 2 states; Connecticut had the most 2024 releases (3 pounds).

Whelen Engineering by state (state of each facility's latest form; 2024 pounds released)
StateFacilities since 2019Reporting 2024Released 2024
Connecticut113
New Hampshire112

Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.

Which chemicals did Whelen Engineering's facilities release most in 2024?

Across its facilities, Whelen Engineering reported releases above zero of 1 chemical for 2024; lead was the largest at 5 pounds (100%).

  1. Lead2 facilities 5 pounds

Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.

What can the figures under Whelen Engineering not tell you?

They add up what each facility naming Whelen Engineering as parent estimated and filed (EPA standardizes the parent name): not EPA measurements, and a release is not a measure of what people nearby are exposed to; inspections, violations and penalties are on each facility's page. What TRI figures can and cannot tell you.

Sources: the EPA files behind this page
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
  • EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov