PlainEnviro

Non-transient non-community water system · New Jersey

Readington Middle School Well #2 drinking water

Readington Middle School Well #2 (NJ1022379) is a non-transient non-community water system in Readington Township, NJ serving 620 people from groundwater. In the 10 years to the 2026 third-quarter report, EPA records 2 health-based violations and 9 monitoring, reporting or notice violations. Its latest lead 90th percentile (monitoring period beginning January 2025) was below the detection limit. (EPA SDWA data, October 14, 2026.)

Check this record at EPA: ECHO drinking water report for NJ1022379

620people served

2health-based violations, 10 years

0violations still open

NDlead, 90th percentile: below detection (period from 2025)

Is the water from Readington Middle School Well #2 safe to drink?

Readington Middle School Well #2 had 2 health-based violations in the 10 years to October 2026: a contaminant over its maximum level. Every violation since October 2016 is resolved or archived. Its full SDWIS record, older years included, holds 15 violations of every kind.

In New Jersey, 30% of the 555 active community systems had a health-based violation in the same 10 years.

In its measured results, its latest lead 90th percentile (period beginning January 2025) was below the detection limit. It draws on groundwater for 620 people.

This is Readington Middle School Well #2's compliance record, not a test of the water at your tap: what the records cannot tell you, and who can.

Source: EPA Safe Drinking Water Information System (SDWIS), federal data download, quarter 2026Q3, released October 14, 2026. Confirm in EPA ECHO drinking water search.

What violations does EPA record for Readington Middle School Well #2?

EPA records 11 violations for Readington Middle School Well #2 since October 2016: 6 monitoring and reporting, 2 over a maximum contaminant level, 1 reporting, 1 monitoring, and 1 other (public notice, consumer report).

Violations since October 2016, newest first
Contaminant or ruleKindCompliance periodStatus
Lead and Copper RuleMonitoring and reportingsince December 2025Resolved
Lead and Copper RuleMonitoring and reportingsince December 2024Resolved
Revised Total Coliform RuleReportingsince September 2024Resolved
Revised Total Coliform RuleMonitoringAugust 2024Resolved
Groundwater RuleOther (public notice, consumer report)since August 2020Resolved
Lead and Copper RuleMonitoring and reportingJuly 2020 to December 2020Resolved
Revised Total Coliform RuleOver a maximum contaminant level (health-based)July 2020Resolved
Lead and Copper RuleMonitoring and reportingJanuary 2020 to June 2020Resolved
Revised Total Coliform RuleOver a maximum contaminant level (health-based)December 2019Resolved
Lead and Copper RuleMonitoring and reportingJuly 2017 to December 2017Resolved
Lead and Copper RuleMonitoring and reportingJanuary 2017 to June 2017Resolved
Violations by year the compliance period began, Readington Middle School Well #2 (violations)
2014000310
Violations by year the compliance period began, Readington Middle School Well #2
20172 violations
20180 violations
20191 violation
20204 violations
20210 violations
20220 violations
20230 violations
20243 violations
20251 violation
20260 violations

Source: SDWIS violations and enforcement, quarter 2026Q3; health-based means a maximum contaminant level, residual disinfectant level or treatment technique was not met.

How much lead and copper is in Readington Middle School Well #2's tap samples?

Lead, 90th percentile of tap samples (period beginning January 2025)0.0 mg/L Below detection
Copper, 90th percentile (period beginning July 2015)1.82 mg/L Above the action level

Over the action level (Readington Middle School Well #2's result is a 90th percentile: what that is), a system must treat the water to make it less corrosive, tell the public and replace lead lines. The Lead and Copper Rule Improvements (in effect since December 30, 2024) lower the lead action level to 0.010 mg/L from November 1, 2027.

Source: SDWIS lead and copper sample summaries (90th percentiles), quarter 2026Q3; Lead and Copper Rule Improvements: Federal Register, published October 30, 2024, effective December 30, 2024; 40 CFR 141.80(a)(4)(i) keeps 0.015 mg/L until November 1, 2027 and 141.80(c)(1) sets 0.010 mg/L from then (eCFR); both read November 11, 2026.

Who does Readington Middle School Well #2 serve, and where does its water come from?

Readington Middle School Well #2 is a non-transient non-community water system; EPA's inventory lists its owner type as local government, on EPA's inventory since 2008.

It reports serving Readington Township, in Hunterdon county.

Community systems publish an annual water quality report (Consumer Confidence Report); a school or workplace system reports to its own users; how to find yours (EPA).

Source: SDWIS water system inventory and geographic areas served, quarter 2026Q3.

What other environmental records are in Hunterdon County?

The TRI facilities in Hunterdon County that reported the most toxic releases:

  1. Trident Maritime Systems-Cac LLC 202,357 pounds
  2. Luxfer Mel Technologies Dba Mel Chemical-Treatment Plant 1,872 pounds
  3. Chroma Color Corp 635 pounds
  4. MW Industries Atlantic Spring Div 1 pound

Superfund sites in Hunterdon County: Curtis Specialty Papers, Inc (on the National Priorities List); Myers Property (on the National Priorities List); De Rewal Chemical Co. (on the National Priorities List); Crown Vantage Landfill (deleted from the list).

A facility or site in the same county is not evidence that it affects this system's water; source-water protection is assessed by the state.

Source: EPA Toxics Release Inventory 2024 and EPA SEMS National Priorities List, as of October 28, 2026.

Sources: the EPA files behind this page
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) occurrence data, final data, August 2026: www.epa.gov
  • EPA Lead and Copper Rule and Lead and Copper Rule Improvements: www.epa.gov
  • EPA PFAS National Primary Drinking Water Regulation (2024) and the May 2026 proposal: www.epa.gov
  • EPA: find your local Consumer Confidence Report: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov