TRI facility · Alabama
General Electric
General Electric in Madison, AL reported 27 pounds of toxic chemical releases to EPA for 2024, 100% to air, led by xylene (mixed isomers). It ranked 386th of 559 TRI facilities in Alabama that year and 13,295th of 21,482 nationwide. (EPA Toxics Release Inventory, reporting year 2024; confirm it in this facility's EPA record.)
27lbtoxic releases, 2024
100%to air
2chemicals reported, 2024
0lbof them carcinogens
0quarters in violation of 12 (ECHO)
What did General Electric release in 2024?
- Air 100.0%
- Water 0.0%
- Land 0.0%
- Off-site disposal 0.0%
Of the 27 pounds released in 2024, 27 pounds went to air, 0 pounds to water, 0 pounds to land on site and 0 pounds to off-site disposal. None of it was a chemical TRI flags as a carcinogen (the OSHA list).
| Chemical | Released | Air | Water | Land | Off-site |
|---|---|---|---|---|---|
| Xylene (mixed isomers) | 17 | 17 | 0 | 0 | 0 |
| Boron trichloride | 10 | 10 | 0 | 0 | 0 |
Source: EPA Toxics Release Inventory basic data file, reporting year 2024, forms processed as of November 5, 2025. Confirm in EPA's ECHO facility report.
What does EPA's compliance record show for General Electric?
EPA's compliance database (ECHO) links General Electric to FRS facility 110070118986. In the last 12 quarters it was in violation of an environmental permit or rule in 0 of 12. Inspectors visited 9 times in the last five years (latest February 17, 2026). Regulators took 0 formal enforcement actions in five years.
| Program | Status now | Quarters in violation, last 12 | Formal actions (5 yr) | Penalties (5 yr) |
|---|---|---|---|---|
| Clean Water Act | Unknown | 0 | 0 | $0 |
| Hazardous waste (RCRA) | No Violation Identified | 0 | 0 | $0 |
A violation is a permit or rule breach EPA or a state recorded; it is not a finding that the releases above were illegal. TRI releases are reported under a right-to-know law, not a permit.
Source: EPA Enforcement and Compliance History Online (ECHO) facility download, November 8, 2026. Confirm in ECHO detailed facility report.
How much waste did General Electric manage, and where did it send it?
For 2024, General Electric reported 33,627 pounds of production-related waste, the toxic chemicals it recycled, burned for energy, treated or released. It transferred 33,600 pounds off site, to recycling, energy recovery, treatment, disposal or a sewage treatment plant.
Source: EPA TRI basic data file 2024, sections 6 and 8 of the reporting form.
Which Superfund sites are near General Electric?
| Site | Miles | Status |
|---|---|---|
| Triana/Tennessee River | 7.9 | On the final NPL |
| Usarmy/NASA Redstone Arsenal | 9.1 | On the final NPL |
Distance is straight-line between EPA's coordinates for each. Being near is not evidence that the facility contributed to a site.
Source: EPA SEMS National Priorities List (October 28, 2026) and EPA TRI facility coordinates.
What can General Electric's figures not tell you?
They are General Electric's own estimates, filed under penalty of law, not EPA measurements, and a release is not a measure of what people nearby are exposed to. What TRI figures can and cannot tell you.
Sources: the EPA files behind this page
- EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
- EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
- EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
- EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
- EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov