TRI facility · Colorado
Brannan Ready Mix - West Plant
Brannan Ready Mix - West Plant in Denver, CO reported under 1 pound of toxic chemical releases to EPA for 2024, 100% to air, led by lead And Lead Compounds. It ranked 220th of 262 TRI facilities in Colorado that year and 17,119th of 21,482 nationwide. (EPA Toxics Release Inventory, reporting year 2024; confirm it in this facility's EPA record.)
<1lbtoxic releases, 2024
100%to air
2chemicals reported, 2024
0lbof them carcinogens
What did Brannan Ready Mix - West Plant release in 2024?
- Air 100.0%
- Water 0.0%
- Land 0.0%
- Off-site disposal 0.0%
Of the under 1 pound released in 2024, under 1 pound went to air, 0 pounds to water, 0 pounds to land on site and 0 pounds to off-site disposal. None of it was a chemical TRI flags as a carcinogen (the OSHA list).
| Chemical | Released | Air | Water | Land | Off-site | Class |
|---|---|---|---|---|---|---|
| Lead And Lead Compounds | 0 | 0 | 0 | 0 | 0 | PBT |
| Nitrate compounds (water dissociable; reportable only when in aqueous solution) | 0 | 0 | 0 | 0 | 0 |
Source: EPA Toxics Release Inventory basic data file, reporting year 2024, forms processed as of November 5, 2025. Confirm in EPA's ECHO facility report.
What does EPA's compliance record show for Brannan Ready Mix - West Plant?
EPA's compliance database (ECHO) links Brannan Ready Mix - West Plant to FRS facility 110071956219. ECHO records no inspection in the last five years. Regulators took 0 formal enforcement actions in five years.
A violation is a permit or rule breach EPA or a state recorded; it is not a finding that the releases above were illegal. TRI releases are reported under a right-to-know law, not a permit.
Source: EPA Enforcement and Compliance History Online (ECHO) facility download, November 8, 2026. Confirm in ECHO detailed facility report.
How much waste did Brannan Ready Mix - West Plant manage, and where did it send it?
For 2024, Brannan Ready Mix - West Plant reported under 1 pound of production-related waste, the toxic chemicals it recycled, burned for energy, treated or released. It transferred 0 pounds off site, to recycling, energy recovery, treatment, disposal or a sewage treatment plant.
Source: EPA TRI basic data file 2024, sections 6 and 8 of the reporting form.
Which Superfund sites are near Brannan Ready Mix - West Plant?
| Site | Miles | Status |
|---|---|---|
| Broderick Wood Products | 0.4 | On the final NPL |
| Vasquez Boulevard and I-70 | 2.1 | On the final NPL |
| Woodbury Chemical Co. | 2.6 | Deleted from the NPL |
| Sand Creek Industrial | 3.8 | Deleted from the NPL |
| Chemical Sales Co. | 4.4 | On the final NPL |
| Denver Radium Site | 6.3 | On the final NPL |
| Rocky Mountain Arsenal (Usarmy) | 8.2 | On the final NPL |
Distance is straight-line between EPA's coordinates for each. Being near is not evidence that the facility contributed to a site.
Source: EPA SEMS National Priorities List (October 28, 2026) and EPA TRI facility coordinates.
What can Brannan Ready Mix - West Plant's figures not tell you?
They are Brannan Ready Mix - West Plant's own estimates, filed under penalty of law, not EPA measurements, and a release is not a measure of what people nearby are exposed to. What TRI figures can and cannot tell you.
Sources: the EPA files behind this page
- EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
- EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
- EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
- EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
- EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov