Techniseal US - Aberdeen Plant
Techniseal US - Aberdeen Plant in Aberdeen, NC reported under 1 pound of toxic chemical releases to EPA for 2024, 77% to water, led by lead compounds. It ranked 597th of 780 TRI facilities in North Carolina that year and 17,084th of 21,482 nationwide. (EPA Toxics Release Inventory, reporting year 2024; confirm it in this facility's EPA record.)
<1lbtoxic releases, 2024
23%to air
1chemical reported, 2024
0lbof them carcinogens
4quarters in violation of 12 (ECHO)
What did Techniseal US - Aberdeen Plant release in 2024?
- Air 23.1%
- Water 76.9%
- Land 0.0%
- Off-site disposal 0.0%
Of the under 1 pound released in 2024, under 1 pound went to air, under 1 pound to water, 0 pounds to land on site and 0 pounds to off-site disposal. None of it was a chemical TRI flags as a carcinogen (the OSHA list).
| Chemical | Released | Air | Water | Land | Off-site | Class |
|---|---|---|---|---|---|---|
| Lead compounds | 0 | 0 | 0 | 0 | 0 | PBT |
Source: EPA Toxics Release Inventory basic data file, reporting year 2024, forms processed as of November 5, 2025. Confirm in EPA's ECHO facility report.
What does EPA's compliance record show for Techniseal US - Aberdeen Plant?
EPA's compliance database (ECHO) links Techniseal US - Aberdeen Plant to FRS facility 110040754369. In the last 12 quarters it was in violation of an environmental permit or rule in 4 of 12. Inspectors visited 6 times in the last five years (latest September 18, 2026). Regulators took 0 formal enforcement actions in five years.
| Program | Status now | Quarters in violation, last 12 | Formal actions (5 yr) | Penalties (5 yr) |
|---|---|---|---|---|
| Clean Air Act | No Violation Identified | 4 | 0 | $0 |
| Clean Water Act | No Violation Identified | 0 | 0 | $0 |
A violation is a permit or rule breach EPA or a state recorded; it is not a finding that the releases above were illegal. TRI releases are reported under a right-to-know law, not a permit.
Source: EPA Enforcement and Compliance History Online (ECHO) facility download, November 8, 2026. Confirm in ECHO detailed facility report.
How much waste did Techniseal US - Aberdeen Plant manage, and where did it send it?
For 2024, Techniseal US - Aberdeen Plant reported under 1 pound of production-related waste, the toxic chemicals it recycled, burned for energy, treated or released. It transferred 0 pounds off site, to recycling, energy recovery, treatment, disposal or a sewage treatment plant.
Source: EPA TRI basic data file 2024, sections 6 and 8 of the reporting form.
Which Superfund sites are near Techniseal US - Aberdeen Plant?
| Site | Miles | Status |
|---|---|---|
| Aberdeen Contaminated Ground Water | 6.0 | On the final NPL |
| Geigy Chemical Corp. (Aberdeen Plant) | 6.2 | On the final NPL |
| Aberdeen Pesticide Dumps | 6.9 | On the final NPL |
Distance is straight-line between EPA's coordinates for each. Being near is not evidence that the facility contributed to a site.
Source: EPA SEMS National Priorities List (October 28, 2026) and EPA TRI facility coordinates.
What can Techniseal US - Aberdeen Plant's figures not tell you?
They are Techniseal US - Aberdeen Plant's own estimates, filed under penalty of law, not EPA measurements, and a release is not a measure of what people nearby are exposed to. What TRI figures can and cannot tell you.
Sources: the EPA files behind this page
- EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
- EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
- EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
- EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
- EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov