PlainEnviro

Non-transient non-community water system · Pennsylvania

Tilden Industrial Park drinking water

Tilden Industrial Park (PA3061067) is a non-transient non-community water system in Pennsylvania serving 4,000 people from groundwater. In the 10 years to the 2026 third-quarter report, EPA records 1 health-based violation and 12 monitoring, reporting or notice violations; 3 still open. Its latest lead 90th percentile (monitoring period beginning July 2025) was 0.006 mg/L, below the 0.015 mg/L action level that requires a system to act. UCMR 5 tests (2023-2025) detected 2 PFAS, none above the 2024 limits. (EPA SDWA data, October 14, 2026.)

Check this record at EPA: ECHO drinking water report for PA3061067

4,000people served

1health-based violation, 10 years

3violations still open

0.006mg/Llead, 90th percentile (period from 2025)

2PFAS detected (UCMR 5)

Is the water from Tilden Industrial Park safe to drink?

Tilden Industrial Park had 1 health-based violation in the 10 years to October 2026: a required treatment step not met. 3 violations are still open (not yet returned to compliance or resolved). Its full SDWIS record, older years included, holds 18 violations of every kind.

In Pennsylvania, 40% of the 1,849 active community systems had a health-based violation in the same 10 years.

In its measured results, its latest lead 90th percentile (period beginning July 2025) was 0.006 mg/L, below the 0.015 mg/L action level; EPA's UCMR 5 survey tested it for 30 substances and detected 2 PFAS, none above a 2024 limit level. It draws on groundwater for 4,000 people.

This is Tilden Industrial Park's compliance record, not a test of the water at your tap: what the records cannot tell you, and who can.

Source: EPA Safe Drinking Water Information System (SDWIS), federal data download, quarter 2026Q3, released October 14, 2026. Confirm in EPA ECHO drinking water search.

What violations does EPA record for Tilden Industrial Park?

EPA records 13 violations for Tilden Industrial Park since October 2016: 12 monitoring and reporting and 1 treatment technique.

Violations since October 2016, newest first
Contaminant or ruleKindCompliance periodStatus
Groundwater RuleMonitoring and reportingMay 2022Resolved
Lead and Copper RuleMonitoring and reportingsince July 2021Resolved
Groundwater RuleMonitoring and reportingJanuary 2021Resolved
Lead and Copper RuleMonitoring and reportingsince July 2019Resolved
Groundwater RuleTreatment technique (health-based)May 2019Resolved
Lead and Copper RuleMonitoring and reportingsince July 2018Open
Lead and Copper RuleMonitoring and reportingsince January 2018Open
Lead and Copper RuleMonitoring and reportingsince July 2017Open
Di(2-ethylhexyl) adipateMonitoring and reportingJanuary 2017 to December 2017Resolved
Benzo(a)pyreneMonitoring and reportingJanuary 2017 to December 2017Resolved
SimazineMonitoring and reportingJanuary 2017 to December 2017Resolved
AtrazineMonitoring and reportingJanuary 2017 to December 2017Resolved
Di(2-ethylhexyl) phthalateMonitoring and reportingJanuary 2017 to December 2017Resolved
Violations by year the compliance period began, Tilden Industrial Park (violations)
6220210000
Violations by year the compliance period began, Tilden Industrial Park
20176 violations
20182 violations
20192 violations
20200 violations
20212 violations
20221 violation
20230 violations
20240 violations
20250 violations
20260 violations

Source: SDWIS violations and enforcement, quarter 2026Q3; health-based means a maximum contaminant level, residual disinfectant level or treatment technique was not met.

How much lead and copper is in Tilden Industrial Park's tap samples?

Lead, 90th percentile of tap samples (period beginning July 2025)0.0060 mg/L Below the action level
Copper, 90th percentile (period beginning January 2022)1.38 mg/L Above the action level

Over the action level (Tilden Industrial Park's result is a 90th percentile: what that is), a system must treat the water to make it less corrosive, tell the public and replace lead lines. The Lead and Copper Rule Improvements (in effect since December 30, 2024) lower the lead action level to 0.010 mg/L from November 1, 2027.

Source: SDWIS lead and copper sample summaries (90th percentiles), quarter 2026Q3; Lead and Copper Rule Improvements: Federal Register, published October 30, 2024, effective December 30, 2024; 40 CFR 141.80(a)(4)(i) keeps 0.015 mg/L until November 1, 2027 and 141.80(c)(1) sets 0.010 mg/L from then (eCFR); both read November 11, 2026.

Did EPA find PFAS in Tilden Industrial Park's water?

UCMR 5 analytes detected at Tilden Industrial Park, 2023
AnalyteHighest resultReporting level2024 limitUnitSamples detectedQualifier
lithium12.29noneµg/L2 of 2Detected
PFBS14.83noneng/L2 of 2Detected
PFPeA33noneng/L1 of 2Detected

Not detected in any sample (27 of the 30 analytes tested): 11Cl-PF3OUdS, 4:2 FTS, 6:2 FTS, 8:2 FTS, 9Cl-PF3ONS, ADONA, HFPO-DA, NEtFOSAA, NFDHA, NMeFOSAA, PFBA, PFDA, PFDoA, PFEESA, PFHpA, PFHpS, PFHxA, PFHxS, PFMBA, PFMPA, PFNA, PFOA, PFOS, PFPeS, PFTA, PFTrDA, PFUnA.

UCMR 5 measured 29 PFAS and lithium in every community and non-transient non-community system serving 3,300 people or more (and a sample of 800 smaller ones) from 2023 to 2025. Its results show what was in the water; they are not compliance samples. The 2024 limits (PFOA and PFOS 4.0 ng/L; PFHxS, PFNA and HFPO-DA 10 ng/L) apply as running annual averages from 2029. In May 2026 EPA proposed keeping the PFOA and PFOS limits with an option to extend the date to 2031, and withdrawing the other three. PFAS results across the country

Source: EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5), final occurrence data released August 2026 (file dated October 15, 2026); 1 ng/L = 0.001 µg/L; 2024 PFAS limits: 40 CFR 141.61(c)(2) (eCFR); EPA proposals of May 2026: Federal Register documents 2026-10085 and 2026-10086 (May 20, 2026), no final rule; UCMR 5 results are survey, not compliance, data: UCMR 5 Data Summary (July 2026) and EPA's PFAS compliance quick reference guide (January 2025); all read November 11, 2026.

Who does Tilden Industrial Park serve, and where does its water come from?

Tilden Industrial Park is a non-transient non-community water system; EPA's inventory lists its owner type as local government, on EPA's inventory since 1996.

Community systems publish an annual water quality report (Consumer Confidence Report); a school or workplace system reports to its own users; how to find yours (EPA).

Source: SDWIS water system inventory and geographic areas served, quarter 2026Q3.

What other environmental records are in Berks County?

The TRI facilities in Berks County that reported the most toxic releases:

  1. Carpenter Technology Corp 2.5 million pounds
  2. East Penn Manufacturing Co Inc 586,395 pounds
  3. Global Advanced Metals USA 338,892 pounds
  4. Cambridge-Lee Industries 223,132 pounds
  5. Materion Brush Inc 119,265 pounds

Superfund sites in Berks County: Berks Landfill (deleted from the list); Cryochem, Inc. (on the National Priorities List); Douglassville Disposal (on the National Priorities List); Bally Ground Water Contamination (on the National Priorities List); Berks Sand Pit (on the National Priorities List).

A facility or site in the same county is not evidence that it affects this system's water; source-water protection is assessed by the state.

Source: EPA Toxics Release Inventory 2024 and EPA SEMS National Priorities List, as of October 28, 2026.

Sources: the EPA files behind this page
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) occurrence data, final data, August 2026: www.epa.gov
  • EPA Lead and Copper Rule and Lead and Copper Rule Improvements: www.epa.gov
  • EPA PFAS National Primary Drinking Water Regulation (2024) and the May 2026 proposal: www.epa.gov
  • EPA: find your local Consumer Confidence Report: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov