PlainEnviro

Non-transient non-community water system · Vermont

Mountain Top Inn and Resort drinking water

Mountain Top Inn and Resort (VT0001771) is a non-transient non-community water system in Chittenden, VT serving 528 people from groundwater. In the 10 years to the 2026 third-quarter report, EPA records 1 health-based violation and 125 monitoring, reporting or notice violations. Its latest lead 90th percentile (monitoring period beginning January 2026) was 0.001 mg/L, below the 0.015 mg/L action level that requires a system to act. (EPA SDWA data, October 14, 2026.)

Check this record at EPA: ECHO drinking water report for VT0001771

528people served

1health-based violation, 10 years

0violations still open

0.001mg/Llead, 90th percentile (period from 2026)

Is the water from Mountain Top Inn and Resort safe to drink?

Mountain Top Inn and Resort had 1 health-based violation in the 10 years to October 2026: a required treatment step not met. Every violation since October 2016 is resolved or archived. Its full SDWIS record, older years included, holds 143 violations of every kind.

In Vermont, 18% of the 404 active community systems had a health-based violation in the same 10 years.

In its measured results, its latest lead 90th percentile (period beginning January 2026) was 0.001 mg/L, below the 0.015 mg/L action level. It draws on groundwater for 528 people.

This is Mountain Top Inn and Resort's compliance record, not a test of the water at your tap: what the records cannot tell you, and who can.

Source: EPA Safe Drinking Water Information System (SDWIS), federal data download, quarter 2026Q3, released October 14, 2026. Confirm in EPA ECHO drinking water search.

What violations does EPA record for Mountain Top Inn and Resort?

EPA records 126 violations for Mountain Top Inn and Resort since October 2016: 122 monitoring and reporting, 2 monitoring, 1 other (public notice, consumer report), and 1 treatment technique.

Violations since October 2016, newest first (first 40 of 126)
Contaminant or ruleKindCompliance periodStatus
Public NoticeOther (public notice, consumer report)since December 2024Resolved
Lead and Copper RuleTreatment technique (health-based)since October 2024Resolved
EthylbenzeneMonitoring and reportingJuly 2021 to September 2021Resolved
TolueneMonitoring and reportingJuly 2021 to September 2021Resolved
TetrachloroethyleneMonitoring and reportingJuly 2021 to September 2021Resolved
p-DichlorobenzeneMonitoring and reportingJuly 2021 to September 2021Resolved
StyreneMonitoring and reportingJuly 2021 to September 2021Resolved
1,1,2-TrichloroethaneMonitoring and reportingJuly 2021 to September 2021Resolved
Carbon tetrachlorideMonitoring and reportingJuly 2021 to September 2021Resolved
trans-1,2-DichloroethyleneMonitoring and reportingJuly 2021 to September 2021Resolved
1,1,1-TrichloroethaneMonitoring and reportingJuly 2021 to September 2021Resolved
1,1-DichloroethyleneMonitoring and reportingJuly 2021 to September 2021Resolved
1,2,4-TrichlorobenzeneMonitoring and reportingJuly 2021 to September 2021Resolved
ChlorobenzeneMonitoring and reportingJuly 2021 to September 2021Resolved
TrichloroethyleneMonitoring and reportingJuly 2021 to September 2021Resolved
1,2-DichloropropaneMonitoring and reportingJuly 2021 to September 2021Resolved
1,2-DichloroethaneMonitoring and reportingJuly 2021 to September 2021Resolved
Vinyl chlorideMonitoring and reportingJuly 2021 to September 2021Resolved
o-DichlorobenzeneMonitoring and reportingJuly 2021 to September 2021Resolved
DichloromethaneMonitoring and reportingJuly 2021 to September 2021Resolved
Xylenes, TotalMonitoring and reportingJuly 2021 to September 2021Resolved
cis-1,2-DichloroethyleneMonitoring and reportingJuly 2021 to September 2021Resolved
BenzeneMonitoring and reportingJuly 2021 to September 2021Resolved
HexachlorobenzeneMonitoring and reportingApril 2020 to June 2020Resolved
LassoMonitoring and reportingApril 2020 to June 2020Resolved
Benzo(a)pyreneMonitoring and reportingApril 2020 to June 2020Resolved
PentachlorophenolMonitoring and reportingApril 2020 to June 2020Resolved
CarbofuranMonitoring and reportingApril 2020 to June 2020Resolved
OxamylMonitoring and reportingApril 2020 to June 2020Resolved
1,2-Dibromo-3-ChloropropaneMonitoring and reportingApril 2020 to June 2020Resolved
HeptachlorMonitoring and reportingApril 2020 to June 2020Resolved
2,4,5-TPMonitoring and reportingApril 2020 to June 2020Resolved
DinosebMonitoring and reportingApril 2020 to June 2020Resolved
Total Polychlorinated Biphenyls (PCB)Monitoring and reportingApril 2020 to June 2020Resolved
PicloramMonitoring and reportingApril 2020 to June 2020Resolved
BHC-GammaMonitoring and reportingApril 2020 to June 2020Resolved
2,4-DMonitoring and reportingApril 2020 to June 2020Resolved
ChlordaneMonitoring and reportingApril 2020 to June 2020Resolved
Ethylene DibromideMonitoring and reportingApril 2020 to June 2020Resolved
Heptachlor epoxideMonitoring and reportingApril 2020 to June 2020Resolved
Violations by year the compliance period began, Mountain Top Inn and Resort (violations)
7400292100200
Violations by year the compliance period began, Mountain Top Inn and Resort
201774 violations
20180 violations
20190 violations
202029 violations
202121 violations
20220 violations
20230 violations
20242 violations
20250 violations
20260 violations

Source: SDWIS violations and enforcement, quarter 2026Q3; health-based means a maximum contaminant level, residual disinfectant level or treatment technique was not met.

How much lead and copper is in Mountain Top Inn and Resort's tap samples?

Lead, 90th percentile of tap samples (period beginning January 2026)0.0011 mg/L Below the action level
Copper, 90th percentile (period beginning July 2024)2.3 mg/L Above the action level

Over the action level (Mountain Top Inn and Resort's result is a 90th percentile: what that is), a system must treat the water to make it less corrosive, tell the public and replace lead lines. The Lead and Copper Rule Improvements (in effect since December 30, 2024) lower the lead action level to 0.010 mg/L from November 1, 2027.

Source: SDWIS lead and copper sample summaries (90th percentiles), quarter 2026Q3; Lead and Copper Rule Improvements: Federal Register, published October 30, 2024, effective December 30, 2024; 40 CFR 141.80(a)(4)(i) keeps 0.015 mg/L until November 1, 2027 and 141.80(c)(1) sets 0.010 mg/L from then (eCFR); both read November 11, 2026.

Who does Mountain Top Inn and Resort serve, and where does its water come from?

Mountain Top Inn and Resort is a non-transient non-community water system; EPA's inventory lists its owner type as private, on EPA's inventory since 1982.

It reports serving Chittenden, in Rutland county.

Community systems publish an annual water quality report (Consumer Confidence Report); a school or workplace system reports to its own users; how to find yours (EPA).

Source: SDWIS water system inventory and geographic areas served, quarter 2026Q3.

What other environmental records are in Rutland County?

The TRI facilities in Rutland County that reported the most toxic releases:

  1. GE Aerospace Plant 2 35,018 pounds
  2. GE Aerospace Plant 1 18,131 pounds
  3. Questech Corp 1,798 pounds
  4. Isovolta/U.S. Samica 1,433 pounds
  5. First Light Technologies Inc under 1 pound

A facility or site in the same county is not evidence that it affects this system's water; source-water protection is assessed by the state.

Source: EPA Toxics Release Inventory 2024 and EPA SEMS National Priorities List, as of October 28, 2026.

Sources: the EPA files behind this page
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) occurrence data, final data, August 2026: www.epa.gov
  • EPA Lead and Copper Rule and Lead and Copper Rule Improvements: www.epa.gov
  • EPA PFAS National Primary Drinking Water Regulation (2024) and the May 2026 proposal: www.epa.gov
  • EPA: find your local Consumer Confidence Report: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov