PlainEnviro

Non-transient non-community water system · Illinois

Sherrard Jr/Sr High School drinking water

Sherrard Jr/Sr High School (IL3090290) is a non-transient non-community water system in Illinois serving 800 people from groundwater. In the 10 years to the 2026 third-quarter report, EPA records no health-based violation and 16 monitoring, reporting or notice violations; 3 still open. Its latest lead 90th percentile (monitoring period beginning January 2025) was 0.007 mg/L, below the 0.015 mg/L action level that requires a system to act. UCMR 5 tests (2023-2025) found no PFAS above the reporting levels. (EPA SDWA data, October 14, 2026.)

Check this record at EPA: ECHO drinking water report for IL3090290

800people served

0health-based violations, 10 years

3violations still open

0.007mg/Llead, 90th percentile (period from 2025)

0PFAS detected (UCMR 5)

Is the water from Sherrard Jr/Sr High School safe to drink?

Sherrard Jr/Sr High School had no health-based violation in the 10 years to October 2026: EPA records no time its water broke a limit or a required treatment step. 3 violations are still open (not yet returned to compliance or resolved). Its full SDWIS record, older years included, holds 28 violations of every kind.

In Illinois, 23% of the 1,788 active community systems had a health-based violation in the same 10 years.

In its measured results, its latest lead 90th percentile (period beginning January 2025) was 0.007 mg/L, below the 0.015 mg/L action level; EPA's UCMR 5 survey tested it for 30 substances and detected no PFAS. It draws on groundwater for 800 people.

This is Sherrard Jr/Sr High School's compliance record, not a test of the water at your tap: what the records cannot tell you, and who can.

Source: EPA Safe Drinking Water Information System (SDWIS), federal data download, quarter 2026Q3, released October 14, 2026. Confirm in EPA ECHO drinking water search.

What violations does EPA record for Sherrard Jr/Sr High School?

EPA records 16 violations for Sherrard Jr/Sr High School since October 2016: 8 monitoring and reporting, 4 other (public notice, consumer report), 3 monitoring, and 1 reporting.

Violations since October 2016, newest first
Contaminant or ruleKindCompliance periodStatus
Public NoticeOther (public notice, consumer report)since February 2026Open
Public NoticeOther (public notice, consumer report)since January 2026Resolved
Public NoticeOther (public notice, consumer report)since March 2025Open
Public NoticeOther (public notice, consumer report)since November 2024Open
Lead and Copper RuleMonitoring and reportingsince October 2024Resolved
Revised Total Coliform RuleMonitoringJuly 2024 to September 2024Resolved
Revised Total Coliform RuleReportingsince January 2024Resolved
Lead and Copper RuleMonitoring and reportingsince October 2023Resolved
Revised Total Coliform RuleMonitoringJuly 2023 to September 2023Resolved
Lead and Copper RuleMonitoring and reportingsince February 2023Resolved
AsbestosMonitoring and reportingJanuary 2023 to December 2025Resolved
Revised Total Coliform RuleMonitoringMarch 2021Resolved
Lead and Copper RuleMonitoring and reportingsince January 2021Resolved
Lead and Copper RuleMonitoring and reportingsince July 2018Resolved
Lead and Copper RuleMonitoring and reportingsince January 2018Resolved
Lead and Copper RuleMonitoring and reportingsince July 2017Resolved
Violations by year the compliance period began, Sherrard Jr/Sr High School (violations)
1200204412
Violations by year the compliance period began, Sherrard Jr/Sr High School
20171 violation
20182 violations
20190 violations
20200 violations
20212 violations
20220 violations
20234 violations
20244 violations
20251 violation
20262 violations

Source: SDWIS violations and enforcement, quarter 2026Q3; health-based means a maximum contaminant level, residual disinfectant level or treatment technique was not met.

How much lead and copper is in Sherrard Jr/Sr High School's tap samples?

Lead, 90th percentile of tap samples (period beginning January 2025)0.0074 mg/L Below the action level
Copper, 90th percentile (period beginning January 2019)2.5 mg/L Above the action level

Over the action level (Sherrard Jr/Sr High School's result is a 90th percentile: what that is), a system must treat the water to make it less corrosive, tell the public and replace lead lines. The Lead and Copper Rule Improvements (in effect since December 30, 2024) lower the lead action level to 0.010 mg/L from November 1, 2027.

Source: SDWIS lead and copper sample summaries (90th percentiles), quarter 2026Q3; Lead and Copper Rule Improvements: Federal Register, published October 30, 2024, effective December 30, 2024; 40 CFR 141.80(a)(4)(i) keeps 0.015 mg/L until November 1, 2027 and 141.80(c)(1) sets 0.010 mg/L from then (eCFR); both read November 11, 2026.

Did EPA find PFAS in Sherrard Jr/Sr High School's water?

UCMR 5 analytes detected at Sherrard Jr/Sr High School, 2024
AnalyteHighest resultReporting level2024 limitUnitSamples detectedQualifier
lithium259noneµg/L2 of 2Detected

Not detected in any sample (29 of the 30 analytes tested): 11Cl-PF3OUdS, 4:2 FTS, 6:2 FTS, 8:2 FTS, 9Cl-PF3ONS, ADONA, HFPO-DA, NEtFOSAA, NFDHA, NMeFOSAA, PFBA, PFBS, PFDA, PFDoA, PFEESA, PFHpA, PFHpS, PFHxA, PFHxS, PFMBA, PFMPA, PFNA, PFOA, PFOS, PFPeA, PFPeS, PFTA, PFTrDA, PFUnA.

UCMR 5 measured 29 PFAS and lithium in every community and non-transient non-community system serving 3,300 people or more (and a sample of 800 smaller ones) from 2023 to 2025. Its results show what was in the water; they are not compliance samples. The 2024 limits (PFOA and PFOS 4.0 ng/L; PFHxS, PFNA and HFPO-DA 10 ng/L) apply as running annual averages from 2029. In May 2026 EPA proposed keeping the PFOA and PFOS limits with an option to extend the date to 2031, and withdrawing the other three. PFAS results across the country

Source: EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5), final occurrence data released August 2026 (file dated October 15, 2026); 1 ng/L = 0.001 µg/L; 2024 PFAS limits: 40 CFR 141.61(c)(2) (eCFR); EPA proposals of May 2026: Federal Register documents 2026-10085 and 2026-10086 (May 20, 2026), no final rule; UCMR 5 results are survey, not compliance, data: UCMR 5 Data Summary (July 2026) and EPA's PFAS compliance quick reference guide (January 2025); all read November 11, 2026.

Who does Sherrard Jr/Sr High School serve, and where does its water come from?

Sherrard Jr/Sr High School is a non-transient non-community water system; EPA's inventory lists its owner type as public/Private, on EPA's inventory since 1981.

Community systems publish an annual water quality report (Consumer Confidence Report); a school or workplace system reports to its own users; how to find yours (EPA).

Source: SDWIS water system inventory and geographic areas served, quarter 2026Q3.

What other environmental records are in Rock Island County?

The TRI facilities in Rock Island County that reported the most toxic releases:

  1. Tyson Fresh Meats Inc - Joslin IL 1.7 million pounds
  2. 3M Chemical Operations' Cordova Facility 82,300 pounds
  3. Sherwin-Williams Co 36,273 pounds
  4. John Deere Harvester Works East Moline 33,745 pounds
  5. John Deere Seeding & Cylinder 11,806 pounds

A facility or site in the same county is not evidence that it affects this system's water; source-water protection is assessed by the state.

Source: EPA Toxics Release Inventory 2024 and EPA SEMS National Priorities List, as of October 28, 2026.

Sources: the EPA files behind this page
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) occurrence data, final data, August 2026: www.epa.gov
  • EPA Lead and Copper Rule and Lead and Copper Rule Improvements: www.epa.gov
  • EPA PFAS National Primary Drinking Water Regulation (2024) and the May 2026 proposal: www.epa.gov
  • EPA: find your local Consumer Confidence Report: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov