PlainEnviro

Parent company · TRI

Nda Engineering toxic releases

Nda Engineering's 1 TRI facility reported 450 pounds of toxic chemical releases to EPA for 2024, 96% of it to air. It ranked 2,854th of 4,231 parent companies by 2024 releases. 2 facilities have named it as parent company since 2019. (EPA TRI 2019-2024.)

Check this record at EPA: EPA TRI basic data files (the parent company column)

450lbreleased, 2024

1facility reporting, 2024

2facilities since 2019

1state

How do Nda Engineering's 2024 releases compare?

Nda Engineering ranked 2,854th of 4,231 parent companies by 2024 releases. 96% of the 2024 total went to air, 0% to land on site, 4% to water and 0% to off-site disposal. Its facilities filed 2024 TRI forms for 4 chemicals; manganese was released in the largest amount (420 pounds, 93% of the total, from 1 facility). Against 2023 (563 pounds from 1 facility), 2024 was lower by 20%. Against 2019 (1,101 pounds from 1 facility), 2024 was lower by 59%.

Source: Computed by PlainEnviro from the EPA TRI basic data files 2019-2024 (forms naming this parent).

Which facilities does Nda Engineering report to TRI?

  1. Southern Heat Exchanger CorpTuscaloosa, AL 450 pounds
Facilities that named Nda Engineering as parent, 2019-2024 (pounds released)
FacilityPlaceReleased 2024Last reported (if before 2024)Released that year
Southern Heat Exchanger CorpTuscaloosa, AL450
Southern Heat Exchanger CorpTuscaloosa, ALnot reported202121,879

Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.

Are Nda Engineering's releases going up or down?

Toxic releases reported under Nda Engineering, 2019-2024 (pounds)
1,10137K22K389563450
Toxic releases reported under Nda Engineering, 2019-2024
20191,101 pounds
202037K pounds
202122K pounds
2022389 pounds
2023563 pounds
2024450 pounds

Releases reported under Nda Engineering fell from 1,101 pounds in 2019 to 450 pounds in 2024 (-59%), from the same number of facilities in both years (1). Each year counts the forms that named it as parent, so facilities it bought or sold count only in their years under it.

Source: EPA TRI basic data files 2019-2024.

Which chemicals did Nda Engineering's facilities release most in 2024?

Across its facilities, Nda Engineering reported releases above zero of 4 chemicals for 2024; manganese was the largest at 420 pounds (93%).

  1. Manganese1 facility 420 pounds
  2. Nickel1 facility 10 pounds
  3. Chromium1 facility 10 pounds
  4. Copper1 facility 10 pounds

Source: EPA Toxics Release Inventory basic data files 2019-2024 (standardized parent company name on each form); reporting year 2024 forms processed as of November 5, 2025. Confirm in EPA's TRI basic data files.

What can the figures under Nda Engineering not tell you?

They add up what each facility naming Nda Engineering as parent estimated and filed (EPA standardizes the parent name): not EPA measurements, and a release is not a measure of what people nearby are exposed to; inspections, violations and penalties are on each facility's page. What TRI figures can and cannot tell you.

Sources: the EPA files behind this page
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
  • EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov