PlainEnviro

TRI facility · Arizona

Icp Construction (Previously Arizona Polymer Flooring)

Icp Construction (Previously Arizona Polymer Flooring) in Phoenix, AZ reported 332 pounds of toxic chemical releases to EPA for 2024, 100% to air, led by xylene (mixed isomers). It ranked 127th of 309 TRI facilities in Arizona that year and 10,975th of 21,482 nationwide. (EPA Toxics Release Inventory, reporting year 2024; confirm it in this facility's EPA record.)

332lbtoxic releases, 2024

100%to air

2chemicals reported, 2024

0lbof them carcinogens

0quarters in violation of 12 (ECHO)

What did Icp Construction (Previously Arizona Polymer Flooring) release in 2024?

Where Icp Construction (Previously Arizona Polymer Flooring)'s 2024 releases went
  • Air 100.0%
  • Water 0.0%
  • Land 0.0%
  • Off-site disposal 0.0%

Of the 332 pounds released in 2024, 332 pounds went to air, 0 pounds to water, 0 pounds to land on site and 0 pounds to off-site disposal. None of it was a chemical TRI flags as a carcinogen (the OSHA list).

Chemicals Icp Construction (Previously Arizona Polymer Flooring) reported for 2024, by releases (pounds)
ChemicalReleasedAirWaterLandOff-site
Xylene (mixed isomers)332332000
Diisocyanates00000

Source: EPA Toxics Release Inventory basic data file, reporting year 2024, forms processed as of November 5, 2025. Confirm in EPA's ECHO facility report.

Are Icp Construction (Previously Arizona Polymer Flooring)'s releases going up or down?

Toxic releases reported by Icp Construction (Previously Arizona Polymer Flooring), 2019-2024 (pounds)
1,2848247701,021332
Toxic releases reported by Icp Construction (Previously Arizona Polymer Flooring), 2019-2024
20191,284 pounds
2020824 pounds
2021770 pounds
20231,021 pounds
2024332 pounds

Releases reported by Icp Construction (Previously Arizona Polymer Flooring) fell from 1,284 pounds in 2019 to 332 pounds in 2024 (-74%). It filed no report for 2022.

Its rank among Arizona's TRI facilities by releases, each year: 2019: 99th of 276; 2020: 107th of 275; 2021: 107th of 279; 2023: 101st of 306; 2024: 127th of 309.

Source: EPA TRI basic data files 2019-2024; ranks computed by PlainEnviro among the facilities that reported each year.

What does EPA's compliance record show for Icp Construction (Previously Arizona Polymer Flooring)?

EPA's compliance database (ECHO) links Icp Construction (Previously Arizona Polymer Flooring) to FRS facility 110070206147. In the last 12 quarters it was in violation of an environmental permit or rule in 0 of 12. Inspectors visited 2 times in the last five years (latest April 23, 2025). Regulators took 0 formal enforcement actions in five years.

Compliance by program, last 12 quarters (ECHO, November 8, 2026)
ProgramStatus nowQuarters in violation, last 12Formal actions (5 yr)Penalties (5 yr)
Hazardous waste (RCRA)No Violation Identified00$0

A violation is a permit or rule breach EPA or a state recorded; it is not a finding that the releases above were illegal. TRI releases are reported under a right-to-know law, not a permit.

Source: EPA Enforcement and Compliance History Online (ECHO) facility download, November 8, 2026. Confirm in ECHO detailed facility report.

How much waste did Icp Construction (Previously Arizona Polymer Flooring) manage, and where did it send it?

For 2024, Icp Construction (Previously Arizona Polymer Flooring) reported 1,894 pounds of production-related waste, the toxic chemicals it recycled, burned for energy, treated or released. It transferred 1,562 pounds off site, to recycling, energy recovery, treatment, disposal or a sewage treatment plant.

Source: EPA TRI basic data file 2024, sections 6 and 8 of the reporting form.

Which Superfund sites are near Icp Construction (Previously Arizona Polymer Flooring)?

National Priorities List sites within 10 miles, nearest first
SiteMilesStatus
Nineteenth Avenue Landfill3.8Deleted from the NPL

Distance is straight-line between EPA's coordinates for each. Being near is not evidence that the facility contributed to a site.

Source: EPA SEMS National Priorities List (October 28, 2026) and EPA TRI facility coordinates.

What can Icp Construction (Previously Arizona Polymer Flooring)'s figures not tell you?

They are Icp Construction (Previously Arizona Polymer Flooring)'s own estimates, filed under penalty of law, not EPA measurements, and a release is not a measure of what people nearby are exposed to. What TRI figures can and cannot tell you.

Sources: the EPA files behind this page
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA Toxics Release Inventory program (who reports, what counts as a release): www.epa.gov
  • EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov