EPA TRI Facility · Petroleum
Fort Myer Construction Plant 1
Washington, DC
- Total releases
- 410 lbs
- Chemicals reported
- 2
- Carcinogens
- 1
- Primary pathway
- Air Releases
AIR Form-R mix
Fort Myer Construction Plant 1: how the 419 lbs splits
419 lbs across all reported pathways
- Air Releases 419 lbs 100.0%
Fort Myer Construction Plant 1's 419 lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Polycyclic aromatic compounds.
TRACE volume AIR pathway CARC-HEAVY
Fort Myer Construction Plant 1 is an EPA Toxics Release Inventory reporter in Washington, DC, in the petroleum sector. It reported 9 lbs of releases across 2 chemicals in 2024, and 410 lbs in total across its 2019-2024 reporting years. That ranks 15,038 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In District of Columbia's 12 reporting TRI sites, pounds #1 is not chemical-count #1. Fort Myer Construction Plant 1 is pounds #8 and chemical-count #7 at 410 lbs. US Army Corps of Engineers McMillan WTP Washington Aqueduc leads reported pounds (73.2K lbs) at 4 chemicals (chemical-count #2). Fort Totten Ready Mix Concrete leads chemical count at 5 chemicals (4.9K lbs, pounds #3). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Fort Myer Construction Plant 2; US Army Corps of Engineers McMillan WTP Washington Aqueduc; Virginia Concrete Queens Chapel Plant; US Secret Service. Similar-scale Petroleum peers outside District of Columbia: Vance Brothers LLC; Mdu Resources Knife River Sundial Asphalt; Weblain&sons Inc Natchez Asphalt Plant; Building Materials Manufacturing LLC. Largest disclosed chemicals by pounds: Polycyclic aromatic compounds; Benzo[g,h,i]perylene.
Fort Myer Construction Plant 1 stamps TRACE volume with a dominant AIR pathway (100.0% air releases) across 2 chemicals · 1 carcinogen-classified. Cumulative Form-R extract: 410 lbs (2019–2024). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Vance Brothers LLC and Mdu Resources Knife River Sundial Asphalt.
Fort Myer Construction Plant 1 vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
410 lbs 42nd percentile higher than 42% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Fort Myer Construction Plant 1 in the Petroleum sector extract
Among the 902 Petroleum facilities in this database, Fort Myer Construction Plant 1 reports the 371st-largest volume (410 lbs). Scale peers outside District of Columbia include Vance Brothers LLC and Mdu Resources Knife River Sundial Asphalt.
Sector rank uses reported TRI pounds only. Share callouts need ≥1,000 lbs so tiny totals cannot mint a false signal.
Fort Myer Construction Plant 1 Form-R facts
Compare this facility
See how Fort Myer Construction Plant 1 stacks up against nearby facilities and the typical reporter.
62% less than the comparison
About the same as the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How Fort Myer Construction Plant 1 releases toxic chemicals into the environment. Total: 419 lbs.
Emissions Trend Summary
From 2019 to 2024, total releases decreased by 93% (132 lbs to 9 lbs).
Fort Myer Construction Plant 1: annual Form-R pounds
TRACE site · AIR pathway · TRI years 2019–2024
- 2019 0
- 2020 0
- 2021 0
- 2022 0
- 2023 0
- 2024 0
What this shows Fort Myer Construction Plant 1 year-over-year reported totals (decreased by 93% from 2019 to 2024). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Polycyclic aromatic compounds.
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 132 lbs | 1 |
| 2020 | 150 lbs | 1 |
| 2021 | 104 lbs | 1 |
| 2022 | 11 lbs | 2 |
| 2023 | 14 lbs | 2 |
| 2024 | 9 lbs | 2 |
Chemical Releases
Aggregated across all reporting years (2019–2024). 1 of 2 chemicals are carcinogens. Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Polycyclic aromatic compounds | 419 lbs | Carcinogen |
| Benzo[g,h,i]perylene | 0 lbs | - |
Fort Myer Construction Plant 1 · AIR-pathway site
Nearest TRI Facilities to Fort Myer Construction Plant 1
Closest other reporters in District of Columbia - including Fort Myer Construction Plant 2, US Army Corps of Engineers McMillan WTP Washington Aqueduc, Virginia Concrete Queens Chapel Plant, ordered by distance.
Showing 8 of 11 other reporting facilities in District of Columbia.
Similar Petroleum Facilities
Other Petroleum facilities with similar total release volumes (±80%), outside District of Columbia - e.g. Vance Brothers LLC, Mdu Resources Knife River Sundial Asphalt, Weblain&sons Inc Natchez Asphalt Plant.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Polycyclic aromatic compounds, Benzo[g,h,i]perylene; nearby reporters include Fort Myer Construction Plant 2. Fort Myer Construction Plant 1 stamps TRACE volume · AIR pathway · CARC-HEAVY carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Fort Myer Construction Plant 1 TRI extract (TRACE · AIR · CARC-HEAVY · lead Polycyclic aromatic compounds) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Fort Myer Construction Plant 1 totals are self-reported EPCRA §313 estimates for Washington, DC, latest year 2023. Form-R rows span 2019–2024 (6 years). NAICS 324121 · Petroleum. 0.4% of District Of Columbia TRI pounds in this extract. Nearest ABS peer: Petersen Inc (Δ 0 lbs). Pounds ≠ exposure.
Fort Myer Construction Plant 1 stamps TRACE volume · AIR pathway · CARC-HEAVY · lead Polycyclic aromatic compounds. PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov