EPA TRI Facility · Nonmetallic Mineral Product
Fairburn Ready Mix - Jenkinsburg Plant
Jenkinsburg, GA · Parent: Lehigh Hanson
- Total releases
- 1 lbs
- Chemicals reported
- 1
- Latest report
- 2021
- Primary pathway
- Air Releases
AIR Form-R mix
Fairburn Ready Mix - Jenkinsburg Plant: how the 1 lbs splits
1 lbs across all reported pathways
- Air Releases 1 lbs 100.0%
Fairburn Ready Mix - Jenkinsburg Plant's 1 lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Lead And Lead Compounds.
TRACE volume AIR pathway CLEAN
Fairburn Ready Mix - Jenkinsburg Plant is an EPA Toxics Release Inventory reporter in Jenkinsburg, GA, in the nonmetallic mineral product sector. It reported 0 lbs of releases across 1 chemical in 2021, and 1 lbs in total across its 2019-2021 reporting years. That ranks 19,986 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Georgia's 705 reporting TRI sites, pounds #1 is not chemical-count #1. Fairburn Ready Mix - Jenkinsburg Plant is pounds #623 and chemical-count #663 at 1 lbs. Rayonier Performance Fibers Jesup Mill leads reported pounds (22.6M lbs) at 26 chemicals (chemical-count #4). Bowen Steam Electric Generating Plant leads chemical count at 30 chemicals (3.3M lbs, pounds #18). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Argos Locust Grove Concrete Plant; Luxottica Atlanta Service Center; Behr Process LLC - Atlanta; Zinus USA Inc.. Similar-scale Nonmetallic Mineral Product peers outside Georgia: Ready Mixed Concrete Co Bellevue Plant; Mmc Materials Inc Hernando Temp Site; Ready Mixed Concrete Co Millard Plant; Roosevelt Ready Mix Plant. Other Lehigh Hanson sites in this extract: Essroc Cement Corp; Lehigh Southwest Cement Co; Glendale Plant #45; Sherman Industries LLC - Birmingham City Plant. Largest disclosed chemicals by pounds: Lead And Lead Compounds.
Fairburn Ready Mix - Jenkinsburg Plant stamps TRACE volume with a dominant AIR pathway (100.0% air releases) across 1 chemical. Cumulative Form-R extract: 1 lbs (2019–2021). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Ready Mixed Concrete Co Bellevue Plant and Mmc Materials Inc Hernando Temp Site.
Fairburn Ready Mix - Jenkinsburg Plant vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
1 lbs 23rd percentile higher than 23% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Fairburn Ready Mix - Jenkinsburg Plant inside Butts's TRI pounds
Among the 3,265 Nonmetallic Mineral Product facilities in this database, Fairburn Ready Mix - Jenkinsburg Plant reports the 1,663rd-largest volume (1 lbs). This one site accounts for 100% of every pound reported in Butts. Scale peers outside Georgia include Ready Mixed Concrete Co Bellevue Plant and Mmc Materials Inc Hernando Temp Site.
County-dominant here means ≥25% of Butts's reported pounds (1 lbs county total). Shares only print when the site reports ≥1,000 lbs.
Fairburn Ready Mix - Jenkinsburg Plant Form-R facts
Compare this facility
See how Fairburn Ready Mix - Jenkinsburg Plant stacks up against nearby facilities and the typical reporter.
4.9× more than the comparison
About the same as the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How Fairburn Ready Mix - Jenkinsburg Plant releases toxic chemicals into the environment. Total: 1 lbs.
Emissions Trend Summary
From 2019 to 2021, total releases decreased by 17% (0 lbs to 0 lbs).
Fairburn Ready Mix - Jenkinsburg Plant: annual Form-R pounds
TRACE site · AIR pathway · TRI years 2019–2021
- 2019 0
- 2020 0
- 2021 0
What this shows Fairburn Ready Mix - Jenkinsburg Plant year-over-year reported totals (decreased by 17% from 2019 to 2021). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Lead And Lead Compounds.
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 0 lbs | 1 |
| 2020 | 0 lbs | 1 |
| 2021 | 0 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2019–2021). Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Lead And Lead Compounds | 1 lbs | - |
Fairburn Ready Mix - Jenkinsburg Plant · AIR-pathway site
Nearest TRI Facilities to Fairburn Ready Mix - Jenkinsburg Plant
Closest other reporters in Georgia - including Argos Locust Grove Concrete Plant, Luxottica Atlanta Service Center, Behr Process LLC - Atlanta, ordered by distance.
Showing 8 of 704 other reporting facilities in Georgia.
Similar Nonmetallic Mineral Product Facilities
Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside Georgia - e.g. Ready Mixed Concrete Co Bellevue Plant, Mmc Materials Inc Hernando Temp Site, Ready Mixed Concrete Co Millard Plant.
Other Lehigh Hanson Facilities
Same-parent TRI sites ranked by reported releases - including Essroc Cement Corp, Lehigh Southwest Cement Co, Glendale Plant #45.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Lead And Lead Compounds; nearby reporters include Argos Locust Grove Concrete Plant. Fairburn Ready Mix - Jenkinsburg Plant stamps TRACE volume · AIR pathway · CLEAN carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Fairburn Ready Mix - Jenkinsburg Plant TRI extract (TRACE · AIR · CLEAN · lead Lead And Lead Compounds) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Fairburn Ready Mix - Jenkinsburg Plant totals are self-reported EPCRA §313 estimates for Jenkinsburg, GA, latest year 2021. Form-R rows span 2019–2021 (3 years). NAICS 327320 · Nonmetallic Mineral Product. 100% of Butts TRI pounds in this extract. Nearest ABS peer: Ready Mixed Concrete Co Bellevue Plant (Δ 0 lbs). Pounds ≠ exposure.
Fairburn Ready Mix - Jenkinsburg Plant stamps TRACE volume · AIR pathway · CLEAN · lead Lead And Lead Compounds. PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov