South Tyler Asphalt Plant – Emissions Trend

Tyler, TX · 2022–2023

This page assembles 2 consecutive years of EPA Toxics Release Inventory Form R filings for South Tyler Asphalt Plant, spanning 2022–2023. Each annual total aggregates on-site air emissions, surface-water discharges, land disposal, and off-site transfers reported by the facility under EPCRA Section 313, which requires disclosure whenever a listed chemical is manufactured, processed, or otherwise used above threshold quantities.

Reported releases opened at 124 in 2022 and closed at 127 in 2023 – a flat trend of 2.4% over the window. The chart below stacks the four TRI release media (air, water, land, off-site) and overlays the yearly total. The top contributor by cumulative mass is Polycyclic aromatic compounds at 251.

Because TRI figures are estimated, not metered, year-over-year deltas can reflect methodology revisions, ownership changes, or shifts in what a facility classifies as reportable, not only physical emission changes. Treat the trajectory as a disclosure record, and cross-reference with the EPA Enforcement and Compliance History Online (ECHO) system for the fuller regulatory picture on this petroleum facility.

Overall Trend
→ Stable (+2.4%)
2022 Total
124 lbs
2023 Total
127 lbs

Total Releases by Category

Air
Water
Land
Offsite Transfer
0255176102127 20222023 Pounds Released

Year-over-Year Comparison

Year Total Chemicals YoY Change
2022 124 lbs 1 -
2023 127 lbs 1 +2.4%

Top Chemicals by Year

Chemical 20222023 Total
Polycyclic aromatic compounds 124 127 251

About This Data

Trend data is sourced from the EPA Toxic Release Inventory (TRI). Facilities report annually. Release quantities are self-reported estimates. Year-over-year changes may reflect changes in production, pollution control measures, reporting methodology, or chemical thresholds.

A decrease in reported releases does not necessarily indicate improved environmental performance, as it may reflect production cutbacks, facility closures, or changes in reporting requirements. Similarly, increases may reflect expanded production rather than degraded environmental practices.

Frequently Asked Questions

Is South Tyler Asphalt Plant getting cleaner or dirtier?
Based on EPA TRI data from 2022–2023, South Tyler Asphalt Plant's total toxic releases have remained relatively stable.
What time period does this trend data cover?
This page shows 2 years of EPA Toxic Release Inventory data from 2022–2023. Release quantities are self-reported estimates filed annually by the facility.