PlainEnviro

Superfund site · Puerto Rico

GE Wiring Devices Superfund site

GE Wiring Devices in Juana Diaz, PR was on EPA's National Priorities List from September 8, 1983 until its deletion on October 16, 2000 (Hazard Ranking System score 31.24). EPA classes it as a manufacturing, processing or maintenance site. SEMS records one contaminant there: mercury. (EPA SEMS, October 28, 2026.)

Check this record at EPA: EPA's site profile

Deleted fromNPL status

1983listed

1contaminant recorded

3Records of Decision

What is the GE Wiring Devices Superfund site?

The GE Wiring Devices Site is located in the south central part of the Island in Juana Diaz, Puerto Rico. The source of contamination at the site is the waste-fill area where defective parts from silent mercury switches were discarded. These switches were assembled at the plant from 1957 until 1969. Each switch contained a hermetically sealed stainless steel button that encased a ceramic core, containing elemental mercury. Off-specification buttons were generally broken to reclaim the mercury. The steel button shells, with residual mercury and ceramic cores, were then discarded in the on-site waste-fill (pile) area where other defective switch parts and plastic scraps were also discarded. Based on test pit excavations, the waste-fill area is approximately 1 to 4 feet thick 110 feet wide and 440 feet long. As calculated in the Remedial Investigation, it is probable that roughly half a ton of mercury was discarded in the waste-fill area, based on mercury switch production and rejection documentation.

These passages are from EPA's own description of the site; the full text, the cleanup plan and the latest review are in EPA's site profile.

Source: EPA SEMS site description, report dated October 28, 2026.

What is the status of the GE Wiring Devices Superfund site?

The National Priorities List is EPA's list of the hazardous-waste sites that qualify for long-term federal cleanup. GE Wiring Devices scored 31.24 on the Hazard Ranking System, EPA's screening of the threat to people and the environment (sites scoring 28.50 or more can be listed). That is higher than 10% of the 1,725 final, proposed and deleted sites with a published score.

EPA recorded construction of the cleanup remedies at GE Wiring Devices as complete on June 20, 2000.

National Priorities List dates for GE Wiring Devices
StepDate
ProposedDecember 30, 1982
Listed (final)September 8, 1983
Construction completeJune 20, 2000
DeletedOctober 16, 2000

Source: EPA SEMS report "All Final, Proposed and Deleted NPL sites with NPL date, category and contaminants", October 28, 2026; EPA "Superfund National Priorities List (NPL) Sites with Status Information", October 2026 (dates and construction completion). Confirm in EPA's site profile.

What contaminants are at GE Wiring Devices?

SEMS lists 1 contaminant found at the site in soil, sediment, groundwater, surface water or air during its investigation. A listed contaminant was found at the site; the list does not say how much, where, or whether people are exposed.

  • mercury

Source: EPA SEMS contaminant records for PRD090282757, October 28, 2026.

What has EPA decided about cleaning up GE Wiring Devices?

EPA's document index holds 3 Records of Decision (the cleanup plans) and 0 five-year reviews for GE Wiring Devices.

Source: EPA Superfund site documents (SEMS public document index, HQ master collection), read November 11, 2026.

Which TRI facilities report releases near GE Wiring Devices?

TRI facilities within 10 miles of the site's coordinates, nearest first
FacilityMilesLatest yearReleases that year (lb)
Coopervision Manufacturing Puerto Rico LLC1.220249,946
Zimmer Manufacturing B.V.6.7202410
Ponce Can7.020240
Ecw Landfill Corp.7.72024575,000
Eaton Intelligent Power Ltd.9.7202413
Hamilton Sundstrand de Puerto Rico Inc.9.72024910

Distance is straight-line from EPA's site coordinates to each facility's reported coordinates. Being near is not evidence that a facility contributed to the site.

Source: EPA TRI basic data files 2019-2024 (facility coordinates); EPA SEMS site coordinates.

Sources: the EPA files behind this page
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov
  • EPA National Priorities List: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov