Mallard Bay Landing Bulk Plant

Deleted NPL Site
Verify at EPA Superfund →

Grand Cheniere, LA

According to the EPA Superfund Enterprise Management System, Mallard Bay Landing Bulk Plant in Grand Cheniere, LA is listed with NPL status Deleted NPL Site. Its Hazard Ranking System (HRS) score is 48.55. The public extract catalogs 6 contaminant records for this site. EPA marks construction of the cleanup remedy as complete. The site has been deleted from the NPL in the EPA record. NPL listing is a cleanup-authority designation, not a measured health-risk score.

View saved records

Superfund National Priorities List inclusion (status and HRS score shown above) is the EPA's formal designation that a contaminated site qualifies for long-term federal cleanup authority under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A federal-facility classification means the site is owned or operated by a federal agency, which routes cleanup responsibility differently than a privately owned site.

"Construction Complete" (status shown above) is an EPA milestone marking that the physical remedy work is finished, not that the site has exited EPA oversight; long-term monitoring can continue afterward. Deletion from the NPL is a separate, later step the EPA takes only once it determines every planned response action is finished.

NPL listing is a cleanup-authority designation in the EPA record, not a quantitative health-risk score. HRS scores of 28.50 or above qualify a site for the NPL under the EPA screening model (toxicity, pathways, waste quantity, and affected population factors). For current site conditions and official community notices, see the EPA Regional Superfund profile and the Louisiana environmental agency.

What is the cleanup status of this Superfund site?

NPL Status
Deleted NPL Site
Federal Facility
No
Construction Complete
Yes
HRS Score
48.55
Deleted from NPL
Yes

Contaminants

Contaminant Media
ARSENIC Groundwater
BENZENE Groundwater
BROMODICHLOROMETHANE Groundwater
CARBON TETRACHLORIDE Groundwater
CHLOROFORM Groundwater
MANGANESE Groundwater

Location

City
Grand Cheniere
Coordinates
29.9340, -92.6555

Other Superfund Sites in Louisiana

Site Name Status HRS Score
Agriculture Street Landfill NPL Site 50.00
American Creosote DeRidder NPL Site 50.00
American Creosote Works, Inc. (Winnfield Plant) NPL Site 50.70
Bayou Bonfouca NPL Site 29.78
Bayou Sorrel Deleted NPL Site 34.69
Capitol Lakes NPL Site 50.00
Central Wood Preserving Co. Deleted NPL Site 48.53
Cleve Reber Deleted NPL Site 48.80
Colonial Creosote NPL Site 50.00
Combustion, Inc. NPL Site 33.79

How does this site's HRS score compare in Louisiana?

Of the 29 Louisiana Superfund sites with a scored Hazard Ranking System (HRS) evaluation, Mallard Bay Landing Bulk Plant ranks #14 by score (48.55).

Either side of it: Southern Shipbuilding (50.00), Cleve Reber (48.80), Central Wood Preserving Co. (48.53), EVR-Wood Treating/Evangeline Refining Company (48.20)

Frequently Asked Questions

What is the Mallard Bay Landing Bulk Plant Superfund site?
Mallard Bay Landing Bulk Plant is a Superfund site located in Grand Cheniere, LA. It has a Hazard Ranking System (HRS) score of 48.55 (rank #14 of 29 scored Louisiana sites). Superfund sites are contaminated locations identified by the EPA for long-term cleanup under CERCLA.
What does NPL listing mean for Mallard Bay Landing Bulk Plant?
According to the EPA, National Priorities List (NPL) listing designates a site for long-term federal Superfund cleanup authority. It is a programmatic status in the Superfund Enterprise Management System, not a quantitative health-risk score for nearby residents. EPA records mark construction of the cleanup remedy as complete at this site. Site-specific conditions and community guidance are published by EPA Regional Superfund offices and the relevant state environmental agency.
What is the HRS score for Mallard Bay Landing Bulk Plant?
Mallard Bay Landing Bulk Plant's Hazard Ranking System (HRS) score is 48.55, placing it #14 of 29 Louisiana Superfund sites with a scored HRS evaluation. Sites with a score of 28.50 or greater qualify for the NPL; the model weighs contaminant toxicity, waste quantity, release likelihood, and affected population, and is not a community health diagnosis.
What contaminants are at the Mallard Bay Landing Bulk Plant site?
The EPA public Superfund extract catalogs 6 contaminants at Mallard Bay Landing Bulk Plant, documented through the remedial investigation process. Counts reflect listed records in that extract, not a complete inventory of every substance ever present.
What is the cleanup status of Mallard Bay Landing Bulk Plant?
Mallard Bay Landing Bulk Plant is currently Deleted NPL Site on the National Priorities List. Construction of the cleanup remedy has been completed. The site has been deleted from the NPL, indicating EPA has determined all response actions are complete. The EPA Superfund cleanup process includes phases from preliminary assessment through post-construction completion.

NPL listing is a cleanup-authority designation in the EPA record, not a quantitative health-risk score. See Superfund Sites Explained for how the National Priorities List, Hazard Ranking System, and cleanup phases work.

Related