PlainEnviro

Community water system · Alabama

Phil Campbell Water Works drinking water

Phil Campbell Water Works (AL0000606) is a community water system in Phil Campbell, AL serving 7,425 people from purchased surface water. In the 10 years to the 2026 third-quarter report, EPA records no health-based violation. Its latest lead 90th percentile (monitoring period beginning January 2023) was below the detection limit. UCMR 5 tests (2023-2025) found no PFAS above the reporting levels. (EPA SDWA data, October 14, 2026.)

Check this record at EPA: ECHO drinking water report for AL0000606

7,425people served

0health-based violations, 10 years

0violations still open

NDlead, 90th percentile: below detection (period from 2023)

0PFAS detected (UCMR 5)

Is the water from Phil Campbell Water Works safe to drink?

Phil Campbell Water Works had no health-based violation in the 10 years to October 2026: EPA records no time its water broke a limit or a required treatment step. Its full SDWIS record, older years included, holds 1 violation of every kind.

In Alabama, 16% of the 502 active community systems had a health-based violation in the same 10 years. By people served, Phil Campbell Water Works is the 169th largest community system in Alabama.

In its measured results, its latest lead 90th percentile (period beginning January 2023) was below the detection limit; EPA's UCMR 5 survey tested it for 30 substances and detected no PFAS. It draws on purchased surface water for 7,425 people.

This is Phil Campbell Water Works' compliance record, not a test of the water at your tap: what the records cannot tell you, and who can.

Source: EPA Safe Drinking Water Information System (SDWIS), federal data download, quarter 2026Q3, released October 14, 2026. Confirm in EPA ECHO drinking water search.

What violations does EPA record for Phil Campbell Water Works?

EPA records no violation of any kind for Phil Campbell Water Works since October 2016 (its record holds 1 older violation).

Source: SDWIS violations and enforcement, quarter 2026Q3; health-based means a maximum contaminant level, residual disinfectant level or treatment technique was not met.

How much lead and copper is in Phil Campbell Water Works' tap samples?

Lead, 90th percentile of tap samples (period beginning January 2023)0.0 mg/L Below detection

Over the action level (Phil Campbell Water Works' result is a 90th percentile: what that is), a system must treat the water to make it less corrosive, tell the public and replace lead lines. The Lead and Copper Rule Improvements (in effect since December 30, 2024) lower the lead action level to 0.010 mg/L from November 1, 2027.

Source: SDWIS lead and copper sample summaries (90th percentiles), quarter 2026Q3; Lead and Copper Rule Improvements: Federal Register, published October 30, 2024, effective December 30, 2024; 40 CFR 141.80(a)(4)(i) keeps 0.015 mg/L until November 1, 2027 and 141.80(c)(1) sets 0.010 mg/L from then (eCFR); both read November 11, 2026.

Did EPA find PFAS in Phil Campbell Water Works' water?

None of the 30 analytes tested was detected in any sample: 11Cl-PF3OUdS, 4:2 FTS, 6:2 FTS, 8:2 FTS, 9Cl-PF3ONS, ADONA, HFPO-DA, NEtFOSAA, NFDHA, NMeFOSAA, PFBA, PFBS, PFDA, PFDoA, PFEESA, PFHpA, PFHpS, PFHxA, PFHxS, PFMBA, PFMPA, PFNA, PFOA, PFOS, PFPeA, PFPeS, PFTA, PFTrDA, PFUnA, lithium.

UCMR 5 measured 29 PFAS and lithium in every community and non-transient non-community system serving 3,300 people or more (and a sample of 800 smaller ones) from 2023 to 2025. Its results show what was in the water; they are not compliance samples. The 2024 limits (PFOA and PFOS 4.0 ng/L; PFHxS, PFNA and HFPO-DA 10 ng/L) apply as running annual averages from 2029. In May 2026 EPA proposed keeping the PFOA and PFOS limits with an option to extend the date to 2031, and withdrawing the other three. PFAS results across the country

Source: EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5), final occurrence data released August 2026 (file dated October 15, 2026); 1 ng/L = 0.001 µg/L; 2024 PFAS limits: 40 CFR 141.61(c)(2) (eCFR); EPA proposals of May 2026: Federal Register documents 2026-10085 and 2026-10086 (May 20, 2026), no final rule; UCMR 5 results are survey, not compliance, data: UCMR 5 Data Summary (July 2026) and EPA's PFAS compliance quick reference guide (January 2025); all read November 11, 2026.

Who does Phil Campbell Water Works serve, and where does its water come from?

Phil Campbell Water Works is a community water system; EPA's inventory lists its owner type as local government, on EPA's inventory since 1980.

It reports serving Phil Campbell, in Franklin county.

1 other water system buys water from Phil Campbell Water Works: Franklin County Water Service Authority.

As a community system, Phil Campbell Water Works publishes an annual water quality report (Consumer Confidence Report) with its test results; how to find yours (EPA).

Source: SDWIS water system inventory and geographic areas served, quarter 2026Q3.

What other environmental records are in Franklin County?

The TRI facilities in Franklin County that reported the most toxic releases:

  1. Pilgrims Pride Russellville Processing Plant 49,441 pounds
  2. Tiffin Motorhomes Inc. 28,045 pounds
  3. Gates Corp 7,045 pounds
  4. Certainteed LLC 4,696 pounds
  5. M/J Feed Mill AL LLC 0 pounds

A facility or site in the same county is not evidence that it affects this system's water; source-water protection is assessed by the state.

Source: EPA Toxics Release Inventory 2024 and EPA SEMS National Priorities List, as of October 28, 2026.

Sources: the EPA files behind this page
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) occurrence data, final data, August 2026: www.epa.gov
  • EPA Lead and Copper Rule and Lead and Copper Rule Improvements: www.epa.gov
  • EPA PFAS National Primary Drinking Water Regulation (2024) and the May 2026 proposal: www.epa.gov
  • EPA: find your local Consumer Confidence Report: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov