PlainEnviro

Community water system · Alabama

Warrior River Water Authority drinking water

Warrior River Water Authority (AL0000763) is a community water system in Bessemer, AL serving 38,700 people from surface water. In the 10 years to the 2026 third-quarter report, EPA records 1 health-based violation and 4 monitoring, reporting or notice violations; 1 still open. Its latest lead 90th percentile (monitoring period beginning January 2024) was below the detection limit. In EPA's UCMR 5 tests (2023-2025) its highest PFOS result was 5.7 ng/L, above the 2024 limit of 4 ng/L (1 of 8 samples detected it); 1 other PFAS also had a result above its limit. UCMR 5 results come from EPA's national survey, not compliance samples, so a result above a limit level is not a violation; under the 2024 rule, compliance is judged from 2029 on running annual averages of compliance samples. (EPA SDWA data, October 14, 2026.)

Check this record at EPA: ECHO drinking water report for AL0000763

38,700people served

1health-based violation, 10 years

1violation still open

NDlead, 90th percentile: below detection (period from 2024)

5PFAS detected (UCMR 5)

Is the water from Warrior River Water Authority safe to drink?

Warrior River Water Authority had 1 health-based violation in the 10 years to October 2026: a contaminant over its maximum level. 1 violation is still open (not yet returned to compliance or resolved). Its full SDWIS record, older years included, holds 7 violations of every kind.

In Alabama, 16% of the 502 active community systems had a health-based violation in the same 10 years. By people served, Warrior River Water Authority is the 36th largest community system in Alabama.

In its measured results, its latest lead 90th percentile (period beginning January 2024) was below the detection limit; EPA's UCMR 5 survey tested it for 30 substances and found 2 PFAS above a 2024 limit level. It draws on surface water for 38,700 people.

This is Warrior River Water Authority's compliance record, not a test of the water at your tap: what the records cannot tell you, and who can.

Source: EPA Safe Drinking Water Information System (SDWIS), federal data download, quarter 2026Q3, released October 14, 2026. Confirm in EPA ECHO drinking water search.

What violations does EPA record for Warrior River Water Authority?

EPA records 5 violations for Warrior River Water Authority since October 2016: 2 other (public notice, consumer report), 1 over a maximum contaminant level, 1 monitoring and reporting, and 1 reporting.

Violations since October 2016, newest first
Contaminant or ruleKindCompliance periodResultLimitStatus
Public NoticeOther (public notice, consumer report)since April 2025Open
Public NoticeOther (public notice, consumer report)since October 2024Resolved
TTHMOver a maximum contaminant level (health-based)July 2024 to September 20240.081 MG/L0.080 mg/LResolved
2,4-DMonitoring and reportingJanuary 2024 to March 2024Resolved
Revised Total Coliform RuleReportingsince April 2020Resolved
Violations by year the compliance period began, Warrior River Water Authority (violations)
0001000310
Violations by year the compliance period began, Warrior River Water Authority
20170 violations
20180 violations
20190 violations
20201 violation
20210 violations
20220 violations
20230 violations
20243 violations
20251 violation
20260 violations

Source: SDWIS violations and enforcement, quarter 2026Q3; health-based means a maximum contaminant level, residual disinfectant level or treatment technique was not met.

How much lead and copper is in Warrior River Water Authority's tap samples?

Lead, 90th percentile of tap samples (period beginning January 2024)0.0 mg/L Below detection

Over the action level (Warrior River Water Authority's result is a 90th percentile: what that is), a system must treat the water to make it less corrosive, tell the public and replace lead lines. The Lead and Copper Rule Improvements (in effect since December 30, 2024) lower the lead action level to 0.010 mg/L from November 1, 2027.

Source: SDWIS lead and copper sample summaries (90th percentiles), quarter 2026Q3; Lead and Copper Rule Improvements: Federal Register, published October 30, 2024, effective December 30, 2024; 40 CFR 141.80(a)(4)(i) keeps 0.015 mg/L until November 1, 2027 and 141.80(c)(1) sets 0.010 mg/L from then (eCFR); both read November 11, 2026.

Did EPA find PFAS in Warrior River Water Authority's water?

PFOA, highest UCMR 5 result4.2 ng/L Above the 2024 limit
PFOS, highest UCMR 5 result5.7 ng/L Above the 2024 limit
UCMR 5 analytes detected at Warrior River Water Authority, 2023-2024
AnalyteHighest resultReporting level2024 limitUnitSamples detectedQualifier
lithium12.79noneµg/L4 of 8Detected
PFPeA63noneng/L2 of 8Detected
PFOS5.744ng/L1 of 8A result above the 2024 limit
PFHxA4.73noneng/L1 of 8Detected
PFOA4.244ng/L1 of 8A result above the 2024 limit
PFBS33noneng/L1 of 8Detected

Not detected in any sample (24 of the 30 analytes tested): 11Cl-PF3OUdS, 4:2 FTS, 6:2 FTS, 8:2 FTS, 9Cl-PF3ONS, ADONA, HFPO-DA, NEtFOSAA, NFDHA, NMeFOSAA, PFBA, PFDA, PFDoA, PFEESA, PFHpA, PFHpS, PFHxS, PFMBA, PFMPA, PFNA, PFPeS, PFTA, PFTrDA, PFUnA.

UCMR 5 measured 29 PFAS and lithium in every community and non-transient non-community system serving 3,300 people or more (and a sample of 800 smaller ones) from 2023 to 2025. Its results show what was in the water; they are not compliance samples. The 2024 limits (PFOA and PFOS 4.0 ng/L; PFHxS, PFNA and HFPO-DA 10 ng/L) apply as running annual averages from 2029. In May 2026 EPA proposed keeping the PFOA and PFOS limits with an option to extend the date to 2031, and withdrawing the other three. PFAS results across the country

Source: EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5), final occurrence data released August 2026 (file dated October 15, 2026); 1 ng/L = 0.001 µg/L; 2024 PFAS limits: 40 CFR 141.61(c)(2) (eCFR); EPA proposals of May 2026: Federal Register documents 2026-10085 and 2026-10086 (May 20, 2026), no final rule; UCMR 5 results are survey, not compliance, data: UCMR 5 Data Summary (July 2026) and EPA's PFAS compliance quick reference guide (January 2025); all read November 11, 2026.

Who does Warrior River Water Authority serve, and where does its water come from?

Warrior River Water Authority is a community water system; EPA's inventory lists its owner type as local government, on EPA's inventory since 1980.

It reports serving Bessemer, in Jefferson county.

1 other water system buys water from Warrior River Water Authority: Green Pond Water System.

As a community system, Warrior River Water Authority publishes an annual water quality report (Consumer Confidence Report) with its test results; how to find yours (EPA).

Source: SDWIS water system inventory and geographic areas served, quarter 2026Q3.

What other environmental records are in Jefferson County?

The TRI facilities in Jefferson County that reported the most toxic releases:

  1. US Pipe & Foundry Co LLC 1.2 million pounds
  2. American Cast Iron Pipe Co. 1.0 million pounds
  3. Miller Steam Plant 950,059 pounds
  4. Allworth LLC 132,511 pounds
  5. Nucor Steel Birmingham Inc 105,909 pounds

Superfund sites in Jefferson County: Interstate Lead Co. (ILCO) (on the National Priorities List); 35TH Avenue (proposed for the list).

A facility or site in the same county is not evidence that it affects this system's water; source-water protection is assessed by the state.

Source: EPA Toxics Release Inventory 2024 and EPA SEMS National Priorities List, as of October 28, 2026.

Sources: the EPA files behind this page
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) occurrence data, final data, August 2026: www.epa.gov
  • EPA Lead and Copper Rule and Lead and Copper Rule Improvements: www.epa.gov
  • EPA PFAS National Primary Drinking Water Regulation (2024) and the May 2026 proposal: www.epa.gov
  • EPA: find your local Consumer Confidence Report: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov