EPA TRI Facility · Nonmetallic Mineral Product
American Gypsum Wallboard Plant - Eagle
Gypsum, CO · Parent: Eagle Materials Inc
- Total releases
- 3 lbs
- Chemicals reported
- 1
- Carcinogens
- 1
- Primary pathway
- Air Releases
AIR Form-R mix
American Gypsum Wallboard Plant - Eagle: how the 3 lbs splits
3 lbs across all reported pathways
- Air Releases 3 lbs 100.0%
American Gypsum Wallboard Plant - Eagle's 3 lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Lead.
TRACE volume AIR pathway CARC-HEAVY
American Gypsum Wallboard Plant - Eagle is an EPA Toxics Release Inventory reporter in Gypsum, CO, in the nonmetallic mineral product sector. It reported 1 lbs of releases across 1 chemical in 2023, and 3 lbs in total across its 2019-2023 reporting years. That ranks 19,236 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Colorado's 277 reporting TRI sites, pounds #1 is not chemical-count #1. American Gypsum Wallboard Plant - Eagle is pounds #222 and chemical-count #263 at 3 lbs. Cripple Creek & Victor Gold Mining Co leads reported pounds (22.9M lbs) at 12 chemicals (chemical-count #13). Suncor Energy Commerce City Refinery leads chemical count at 33 chemicals (460.2K lbs, pounds #24). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Multi-Chem Group Rifle Co Facility; Peak Silverthorne Batch Plant; Climax Molybdenum Co-Climax Mine; Climax Molybdenum Co Henderson Mill. Similar-scale Nonmetallic Mineral Product peers outside Colorado: Separation Technologies LLC; Excalibar Minerals LLC; 429/430 Southlake; Certainteed Gypsum Nc Inc. Other Eagle Materials Inc sites in this extract: Fairborn Cement Co; Republic Paperboard Co.; Central Plains Cement Co - Sugar Creek Plant; Central Plains Cement Co. Largest disclosed chemicals by pounds: Lead.
American Gypsum Wallboard Plant - Eagle stamps TRACE volume with a dominant AIR pathway (100.0% air releases) across 1 chemical · 1 carcinogen-classified. Cumulative Form-R extract: 3 lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Separation Technologies LLC and Excalibar Minerals LLC.
American Gypsum Wallboard Plant - Eagle vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
3 lbs 26th percentile higher than 26% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
American Gypsum Wallboard Plant - Eagle inside Eagle's TRI pounds
Among the 3,265 Nonmetallic Mineral Product facilities in this database, American Gypsum Wallboard Plant - Eagle reports the 1,346th-largest volume (3 lbs). This one site accounts for 100% of every pound reported in Eagle. Scale peers outside Colorado include Separation Technologies LLC and Excalibar Minerals LLC.
County-dominant here means ≥25% of Eagle's reported pounds (3 lbs county total). Shares only print when the site reports ≥1,000 lbs.
American Gypsum Wallboard Plant - Eagle Form-R facts
Compare this facility
See how American Gypsum Wallboard Plant - Eagle stacks up against nearby facilities and the typical reporter.
100% less than the comparison
75% less than the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How American Gypsum Wallboard Plant - Eagle releases toxic chemicals into the environment. Total: 3 lbs.
Emissions Trend Summary
From 2019 to 2023, total releases increased by 16% (1 lbs to 1 lbs).
American Gypsum Wallboard Plant - Eagle: annual Form-R pounds
TRACE site · AIR pathway · TRI years 2019–2023
- 2019 0
- 2020 0
- 2021 0
- 2022 0
- 2023 0
What this shows American Gypsum Wallboard Plant - Eagle year-over-year reported totals (increased by 16% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Lead.
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 1 lbs | 1 |
| 2020 | 1 lbs | 1 |
| 2021 | 1 lbs | 1 |
| 2022 | 1 lbs | 1 |
| 2023 | 1 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2019–2023). 1 of 1 chemicals are carcinogens. Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Lead | 3 lbs | Carcinogen |
American Gypsum Wallboard Plant - Eagle · AIR-pathway site
Nearest TRI Facilities to American Gypsum Wallboard Plant - Eagle
Closest other reporters in Colorado - including Multi-Chem Group Rifle Co Facility, Peak Silverthorne Batch Plant, Climax Molybdenum Co-Climax Mine, ordered by distance.
Showing 8 of 276 other reporting facilities in Colorado.
Similar Nonmetallic Mineral Product Facilities
Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside Colorado - e.g. Separation Technologies LLC, Excalibar Minerals LLC, 429/430 Southlake.
Other Eagle Materials Inc Facilities
Same-parent TRI sites ranked by reported releases - including Fairborn Cement Co, Republic Paperboard Co., Central Plains Cement Co - Sugar Creek Plant.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Lead; nearby reporters include Multi-Chem Group Rifle Co Facility. American Gypsum Wallboard Plant - Eagle stamps TRACE volume · AIR pathway · CARC-HEAVY carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This American Gypsum Wallboard Plant - Eagle TRI extract (TRACE · AIR · CARC-HEAVY · lead Lead) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
American Gypsum Wallboard Plant - Eagle totals are self-reported EPCRA §313 estimates for Gypsum, CO, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 327420 · Nonmetallic Mineral Product. 100% of Eagle TRI pounds in this extract. Nearest ABS peer: Crane Electronics Inc (Δ 0 lbs). Pounds ≠ exposure.
American Gypsum Wallboard Plant - Eagle stamps TRACE volume · AIR pathway · CARC-HEAVY · lead Lead. PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov