EPA TRI Facility · Nonmetallic Mineral Product

Ready Mixed Concrete Plant 12

Aurora, CO · Parent: Brannan Sand & Gravel Co L L C

Total releases
0 lbs
Chemicals reported
2
Latest report
2023
Primary pathway
Air Releases
Verify at EPA TRI →

Ready Mixed Concrete Plant 12 has reported 0 lbs of toxic releases across 2 chemicals to the EPA Toxic Release Inventory, based on annual facility disclosures from 2019 through 2024. The facility operates in the Nonmetallic Mineral Product sector. The primary release pathway is air releases, accounting for 100% of total releases. All release data shown below is self-reported to the EPA under the Emergency Planning and Community Right-to-Know Act (EPCRA) Section 313.

#21,393 of 25,902 TRI facilities nationwide by total reported releases. Ranking reflects reported pounds, not toxicity or health risk.

Ready Mixed Concrete Plant 12 files annual Form R disclosures to the EPA Toxics Release Inventory under EPCRA Section 313, classified under NAICS 327320 (Nonmetallic Mineral Product). Across 5 years of records spanning 2019–2023, the site has disclosed 0 lbs in cumulative toxic releases across 2 distinct chemicals.

The dominant release pathway is air releases at 0 lbs (100.0% of total volume). The facility is operated under parent company Brannan Sand & Gravel Co L L C.

TRI Form R values are self-reported estimates, not measured stack emissions, and treat every pound of reported chemical equally regardless of toxicity. Inclusion in the TRI database does not establish a health risk to nearby residents; it documents the annual reporting record that Ready Mixed Concrete Plant 12 has filed with the EPA under federal community right-to-know requirements.

Quick Facts

Industry
Nonmetallic Mineral Product
NAICS Code
327320
Total Releases
0 lbs
Chemicals Reported
2
Latest Report Year
2023

Compare this facility

See how Ready Mixed Concrete Plant 12 stacks up against nearby facilities and the typical reporter.

Total reported releases
Ready Mixed Concrete Plant 12
0 lbs
Cripple Creek & Victor Gold Mining Co
22.9M lbs

100% less than the comparison

Chemicals reported
Ready Mixed Concrete Plant 12
2
Cripple Creek & Victor Gold Mining Co
12

83% less than the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How Ready Mixed Concrete Plant 12 releases toxic chemicals into the environment. Total: 0 lbs.

Air Releases 0 lbs (100.0%)
View 5-Year Emissions Trend →

Emissions Trend Summary

Reported total releases by year

Ready Mixed Concrete Plant 12 - annual TRI totals

million lbs

What this shows Year-over-year reported totals. TRI figures are self-reported estimates and can swing with production levels, waste-rock handling and reporting changes, not only with emissions controls.

Source EPA Toxics Release Inventory (TRI)
Year Total Chemicals
2019 0 lbs 1
2020 0 lbs 1
2021 0 lbs 1
2022 0 lbs 1
2023 0 lbs 2

Chemical Releases

Aggregated across all reporting years (2019–2023). Sorted by total release volume.

Chemical Total Flags
Lead And Lead Compounds 0 lbs -
Nitrate compounds (water dissociable; reportable only when in aqueous solution) 0 lbs -

Location

Coordinates
39.7545, -104.8099
ZIP Code
80011
EPA Facility ID
80011RDYMX1532E

About TRI Data

Data as of 2024 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

Data comes from the EPA Toxic Release Inventory (TRI) program. Facilities that manufacture, process, or otherwise use listed toxic chemicals above threshold amounts are required to report annually to the EPA.

Release quantities are self-reported by the facility and may represent estimates rather than exact measurements. "Total releases" includes releases to air, water, land, and off-site transfers for disposal. Quantities shown here are aggregated across all available reporting years.

PlainEnviro presents this data without advocacy framing. The presence of a facility in the TRI database does not by itself indicate a health risk. For site-specific health questions, consult your local environmental or health agency.

Frequently Asked Questions

What chemicals does Ready Mixed Concrete Plant 12 release?
Ready Mixed Concrete Plant 12 has reported releases of 2 chemicals to the EPA Toxic Release Inventory, totaling 0 lbs.
What industry is Ready Mixed Concrete Plant 12 in?
Ready Mixed Concrete Plant 12 is classified under the "Nonmetallic Mineral Product" industry (NAICS code 327320), located in Aurora, CO.
How long has Ready Mixed Concrete Plant 12 reported to the TRI?
Ready Mixed Concrete Plant 12 has EPA Toxic Release Inventory data spanning 5 years, from 2019 to 2023.
How does Ready Mixed Concrete Plant 12 release toxic chemicals?
The primary release pathway for Ready Mixed Concrete Plant 12 is air releases, accounting for 100.0% of total releases (0 lbs).
Is Ready Mixed Concrete Plant 12 a health risk?
The presence of a facility in the TRI database does not by itself indicate a health risk. Release quantities are self-reported estimates. For site-specific health questions, consult your local environmental or health agency.

Related

Sources & how this page was built

Every figure on this page traces to public, federal-government data on Ready Mixed Concrete Plant 12. The records below are the primary sources; our methodology explains how they are joined, computed, and verified.

Retrieved and formatted by PlainEnviro Editorial. TRI release totals are self-reported estimates, not measured stack emissions.