EPA TRI Facility · Electric Utilities
Edward L Addison Generating Plant
Thomaston, GA · Parent: Southern Co
- Total releases
- 0 lbs
- Chemicals reported
- 1
- Carcinogens
- 1
- Primary pathway
- -
TRACE volume NONE pathway CLEAN
Edward L Addison Generating Plant is an EPA Toxics Release Inventory reporter in Thomaston, GA, in the electric utilities sector. That ranks 21,547 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Interfor - Thomaston Div; Quad/graphics Inc.; Tencate Finishing (southern Mills); Continental Tire the Americas Llc/aldora Plant. Similar-scale Electric Utilities peers outside Georgia: Bureau of Reclamation Davis Dam; Parker Dam - Bureau of Reclamation; Devon Power Holdings LLC; Zion Energy Center. Other Southern Co sites in this extract: Miller Steam Plant; Barry Steam Plant; Bowen Steam Electric Generating Plant; McDonough/atkinson Steam Electric Generating Plant. Largest disclosed chemicals by pounds: Naphthalene.
Edward L Addison Generating Plant is a TRACE-volume Form-R filer in Thomaston, GA (Electric Utilities): disclosures on file without reported release pounds through 2023. Silence on pounds is not a clearance finding. All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Bureau of Reclamation Davis Dam and Parker Dam - Bureau of Reclamation.
Edward L Addison Generating Plant vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
0 lbs 0th percentile higher than 0% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Edward L Addison Generating Plant: zero-pound Form-R filing
According to the EPA Toxics Release Inventory, Edward L Addison Generating Plant filed Form R disclosures without reporting any release volume, one of 513 Electric Utilities facilities in this database. A zero total means nothing was reported under EPCRA Section 313, not that the site was assessed and found clean. Scale peers outside Georgia include Bureau of Reclamation Davis Dam and Parker Dam - Bureau of Reclamation.
Zero-pound filings still appear in the TRI extract; they are not a clearance finding. Compare Interfor - Thomaston Div before treating silence as clean.
Edward L Addison Generating Plant Form-R facts
Compare this facility
See how Edward L Addison Generating Plant stacks up against nearby facilities and the typical reporter.
100% less than the comparison
67% less than the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
Emissions Trend Summary
Edward L Addison Generating Plant: annual Form-R pounds
TRACE site · NONE pathway · TRI years 2021–2023
- 2021 0
- 2022 0
- 2023 0
What this shows Edward L Addison Generating Plant year-over-year reported totals. TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Naphthalene.
| Year | Total | Chemicals |
|---|---|---|
| 2021 | 0 lbs | 1 |
| 2022 | 0 lbs | 1 |
| 2023 | 0 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2021–2023). 1 of 1 chemicals are carcinogens. Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Naphthalene | 0 lbs | Carcinogen |
Edward L Addison Generating Plant in Upson
Nearest TRI Facilities to Edward L Addison Generating Plant
Closest other reporters in Georgia - including Interfor - Thomaston Div, Quad/graphics Inc., Tencate Finishing (southern Mills), ordered by distance.
Showing 8 of 705 other reporting facilities in Georgia.
Similar Electric Utilities Facilities
Other Electric Utilities facilities with similar total release volumes (±80%), outside Georgia - e.g. Bureau of Reclamation Davis Dam, Parker Dam - Bureau of Reclamation, Devon Power Holdings LLC.
Other Southern Co Facilities
Same-parent TRI sites ranked by reported releases - including Miller Steam Plant, Barry Steam Plant, Bowen Steam Electric Generating Plant.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Naphthalene; nearby reporters include Interfor - Thomaston Div. Edward L Addison Generating Plant stamps TRACE volume · NONE pathway · CLEAN carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Edward L Addison Generating Plant TRI extract (TRACE · NONE · CLEAN · lead Naphthalene) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Edward L Addison Generating Plant totals are self-reported EPCRA §313 estimates for Thomaston, GA, latest year 2023. Form-R rows span 2021–2023 (3 years). NAICS 221112 · Electric Utilities. Pounds ≠ exposure.
Edward L Addison Generating Plant is a TRACE Form-R filer with no reported pounds in this extract. PlainEnviro renders the EPA row as filed - zero pounds is not a clearance finding. Corrections route through the editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov