EPA TRI Facility · Nonmetallic Mineral Product

Jefferson County Ready Mix Concrete Plant 23

Perry, KS · Parent: Midwest Concrete Materials

Total releases
35 lbs
Chemicals reported
2
Carcinogens
1
Primary pathway
Air Releases

AIR Form-R mix

Jefferson County Ready Mix Concrete Plant 23: how the 35 lbs splits

35 lbs across all reported pathways

  • Air Releases 35 lbs 100.0%

Jefferson County Ready Mix Concrete Plant 23's 35 lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Lead.

TRACE volume AIR pathway CARC-HEAVY

Jefferson County Ready Mix Concrete Plant 23 is an EPA Toxics Release Inventory reporter in Perry, KS, in the nonmetallic mineral product sector. It reported 12 lbs of releases across 1 chemical in 2022, and 35 lbs in total across its 2019-2022 reporting years. That ranks 17,537 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Kansas's 317 reporting TRI sites, pounds #1 is not chemical-count #1. Jefferson County Ready Mix Concrete Plant 23 is pounds #256 and chemical-count #221 at 35 lbs. Ecovyst Catalyst Technologies LLC leads reported pounds (19.3M lbs) at 9 chemicals (chemical-count #32). Ash Grove Cement Co leads chemical count at 45 chemicals (929.5K lbs, pounds #26). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Forterra Concrete Products - Oskaloosa; Lawrence Energy Center; Schlumberger Technology Corp Lawrence Technology Center; Post Consumer Brands. Similar-scale Nonmetallic Mineral Product peers outside Kansas: S&w Wilmington Plant; Pennsy Supply Inc Paxton St Ready Mix; Dauphinais Concrete Inc.; Joy-Mark Inc. Other Midwest Concrete Materials sites in this extract: Plant #6; Plant #5; Plant #1; Midwest Concrete Materials - Salina. Largest disclosed chemicals by pounds: Lead; Nitrate compounds (water dissociable; reportable only when in aqueous solution).

View saved records
Verify at EPA TRI →

Jefferson County Ready Mix Concrete Plant 23 stamps TRACE volume with a dominant AIR pathway (100.0% air releases) across 2 chemicals · 1 carcinogen-classified. Cumulative Form-R extract: 35 lbs (2019–2022). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include S&w Wilmington Plant and Pennsy Supply Inc Paxton St Ready Mix.

#17,537 of 25,986 TRI facilities nationwide by total reported releases. Ranking reflects reported pounds, not toxicity or health risk.

Jefferson County Ready Mix Concrete Plant 23 vs. every reporting TRI facility

Cumulative reported release pounds, with this facility marked in the national distribution

35 lbs 33rd percentile higher than 33% of 25,986 reporting TRI facilities

This facility 0 lbs 20M+ lbs every reporting TRI facility, bucketed by value

Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.

Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year

Jefferson County Ready Mix Concrete Plant 23 inside Jefferson's TRI pounds

Among the 3,265 Nonmetallic Mineral Product facilities in this database, Jefferson County Ready Mix Concrete Plant 23 reports the 1,016th-largest volume (35 lbs). This one site accounts for 99.7% of every pound reported in Jefferson. Scale peers outside Kansas include S&w Wilmington Plant and Pennsy Supply Inc Paxton St Ready Mix.

County-dominant here means ≥25% of Jefferson's reported pounds (35 lbs county total). Shares only print when the site reports ≥1,000 lbs.

Jefferson County Ready Mix Concrete Plant 23 Form-R facts

Sector
Nonmetallic Mineral Product
TRACE volume
35 lbs
AIR pathway
Air Releases
CARC-HEAVY chem count
2 · 1 carc.
Lead chemical
Lead

Compare this facility

See how Jefferson County Ready Mix Concrete Plant 23 stacks up against nearby facilities and the typical reporter.

Total reported releases
Jefferson County Ready Mix Concrete Plant 23
35 lbs
Forterra Concrete Products - Oskaloosa
0 lbs

323.5× more than the comparison

Chemicals reported
Jefferson County Ready Mix Concrete Plant 23
2
Forterra Concrete Products - Oskaloosa
1

2.0× more than the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How Jefferson County Ready Mix Concrete Plant 23 releases toxic chemicals into the environment. Total: 35 lbs.

Air Releases 35 lbs (100.0%)
View 4-Year Emissions Trend →

Emissions Trend Summary

From 2019 to 2022, total releases increased by 97% (6 lbs to 12 lbs).

Jefferson County Ready Mix Concrete Plant 23: annual Form-R pounds

TRACE site · AIR pathway · TRI years 2019–2022

million lbs

What this shows Jefferson County Ready Mix Concrete Plant 23 year-over-year reported totals (increased by 97% from 2019 to 2022). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Lead.

Source EPA Toxics Release Inventory (TRI)
Year Total Chemicals
2019 6 lbs 2
2020 7 lbs 1
2021 10 lbs 1
2022 12 lbs 1

Chemical Releases

Aggregated across all reporting years (2019–2022). 1 of 2 chemicals are carcinogens. Sorted by total release volume.

Chemical Total Flags
Lead 35 lbs Carcinogen
Nitrate compounds (water dissociable; reportable only when in aqueous solution) 0 lbs -

Jefferson County Ready Mix Concrete Plant 23 · AIR-pathway site

Perry, KS
39.0523, -95.3853
County TRI context
Jefferson · 99.7% of county pounds
Parent company
Midwest Concrete Materials

About TRI Data

Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

On this page the largest disclosed chemicals include Lead, Nitrate compounds (water dissociable; reportable only when in aqueous solution); nearby reporters include Forterra Concrete Products - Oskaloosa. Jefferson County Ready Mix Concrete Plant 23 stamps TRACE volume · AIR pathway · CARC-HEAVY carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.

Use and verify this record

This Jefferson County Ready Mix Concrete Plant 23 TRI extract (TRACE · AIR · CARC-HEAVY · lead Lead) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.

Jefferson County Ready Mix Concrete Plant 23 totals are self-reported EPCRA §313 estimates for Perry, KS, latest year 2022. Form-R rows span 2019–2022 (4 years). NAICS 327320 · Nonmetallic Mineral Product. 99.7% of Jefferson TRI pounds in this extract. Nearest ABS peer: Fabricated Products Inc DBA Seafab Metals Co (Δ 0 lbs). Pounds ≠ exposure.

Jefferson County Ready Mix Concrete Plant 23 stamps TRACE volume · AIR pathway · CARC-HEAVY · lead Lead. PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.

All federal data sources used on this page
  • EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
  • EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
  • EPA Facility Registry Service - facility location and identity. epa.gov
  • EPA ECHO - regulatory and compliance context. epa.gov
  • EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov