EPA TRI Facility · Nonmetallic Mineral Product
Argos Ready Mix Scotts Hill Concrete Plant
Wilmington, NC · Parent: Argos USA Corp
- Total releases
- 1 lbs
- Chemicals reported
- 1
- Carcinogens
- 1
- Primary pathway
- Air Releases
AIR Form-R mix
Argos Ready Mix Scotts Hill Concrete Plant: how the 1 lbs splits
1 lbs across all reported pathways
- Air Releases 1 lbs 100.0%
Argos Ready Mix Scotts Hill Concrete Plant's 1 lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Lead.
TRACE volume AIR pathway CARC-HEAVY
Argos Ready Mix Scotts Hill Concrete Plant is an EPA Toxics Release Inventory reporter in Wilmington, NC, in the nonmetallic mineral product sector. It reported 0 lbs of releases across 1 chemical in 2021, and 1 lbs in total across its 2019-2021 reporting years. That ranks 20,118 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In North Carolina's 787 reporting TRI sites, pounds #1 is not chemical-count #1. Argos Ready Mix Scotts Hill Concrete Plant is pounds #680 and chemical-count #694 at 1 lbs. Befesa Zinc Metal LLC leads reported pounds (43.1M lbs) at 4 chemicals (chemical-count #158). Pcs Phosphate Co Inc leads chemical count at 29 chemicals (22.9M lbs, pounds #2). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Senneca Holdings (hmf Express); Adams an Oldcastle Co - Castle Hayne; S&w Castle Hayne Plant; American Chrome & Chemicals. Similar-scale Nonmetallic Mineral Product peers outside North Carolina: Argos Yulee Concrete Plant; Cape Cod Ready Mix; Ozinga Ready-Mix Concrete - Gary; Forterra Pipe & Precast LLC - Macedonia. Other Argos USA Corp sites in this extract: Argos Cement LLC - Roberta Plant; Argos Ocala Concrete Plant; Sarasota Ready Mix Plant; Argos Bunnell Ready Mix Plant. Largest disclosed chemicals by pounds: Lead.
Argos Ready Mix Scotts Hill Concrete Plant stamps TRACE volume with a dominant AIR pathway (100.0% air releases) across 1 chemical · 1 carcinogen-classified. Cumulative Form-R extract: 1 lbs (2019–2021). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Argos Yulee Concrete Plant and Cape Cod Ready Mix.
Argos Ready Mix Scotts Hill Concrete Plant vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
1 lbs 23rd percentile higher than 23% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Argos Ready Mix Scotts Hill Concrete Plant in the Nonmetallic Mineral Product sector extract
Among the 3,265 Nonmetallic Mineral Product facilities in this database, Argos Ready Mix Scotts Hill Concrete Plant reports the 1,751st-largest volume (1 lbs). Scale peers outside North Carolina include Argos Yulee Concrete Plant and Cape Cod Ready Mix.
Sector rank uses reported TRI pounds only. Share callouts need ≥1,000 lbs so tiny totals cannot mint a false signal.
Argos Ready Mix Scotts Hill Concrete Plant Form-R facts
Compare this facility
See how Argos Ready Mix Scotts Hill Concrete Plant stacks up against nearby facilities and the typical reporter.
100% less than the comparison
80% less than the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How Argos Ready Mix Scotts Hill Concrete Plant releases toxic chemicals into the environment. Total: 1 lbs.
Emissions Trend Summary
From 2019 to 2021, total releases decreased by 32% (0 lbs to 0 lbs).
Argos Ready Mix Scotts Hill Concrete Plant: annual Form-R pounds
TRACE site · AIR pathway · TRI years 2019–2021
- 2019 0
- 2020 0
- 2021 0
What this shows Argos Ready Mix Scotts Hill Concrete Plant year-over-year reported totals (decreased by 32% from 2019 to 2021). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Lead.
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 0 lbs | 1 |
| 2020 | 0 lbs | 1 |
| 2021 | 0 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2019–2021). 1 of 1 chemicals are carcinogens. Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Lead | 1 lbs | Carcinogen |
Argos Ready Mix Scotts Hill Concrete Plant · AIR-pathway site
Nearest TRI Facilities to Argos Ready Mix Scotts Hill Concrete Plant
Closest other reporters in North Carolina - including Senneca Holdings (hmf Express), Adams an Oldcastle Co - Castle Hayne, S&w Castle Hayne Plant, ordered by distance.
Showing 8 of 786 other reporting facilities in North Carolina.
Similar Nonmetallic Mineral Product Facilities
Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside North Carolina - e.g. Argos Yulee Concrete Plant, Cape Cod Ready Mix, Ozinga Ready-Mix Concrete - Gary.
Other Argos USA Corp Facilities
Same-parent TRI sites ranked by reported releases - including Argos Cement LLC - Roberta Plant, Argos Ocala Concrete Plant, Sarasota Ready Mix Plant.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Lead; nearby reporters include Senneca Holdings (hmf Express). Argos Ready Mix Scotts Hill Concrete Plant stamps TRACE volume · AIR pathway · CARC-HEAVY carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Argos Ready Mix Scotts Hill Concrete Plant TRI extract (TRACE · AIR · CARC-HEAVY · lead Lead) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Argos Ready Mix Scotts Hill Concrete Plant totals are self-reported EPCRA §313 estimates for Wilmington, NC, latest year 2021. Form-R rows span 2019–2021 (3 years). NAICS 327320 · Nonmetallic Mineral Product. 0.0% of New Hanover TRI pounds in this extract. Nearest ABS peer: Argos Yulee Concrete Plant (Δ 0 lbs). Pounds ≠ exposure.
Argos Ready Mix Scotts Hill Concrete Plant stamps TRACE volume · AIR pathway · CARC-HEAVY · lead Lead. PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov