EPA TRI Facility · Nonmetallic Mineral Product
Argos Bunnell Ready Mix Plant
Bunnell, FL · Parent: Argos USA Corp
- Total releases
- 2 lbs
- Chemicals reported
- 1
- Carcinogens
- 1
- Primary pathway
- Air Releases
AIR Form-R mix
Argos Bunnell Ready Mix Plant: how the 2 lbs splits
2 lbs across all reported pathways
- Air Releases 2 lbs 100.0%
Argos Bunnell Ready Mix Plant's 2 lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Lead.
TRACE volume AIR pathway CARC-HEAVY
Argos Bunnell Ready Mix Plant is an EPA Toxics Release Inventory reporter in Bunnell, FL, in the nonmetallic mineral product sector. It reported 0 lbs of releases across 1 chemical in 2023, and 2 lbs in total across its 2019-2023 reporting years. That ranks 19,373 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Florida's 659 reporting TRI sites, pounds #1 is not chemical-count #1. Argos Bunnell Ready Mix Plant is pounds #447 and chemical-count #476 at 2 lbs. Ascend Performance Materials Operations LLC leads reported pounds (116.3M lbs) at 27 chemicals (chemical-count #2). Duke Energy Florida Llc-Crystal River Power Plant leads chemical count at 31 chemicals (2.4M lbs, pounds #15). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Titan Florida LLC - Bunnell Ready Mix Plant; Alleima LLC; Boston Whaler Flagler Facility; Microflex Inc.. Similar-scale Nonmetallic Mineral Product peers outside Florida: Concrete Supply Co - Kings Moutain; Concrete Supply Co. LLC - Kannapolis; Smyrna Ready Mix Concrete LLC - del Camino Ready Mix; Tresca Brothers Sand & Gravel. Other Argos USA Corp sites in this extract: Argos Cement LLC - Roberta Plant; Argos Ocala Concrete Plant; Sarasota Ready Mix Plant; Gainesville Ready Mix Plant. Largest disclosed chemicals by pounds: Lead.
Argos Bunnell Ready Mix Plant stamps TRACE volume with a dominant AIR pathway (100.0% air releases) across 1 chemical · 1 carcinogen-classified. Cumulative Form-R extract: 2 lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Concrete Supply Co - Kings Moutain and Concrete Supply Co. LLC - Kannapolis.
Argos Bunnell Ready Mix Plant vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
2 lbs 25th percentile higher than 25% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Argos Bunnell Ready Mix Plant in the Nonmetallic Mineral Product sector extract
Among the 3,265 Nonmetallic Mineral Product facilities in this database, Argos Bunnell Ready Mix Plant reports the 1,394th-largest volume (2 lbs). Scale peers outside Florida include Concrete Supply Co - Kings Moutain and Concrete Supply Co. LLC - Kannapolis.
Sector rank uses reported TRI pounds only. Share callouts need ≥1,000 lbs so tiny totals cannot mint a false signal.
Argos Bunnell Ready Mix Plant Form-R facts
Compare this facility
See how Argos Bunnell Ready Mix Plant stacks up against nearby facilities and the typical reporter.
8.6× more than the comparison
About the same as the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How Argos Bunnell Ready Mix Plant releases toxic chemicals into the environment. Total: 2 lbs.
Emissions Trend Summary
From 2019 to 2023, total releases increased by 19% (0 lbs to 0 lbs).
Argos Bunnell Ready Mix Plant: annual Form-R pounds
TRACE site · AIR pathway · TRI years 2019–2023
- 2019 0
- 2020 0
- 2021 0
- 2022 0
- 2023 0
What this shows Argos Bunnell Ready Mix Plant year-over-year reported totals (increased by 19% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Lead.
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 0 lbs | 1 |
| 2020 | 0 lbs | 1 |
| 2021 | 0 lbs | 1 |
| 2022 | 1 lbs | 1 |
| 2023 | 0 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2019–2023). 1 of 1 chemicals are carcinogens. Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Lead | 2 lbs | Carcinogen |
Argos Bunnell Ready Mix Plant · AIR-pathway site
Nearest TRI Facilities to Argos Bunnell Ready Mix Plant
Closest other reporters in Florida - including Titan Florida LLC - Bunnell Ready Mix Plant, Alleima LLC, Boston Whaler Flagler Facility, ordered by distance.
Showing 8 of 658 other reporting facilities in Florida.
Similar Nonmetallic Mineral Product Facilities
Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside Florida - e.g. Concrete Supply Co - Kings Moutain, Concrete Supply Co. LLC - Kannapolis, Smyrna Ready Mix Concrete LLC - del Camino Ready Mix.
Other Argos USA Corp Facilities
Same-parent TRI sites ranked by reported releases - including Argos Cement LLC - Roberta Plant, Argos Ocala Concrete Plant, Sarasota Ready Mix Plant.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Lead; nearby reporters include Titan Florida LLC - Bunnell Ready Mix Plant. Argos Bunnell Ready Mix Plant stamps TRACE volume · AIR pathway · CARC-HEAVY carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Argos Bunnell Ready Mix Plant TRI extract (TRACE · AIR · CARC-HEAVY · lead Lead) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Argos Bunnell Ready Mix Plant totals are self-reported EPCRA §313 estimates for Bunnell, FL, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 327320 · Nonmetallic Mineral Product. 0.0% of Flagler TRI pounds in this extract. Nearest ABS peer: Indium Corp of America (Δ 0 lbs). Pounds ≠ exposure.
Argos Bunnell Ready Mix Plant stamps TRACE volume · AIR pathway · CARC-HEAVY · lead Lead. PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov