EPA TRI Facility · Nonmetallic Mineral Product

Concrete Supply Co LLC - Egger

Linwood, NC · Parent: Concrete Supply Co LLC

Total releases
3 lbs
Chemicals reported
3
Latest report
2019
Primary pathway
Water Discharges

WATER Form-R mix

Concrete Supply Co LLC - Egger: how the 3 lbs splits

3 lbs across all reported pathways

  • Water Discharges 3 lbs 99.8%
  • Air Releases 0 lbs 0.2%

Concrete Supply Co LLC - Egger's 3 lbs Form-R total is WATER - water discharges is 99.8% of the bar. Next segment: air releases at 0.2%. Leading chemical by pounds: Nitrate compounds (water dissociable; reportable only when in aqueous solution).

TRACE volume WATER pathway CLEAN

Concrete Supply Co LLC - Egger is an EPA Toxics Release Inventory reporter in Linwood, NC, in the nonmetallic mineral product sector. It reported 3 lbs of releases across 3 chemicals in 2019. That ranks 19,288 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In North Carolina's 787 reporting TRI sites, pounds #1 is not chemical-count #1. Concrete Supply Co LLC - Egger is pounds #636 and chemical-count #360 at 3 lbs. Befesa Zinc Metal LLC leads reported pounds (43.1M lbs) at 4 chemicals (chemical-count #158). Pcs Phosphate Co Inc leads chemical count at 29 chemicals (22.9M lbs, pounds #2). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Egger - Lexington Particleboard Plant; Electric Glass Fiber America LLC; Innospec Active Chemicals; Westlake Royal Building Products Inc - Plant 1. Similar-scale Nonmetallic Mineral Product peers outside North Carolina: Cemstone - East Bethel; Forterra Pipe & Precast LLC - Columbus; Custom Crete - Creekview; Quikrete - Miami Fl Plant. Other Concrete Supply Co LLC sites in this extract: Dawkins On-Site Robstown CBP1; Carolina Ready Mix & Builders Supply LLC - Swannanoa; Concrete Supply Co. LLC - Spartanburg; Concrete Supply Co North Plant. Largest disclosed chemicals by pounds: Nitrate compounds (water dissociable; reportable only when in aqueous solution); Lead And Lead Compounds; Mercury And Mercury Compounds.

View saved records
Verify at EPA TRI →

Concrete Supply Co LLC - Egger stamps TRACE volume with a dominant WATER pathway (99.8% water discharges) across 3 chemicals. Cumulative Form-R extract: 3 lbs (2019–2019). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Cemstone - East Bethel and Forterra Pipe & Precast LLC - Columbus.

#19,288 of 25,986 TRI facilities nationwide by total reported releases. Ranking reflects reported pounds, not toxicity or health risk.

Concrete Supply Co LLC - Egger vs. every reporting TRI facility

Cumulative reported release pounds, with this facility marked in the national distribution

3 lbs 26th percentile higher than 26% of 25,986 reporting TRI facilities

This facility 0 lbs 20M+ lbs every reporting TRI facility, bucketed by value

Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.

Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year

Concrete Supply Co LLC - Egger in the Nonmetallic Mineral Product sector extract

Among the 3,265 Nonmetallic Mineral Product facilities in this database, Concrete Supply Co LLC - Egger reports the 1,358th-largest volume (3 lbs). Scale peers outside North Carolina include Cemstone - East Bethel and Forterra Pipe & Precast LLC - Columbus.

Sector rank uses reported TRI pounds only. Share callouts need ≥1,000 lbs so tiny totals cannot mint a false signal.

Concrete Supply Co LLC - Egger Form-R facts

Sector
Nonmetallic Mineral Product
TRACE volume
3 lbs
WATER pathway
Water Discharges
CLEAN chem count
3
Lead chemical
Nitrate compounds (water dissociable; reportable only when in aqueous solution)

Compare this facility

See how Concrete Supply Co LLC - Egger stacks up against nearby facilities and the typical reporter.

Total reported releases
Concrete Supply Co LLC - Egger
3 lbs
Egger - Lexington Particleboard Plant
365.6K lbs

100% less than the comparison

Chemicals reported
Concrete Supply Co LLC - Egger
3
Egger - Lexington Particleboard Plant
7

57% less than the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How Concrete Supply Co LLC - Egger releases toxic chemicals into the environment. Total: 3 lbs.

Water Discharges 3 lbs (99.8%)
Air Releases 0 lbs (0.2%)

Chemical Releases

Aggregated across all reporting years (2019–2019). Sorted by total release volume.

Chemical Total Flags
Nitrate compounds (water dissociable; reportable only when in aqueous solution) 3 lbs -
Lead And Lead Compounds 0 lbs -
Mercury And Mercury Compounds 0 lbs -

Concrete Supply Co LLC - Egger · WATER-pathway site

Linwood, NC
35.7469, -80.3448
County TRI context
Davidson · 0.0% of county pounds
Parent company
Concrete Supply Co LLC

Similar Nonmetallic Mineral Product Facilities

Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside North Carolina - e.g. Cemstone - East Bethel, Forterra Pipe & Precast LLC - Columbus, Custom Crete - Creekview.

About TRI Data

Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

On this page the largest disclosed chemicals include Nitrate compounds (water dissociable; reportable only when in aqueous solution), Lead And Lead Compounds, Mercury And Mercury Compounds; nearby reporters include Egger - Lexington Particleboard Plant. Concrete Supply Co LLC - Egger stamps TRACE volume · WATER pathway · CLEAN carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.

Use and verify this record

This Concrete Supply Co LLC - Egger TRI extract (TRACE · WATER · CLEAN · lead Nitrate compounds (water dissociable; reportable only when in aqueous solution)) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.

Concrete Supply Co LLC - Egger totals are self-reported EPCRA §313 estimates for Linwood, NC, latest year 2019. NAICS 327320 · Nonmetallic Mineral Product. 0.0% of Davidson TRI pounds in this extract. Nearest ABS peer: Cemstone - East Bethel (Δ 0 lbs). Pounds ≠ exposure.

Concrete Supply Co LLC - Egger stamps TRACE volume · WATER pathway · CLEAN · lead Nitrate compounds (water dissociable; reportable only when in aqueous solution). PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.

All federal data sources used on this page
  • EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
  • EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
  • EPA Facility Registry Service - facility location and identity. epa.gov
  • EPA ECHO - regulatory and compliance context. epa.gov
  • EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov