EPA TRI Facility · Nonmetallic Mineral Product
Fort Hood Ready Mix
Fort Hood, TX · Parent: Martin Marietta Materials Inc
- Total releases
- 0 lbs
- Chemicals reported
- 1
- Latest report
- 2020
- Primary pathway
- Water Discharges
MIXED Form-R mix
Fort Hood Ready Mix: how the 0 lbs splits
0 lbs across all reported pathways
- Water Discharges 0 lbs 63.3%
- Air Releases 0 lbs 36.7%
Fort Hood Ready Mix's 0 lbs Form-R total is MIXED - water discharges is 63.3% of the bar. Next segment: air releases at 36.7%. Leading chemical by pounds: Lead And Lead Compounds.
TRACE volume MIXED pathway CLEAN
Fort Hood Ready Mix is an EPA Toxics Release Inventory reporter in Fort Hood, TX, in the nonmetallic mineral product sector. It reported 0 lbs of releases across 1 chemical in 2020, and 0 lbs in total across its 2019-2020 reporting years. That ranks 20,991 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Texas's 2,016 reporting TRI sites, pounds #1 is not chemical-count #1. Fort Hood Ready Mix is pounds #1931 and chemical-count #1966 at 0 lbs. Ascend Performance Materials-Chocolate Bayou Plant leads reported pounds (94.0M lbs) at 36 chemicals (chemical-count #35). Veolia Es Technical Solutions LLC Port Arthur Facility leads chemical count at 246 chemicals (1.5M lbs, pounds #112). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: US Army Fort Cavazos Range Facility; Transit Mix Killeen Plant Plant #1151; Mgc Pure Chemicals America Inc; Killeen Marble Inc. Similar-scale Nonmetallic Mineral Product peers outside Texas: Ozinga Ready-Mix Streamwood Plant; Shamrock Concrete Co Papillion Plant; Rinker Wilson Pipe; Brannan Ready Mix - South Ready Mix. Other Martin Marietta Materials Inc sites in this extract: Martin Marietta North Texas Cement LLC; Martin Marietta Magnesia Specialties Woodville; Mission Valley Rock; Martin Marietta Arizona LLC - River Ranch Plant. Largest disclosed chemicals by pounds: Lead And Lead Compounds.
Fort Hood Ready Mix is a TRACE · MIXED-pathway Form-R site in Fort Hood, TX: 0 lbs across 1 chemical. No single media clears 70% of the bar (lead segment water discharges at 63.3%). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Ozinga Ready-Mix Streamwood Plant and Shamrock Concrete Co Papillion Plant.
Fort Hood Ready Mix vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
0 lbs 19th percentile higher than 19% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Fort Hood Ready Mix inside Coryell's TRI pounds
Among the 3,265 Nonmetallic Mineral Product facilities in this database, Fort Hood Ready Mix reports the 2,348th-largest volume (0 lbs). This one site accounts for 52.0% of every pound reported in Coryell. Scale peers outside Texas include Ozinga Ready-Mix Streamwood Plant and Shamrock Concrete Co Papillion Plant.
County-dominant here means ≥25% of Coryell's reported pounds (0 lbs county total). Shares only print when the site reports ≥1,000 lbs.
Fort Hood Ready Mix Form-R facts
Compare this facility
See how Fort Hood Ready Mix stacks up against nearby facilities and the typical reporter.
100% less than the comparison
80% less than the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How Fort Hood Ready Mix releases toxic chemicals into the environment. Total: 0 lbs.
Emissions Trend Summary
From 2019 to 2020, total releases increased by 265% (0 lbs to 0 lbs).
Fort Hood Ready Mix: annual Form-R pounds
TRACE site · MIXED pathway · TRI years 2019–2020
- 2019 0
- 2020 0
What this shows Fort Hood Ready Mix year-over-year reported totals (increased by 265% from 2019 to 2020). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Lead And Lead Compounds.
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 0 lbs | 1 |
| 2020 | 0 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2019–2020). Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Lead And Lead Compounds | 0 lbs | - |
Fort Hood Ready Mix in Coryell
Nearest TRI Facilities to Fort Hood Ready Mix
Closest other reporters in Texas - including US Army Fort Cavazos Range Facility, Transit Mix Killeen Plant Plant #1151, Mgc Pure Chemicals America Inc, ordered by distance.
Showing 8 of 2,015 other reporting facilities in Texas.
Similar Nonmetallic Mineral Product Facilities
Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside Texas - e.g. Ozinga Ready-Mix Streamwood Plant, Shamrock Concrete Co Papillion Plant, Rinker Wilson Pipe.
Other Martin Marietta Materials Inc Facilities
Same-parent TRI sites ranked by reported releases - including Martin Marietta North Texas Cement LLC, Martin Marietta Magnesia Specialties Woodville, Mission Valley Rock.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Lead And Lead Compounds; nearby reporters include US Army Fort Cavazos Range Facility. Fort Hood Ready Mix stamps TRACE volume · MIXED pathway · CLEAN carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Fort Hood Ready Mix TRI extract (TRACE · MIXED · CLEAN · lead Lead And Lead Compounds) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Fort Hood Ready Mix totals are self-reported EPCRA §313 estimates for Fort Hood, TX, latest year 2020. Form-R rows span 2019–2020 (2 years). NAICS 327320 · Nonmetallic Mineral Product. 52.0% of Coryell TRI pounds in this extract. Nearest ABS peer: Ozinga Ready-Mix Streamwood Plant (Δ 0 lbs). Pounds ≠ exposure.
Fort Hood Ready Mix stamps TRACE · MIXED pathway (water discharges leads at 63.3%). Pipeline-rendered EPA Form-R only - no editor-typed pounds. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov