EPA TRI Facility · Nonmetallic Mineral Product
Talons Cove Batch Plant
Eagle Mountain, UT · Parent: Kilgore Cos LLC
- Total releases
- 527 lbs
- Chemicals reported
- 2
- Carcinogens
- 1
- Primary pathway
- Land Disposal
LAND Form-R mix
Talons Cove Batch Plant: how the 527 lbs splits
527 lbs across all reported pathways
- Land Disposal 519 lbs 98.4%
- Air Releases 9 lbs 1.6%
Talons Cove Batch Plant's 527 lbs Form-R total is LAND - land disposal is 98.4% of the bar. Next segment: air releases at 1.6%. Leading chemical by pounds: Nitrate compounds (water dissociable; reportable only when in aqueous solution).
TRACE volume LAND pathway CARC-LEAN
Talons Cove Batch Plant is an EPA Toxics Release Inventory reporter in Eagle Mountain, UT, in the nonmetallic mineral product sector. It reported 9 lbs of releases across 1 chemical in 2023, and 527 lbs in total across its 2019-2023 reporting years. That ranks 14,722 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Utah's 220 reporting TRI sites, pounds #1 is not chemical-count #1. Talons Cove Batch Plant is pounds #141 and chemical-count #141 at 527 lbs. Kennecott Utah Copper Mine Concentrators & Power Plant leads reported pounds (781.4M lbs) at 34 chemicals (chemical-count #4). Clean Harbors Aragonite LLC leads chemical count at 193 chemicals (13.3M lbs, pounds #6). Reported volume fell against 2022. Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Dyno Nobel Inc Lehi Site B; U.S. Army National Guard Camp Williams Ranges; Point of the Mountain Facilities; Point South Ready-Mix Concrete. Similar-scale Nonmetallic Mineral Product peers outside Utah: Nipro Pharmapackaging Americas Corp.; Newington Concrete Plant; Uni-Ref Inc.; Marietta Industrial Enterprise S Inc.. Other Kilgore Cos LLC sites in this extract: Arizona Materials- 43RD Ave Batch Plant; North Salt Lake Batch Plant; Sierra North Batch Plant; American Fork Batch Plant. Largest disclosed chemicals by pounds: Nitrate compounds (water dissociable; reportable only when in aqueous solution); Lead.
Talons Cove Batch Plant stamps TRACE volume with a dominant LAND pathway (98.4% land disposal) across 2 chemicals · 1 carcinogen-classified. Cumulative Form-R extract: 527 lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Nipro Pharmapackaging Americas Corp. and Newington Concrete Plant.
Talons Cove Batch Plant vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
527 lbs 43rd percentile higher than 43% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Talons Cove Batch Plant in the Nonmetallic Mineral Product sector extract
Among the 3,265 Nonmetallic Mineral Product facilities in this database, Talons Cove Batch Plant reports the 704th-largest volume, placing it in the top 21.6% of its sector. Scale peers outside Utah include Nipro Pharmapackaging Americas Corp. and Newington Concrete Plant.
Sector rank uses reported TRI pounds only. Share callouts need ≥1,000 lbs so tiny totals cannot mint a false signal.
Annual disclosure change
What changed: EPA TRI 2023 reporting year
- Talons Cove Batch Plant's total reported releases fell from 182 lb in 2022 to 9 lb in 2023, based on EPA TRI filings.
- Talons Cove Batch Plant's land releases fell from 181 lb in 2022 to 3 lb in 2023, based on EPA TRI filings.
- Talons Cove Batch Plant's chemicals reported fell from 2 in 2022 to 1 in 2023, based on EPA TRI filings.
Talons Cove Batch Plant Form-R facts
Compare this facility
See how Talons Cove Batch Plant stacks up against nearby facilities and the typical reporter.
5.7× more than the comparison
About the same as the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How Talons Cove Batch Plant releases toxic chemicals into the environment. Total: 527 lbs.
Emissions Trend Summary
From 2019 to 2023, total releases increased by 2114% (0 lbs to 9 lbs).
Talons Cove Batch Plant: annual Form-R pounds
TRACE site · LAND pathway · TRI years 2019–2023
- 2019 0
- 2020 0
- 2021 0
- 2022 0
- 2023 0
What this shows Talons Cove Batch Plant year-over-year reported totals (increased by 2114% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Nitrate compounds (water dissociable; reportable only when in aqueous solution).
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 0 lbs | 1 |
| 2020 | 143 lbs | 2 |
| 2021 | 193 lbs | 2 |
| 2022 | 182 lbs | 2 |
| 2023 | 9 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2019–2023). 1 of 2 chemicals are carcinogens. Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Nitrate compounds (water dissociable; reportable only when in aqueous solution) | 496 lbs | - |
| Lead | 31 lbs | Carcinogen |
Talons Cove Batch Plant · LAND-pathway site
Nearest TRI Facilities to Talons Cove Batch Plant
Closest other reporters in Utah - including Dyno Nobel Inc Lehi Site B, U.S. Army National Guard Camp Williams Ranges, Point of the Mountain Facilities, ordered by distance.
Showing 8 of 219 other reporting facilities in Utah.
Similar Nonmetallic Mineral Product Facilities
Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside Utah - e.g. Nipro Pharmapackaging Americas Corp., Newington Concrete Plant, Uni-Ref Inc..
Other Kilgore Cos LLC Facilities
Same-parent TRI sites ranked by reported releases - including Arizona Materials- 43RD Ave Batch Plant, North Salt Lake Batch Plant, Sierra North Batch Plant.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Nitrate compounds (water dissociable; reportable only when in aqueous solution), Lead; nearby reporters include Dyno Nobel Inc Lehi Site B. Talons Cove Batch Plant stamps TRACE volume · LAND pathway · CARC-LEAN carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Talons Cove Batch Plant TRI extract (TRACE · LAND · CARC-LEAN · lead Nitrate compounds (water dissociable; reportable only when in aqueous solution)) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Talons Cove Batch Plant totals are self-reported EPCRA §313 estimates for Eagle Mountain, UT, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 327320 · Nonmetallic Mineral Product. 0.0% of Utah TRI pounds in this extract. Nearest ABS peer: Swagelok Precision Machining Inc (Δ 0 lbs). Pounds ≠ exposure.
Talons Cove Batch Plant stamps TRACE volume · LAND pathway · CARC-LEAN · lead Nitrate compounds (water dissociable; reportable only when in aqueous solution). PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov