Ely Copper Mine

NPL Site
Verify at EPA Superfund →

Vershire, VT

According to the EPA Superfund Enterprise Management System, Ely Copper Mine in Vershire, VT is listed with NPL status NPL Site. Its Hazard Ranking System (HRS) score is 50.00. The public extract catalogs 24 contaminant records for this site. NPL listing is a cleanup-authority designation, not a measured health-risk score.

View saved records

Superfund National Priorities List inclusion (status and HRS score shown above) is the EPA's formal designation that a contaminated site qualifies for long-term federal cleanup authority under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A federal-facility classification means the site is owned or operated by a federal agency, which routes cleanup responsibility differently than a privately owned site.

"Construction Complete" (status shown above) is an EPA milestone marking that the physical remedy work is finished, not that the site has exited EPA oversight; long-term monitoring can continue afterward. Deletion from the NPL is a separate, later step the EPA takes only once it determines every planned response action is finished.

NPL listing is a cleanup-authority designation in the EPA record, not a quantitative health-risk score. HRS scores of 28.50 or above qualify a site for the NPL under the EPA screening model (toxicity, pathways, waste quantity, and affected population factors). For current site conditions and official community notices, see the EPA Regional Superfund profile and the Vermont environmental agency.

What is the cleanup status of this Superfund site?

NPL Status
NPL Site
Federal Facility
No
Construction Complete
No
HRS Score
50.00
Deleted from NPL
No

Contaminants

Contaminant Media
ALUMINUM Leachate
ALUMINUM Surface Water
CADMIUM Leachate
CADMIUM Surface Water
COBALT Groundwater
COBALT Solid Waste
COPPER Leachate
COPPER Sediment
COPPER Solid Waste
COPPER Surface Water
IRON Groundwater
IRON Leachate
IRON Solid Waste
IRON Surface Water
LEAD Leachate
LEAD Surface Water
MANGANESE Groundwater
NICKEL Leachate
NICKEL Surface Water
SELENIUM Leachate
SELENIUM Surface Water
ZINC Leachate
ZINC Solid Waste
ZINC Surface Water

Location

City
Vershire
State
Coordinates
43.9274, -72.2855

Other Superfund Sites in Vermont

Site Name Status HRS Score
Bennington Municipal Sanitary Landfill NPL Site 49.07
BFI Sanitary Landfill (Rockingham) NPL Site 41.92
Burgess Brothers Landfill NPL Site 52.58
Commerce Street Plume NPL Site 48.48
Darling Hill Dump Deleted NPL Site 43.92
Elizabeth Mine NPL Site 50.00
Jard Company, Inc. NPL Site 58.31
Old Springfield Landfill NPL Site 34.79
Parker Sanitary Landfill NPL Site 52.29
Pike Hill Copper Mine NPL Site 50.00

How does this site's HRS score compare in Vermont?

Of the 14 Vermont Superfund sites with a scored Hazard Ranking System (HRS) evaluation, Ely Copper Mine ranks #5 by score (50.00).

Either side of it: Parker Sanitary Landfill (52.29), Elizabeth Mine (50.00), Pike Hill Copper Mine (50.00), Pownal Tannery (50.00)

Frequently Asked Questions

What is the Ely Copper Mine Superfund site?
Ely Copper Mine is one of the higher hazard-ranked Superfund sites EPA tracks in Vermont (HRS 50.00, rank #5 of 14 scored sites in the state), located in Vershire, VT. Superfund sites are contaminated locations identified by the EPA for long-term cleanup under CERCLA; a higher HRS rank reflects the EPA's scoring model, not a certified danger level.
What does NPL listing mean for Ely Copper Mine?
According to the EPA, National Priorities List (NPL) listing designates a site for long-term federal Superfund cleanup authority. It is a programmatic status in the Superfund Enterprise Management System, not a quantitative health-risk score for nearby residents. Construction-complete status is not marked in the EPA record for this site. Site-specific conditions and community guidance are published by EPA Regional Superfund offices and the relevant state environmental agency.
What is the HRS score for Ely Copper Mine?
Ely Copper Mine's Hazard Ranking System (HRS) score is 50.00, placing it #5 of 14 Vermont Superfund sites with a scored HRS evaluation -- among the higher-scored sites in the state. Sites with a score of 28.50 or greater qualify for the NPL; the model weighs contaminant toxicity, waste quantity, release likelihood, and affected population, and is not a community health diagnosis.
What contaminants are at the Ely Copper Mine site?
The EPA public Superfund extract catalogs 24 contaminants at Ely Copper Mine, documented through the remedial investigation process. Counts reflect listed records in that extract, not a complete inventory of every substance ever present.
What is the cleanup status of Ely Copper Mine?
Ely Copper Mine is currently NPL Site on the National Priorities List. The EPA Superfund cleanup process includes phases from preliminary assessment through post-construction completion.

NPL listing is a cleanup-authority designation in the EPA record, not a quantitative health-risk score. See Superfund Sites Explained for how the National Priorities List, Hazard Ranking System, and cleanup phases work.

Related

Data sourced from the U.S. Environmental Protection Agency (EPA). See our methodology for details. Retrieved and formatted by PlainEnviro