Peck Iron and Metal

Verify at EPA Superfund →
NPL Site

Portsmouth, VA

Peck Iron and Metal is listed in the EPA Superfund Enterprise Management System with an NPL status of NPL Site and a Hazard Ranking System (HRS) score of 48.52. The site is located in Portsmouth, VA. Superfund National Priorities List inclusion is the EPA's formal designation that a contaminated site qualifies for long-term federal cleanup authority under the Comprehensive Environmental Response, Compensation, and Liability Act.

EPA Superfund records catalog 34 contaminants associated with this site, documented through the remedial investigation process. Construction of the cleanup remedy has not yet been designated as complete in the EPA record.

NPL listing does not, by itself, establish a health risk to nearby residents, it triggers federal authority to investigate, score, and remediate. HRS scores of 28.50 or above qualify a site for the NPL; the ranking weighs contaminant toxicity, release pathways, waste quantity, and affected population. For current site conditions and community health guidance, contact the Virginia environmental or health agency and the EPA Regional Superfund office listed on the official site profile.

What is the cleanup status of this Superfund site?

NPL Status
NPL Site
Federal Facility
No
Construction Complete
No
HRS Score
48.52
Deleted from NPL
No

Contaminants

Contaminant Media
ALUMINUM Soil
BISMUTH-214 Sediment
BISMUTH-214 Soil
CHLORINATED DIOXINS AND FURANS Sediment
CHLORINATED DIOXINS AND FURANS Soil
CHROMIUM Sediment
CHROMIUM Soil
COBALT Sediment
COBALT Soil
COPPER Sediment
COPPER Soil
IRON Sediment
IRON Soil
LEAD Sediment
LEAD Soil
LEAD-210 Sediment
LEAD-210 Soil
LEAD-214 Sediment
LEAD-214 Soil
MANGANESE Soil
MERCURY Sediment
MERCURY Soil
NICKEL Sediment
NICKEL Soil
POLYCHLORINATED BIPHENYLS (PCBs) Soil
RADIUM-226 Sediment
RADIUM-226 Soil
SELENIUM Soil
SILVER Soil
THALLIUM Sediment
THALLIUM Soil
VANADIUM Soil
ZINC Sediment
ZINC Soil

Location

City
Portsmouth
Coordinates
36.8095, -76.3088

Other Superfund Sites in Virginia

Site Name Status HRS Score
Abex Corp. NPL Site 36.53
Arrowhead Associates, Inc./Scovill Corp. NPL Site 37.15
Atlantic Wood Industries, Inc. NPL Site 37.14
Avtex Fibers, Inc. NPL Site 35.39
Buckingham County Landfill NPL Site 40.70
C & R Battery Co., Inc. Deleted NPL Site 46.44
Chisman Creek NPL Site 47.19
Culpeper Wood Preservers, Inc. NPL Site 45.91
Defense General Supply Center (DLA) NPL Site 33.85
Dixie Caverns County Landfill Deleted NPL Site 35.27

Frequently Asked Questions

What is the Peck Iron and Metal Superfund site?
Peck Iron and Metal is an active National Priorities List (NPL) Superfund site located in Portsmouth, VA. It has a Hazard Ranking System (HRS) score of 48.52. Superfund sites are contaminated locations identified by the EPA for long-term cleanup.
Is Peck Iron and Metal dangerous to live near?
The presence of a site on the EPA National Priorities List does not by itself indicate an immediate health risk to nearby residents. EPA evaluates sites through a comprehensive process including remedial investigation and risk assessment. Cleanup activities may still be ongoing. For site-specific health questions, contact your state environmental or health agency.
What is the HRS score for Peck Iron and Metal?
Peck Iron and Metal has a Hazard Ranking System (HRS) score of 48.52. The HRS is the EPA's principal mechanism for evaluating Superfund sites, scores of 28.50 or greater qualify for the NPL. Higher scores indicate greater potential risk based on toxicity, waste quantity, release likelihood, and affected population.
What contaminants are at the Peck Iron and Metal site?
The EPA has identified 34 contaminants at Peck Iron and Metal. Contaminant data is maintained in the EPA's Superfund database and is based on site investigations conducted during the remedial process.
What is the cleanup status of Peck Iron and Metal?
Peck Iron and Metal is currently NPL Site on the National Priorities List. The EPA Superfund cleanup process includes phases from preliminary assessment through post-construction completion.

About Superfund

The National Priorities List (NPL) is the list of sites of national priority among the known releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. The NPL is intended primarily to guide the EPA in determining which sites warrant further investigation.

The Hazard Ranking System (HRS) score is the principal mechanism the EPA uses to evaluate sites for placement on the NPL. Sites with an HRS score of 28.50 or greater are eligible for the NPL. Higher scores indicate greater potential risk.

The EPA's Superfund cleanup process typically follows these phases: preliminary assessment, site inspection, NPL listing, remedial investigation/feasibility study, remedy selection, remedial design/action, construction completion, post-construction completion, and NPL deletion. Some sites remain on the NPL for decades.

PlainEnviro presents this data without advocacy framing. The presence of a site on the NPL does not by itself indicate an immediate health risk to nearby residents. For site-specific health questions, consult your local environmental or health agency.

Related

Data sourced from the U.S. Environmental Protection Agency (EPA). See our methodology for details. Retrieved and formatted by PlainEnviro Editorial