EPA TRI Facility · Other
US Army Hawthorne Army Depot New Bomb
Hawthorne, NV · Parent: US Department of Defense
- Total releases
- 7.7K lbs
- Chemicals reported
- 5
- Carcinogens
- 2
- Primary pathway
- Air Releases
AIR Form-R mix
US Army Hawthorne Army Depot New Bomb: how the 7.7K lbs splits
7.7K lbs across all reported pathways
- Air Releases 7.7K lbs 100.0%
US Army Hawthorne Army Depot New Bomb's 7.7K lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Aluminum (fume or dust).
Carcinogen-classified pounds vs other reported pounds
Same cumulative TRI total as above, split by EPA/IARC carcinogen classification on each chemical: pounds share, not chemical count. Classification is not a site health-risk score.
LIGHT volume AIR pathway TRACE-CARC
US Army Hawthorne Army Depot New Bomb is an EPA Toxics Release Inventory reporter in Hawthorne, NV, in the other sector. It reported 48 lbs of releases across 1 chemical in 2023, and 7.7K lbs in total across its 2019-2023 reporting years. That ranks 10,340 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Nevada's 158 reporting TRI sites, pounds #1 is not chemical-count #1. US Army Hawthorne Army Depot New Bomb is pounds #62 and chemical-count #50 at 7.7K lbs. Nevada Gold Mines LLC - Goldstrike Mines Inc leads reported pounds (930.8M lbs) at 33 chemicals (chemical-count #2). US Ecology Nevada Inc. leads chemical count at 93 chemicals (41.2M lbs, pounds #8). Reported volume fell against 2022. Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: US Army Hawthorne Army Depot Main Base; Aurora Mine; Borealis Mining Co LLC; Isabella Pearl Mine (006-240-02). Similar-scale Other peers outside Nevada: Isti Plant Services; Federal Bureau of Prisons; Grand Isle Shipyard Inc; Federal Correctional Institution Ray Brook. Other US Department of Defense sites in this extract: U.S. Army Radford Army Ammunition Plant; US Army Holston Army Ammunition Plant; McIeast-Mcb Camlej Main Facility; US Marine Corps Mcb Camp Pendleton. Largest disclosed chemicals by pounds: Aluminum (fume or dust); Lead And Lead Compounds; Chloroprene; Dinitrotoluene (mixed isomers).
US Army Hawthorne Army Depot New Bomb stamps LIGHT volume with a dominant AIR pathway (100.0% air releases) across 5 chemicals · 2 carcinogen-classified. Cumulative Form-R extract: 7.7K lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Isti Plant Services and Federal Bureau of Prisons.
US Army Hawthorne Army Depot New Bomb vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
7.7K lbs Top 40% higher than 60% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
US Army Hawthorne Army Depot New Bomb: Aluminum (fume or dust)-led volume
Among the 632 Other facilities in this database, US Army Hawthorne Army Depot New Bomb reports the 272nd-largest volume (7.7K lbs). Its reported volume is concentrated rather than spread: Aluminum (fume or dust) alone is 89.6% of the total. Scale peers outside Nevada include Isti Plant Services and Federal Bureau of Prisons.
Concentrated means ≥60% of US Army Hawthorne Army Depot New Bomb's pounds in one chemical - here Aluminum (fume or dust) at 89.6%. Not a toxicity score.
Annual disclosure change
What changed: EPA TRI 2023 reporting year
- US Army Hawthorne Army Depot New Bomb's total reported releases fell from 6.9 thousand lb in 2022 to 48 lb in 2023, based on EPA TRI filings.
- US Army Hawthorne Army Depot New Bomb's air releases fell from 6.9 thousand lb in 2022 to 48 lb in 2023, based on EPA TRI filings.
- US Army Hawthorne Army Depot New Bomb's chemicals reported fell from 2 in 2022 to 1 in 2023, based on EPA TRI filings.
US Army Hawthorne Army Depot New Bomb Form-R facts
Compare this facility
See how US Army Hawthorne Army Depot New Bomb stacks up against nearby facilities and the typical reporter.
2.3× more than the comparison
44% less than the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How US Army Hawthorne Army Depot New Bomb releases toxic chemicals into the environment. Total: 7.7K lbs.
Emissions Trend Summary
From 2019 to 2023, total releases decreased by 86% (333 lbs to 48 lbs).
US Army Hawthorne Army Depot New Bomb: annual Form-R pounds
LIGHT site · AIR pathway · TRI years 2019–2023
- 2019 0
- 2020 0
- 2021 0
- 2022 0
- 2023 0
What this shows US Army Hawthorne Army Depot New Bomb year-over-year reported totals (decreased by 86% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Aluminum (fume or dust).
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 333 lbs | 2 |
| 2020 | 257 lbs | 3 |
| 2021 | 135 lbs | 1 |
| 2022 | 6.9K lbs | 2 |
| 2023 | 48 lbs | 1 |
Chemical Releases
Aggregated across all reporting years (2019–2023). 2 of 5 chemicals are carcinogens. Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Aluminum (fume or dust) | 6.9K lbs | - |
| Lead And Lead Compounds | 795 lbs | - |
| Chloroprene | 5 lbs | Carcinogen |
| Dinitrotoluene (mixed isomers) | 0 lbs | - |
| Hexachlorobenzene | 0 lbs | Carcinogen |
US Army Hawthorne Army Depot New Bomb · AIR-pathway site
Nearest TRI Facilities to US Army Hawthorne Army Depot New Bomb
Closest other reporters in Nevada - including US Army Hawthorne Army Depot Main Base, Aurora Mine, Borealis Mining Co LLC, ordered by distance.
Showing 8 of 157 other reporting facilities in Nevada.
Similar Other Facilities
Other Other facilities with similar total release volumes (±80%), outside Nevada - e.g. Isti Plant Services, Federal Bureau of Prisons, Grand Isle Shipyard Inc.
Compare beyond Nevada
Nationwide peers by reported pounds & chemical count
Cross-state TRI reporters nearest US Army Hawthorne Army Depot New Bomb on cumulative reported pounds (7.7K lbs) and distinct chemical count (5). Release-pound peers include Global Charlotte North & South Terminals, Precision Technology Inc, Otics USA. Chemical-count peers include Abbvie Ltd, Lilly del Caribe Inc Carolin A, Baxter Healthcare of Puerto Rico LLC. Neighborhoods are forced disjoint so each axis surfaces a different set of sites.
Similar reported release pounds
Nearest out-of-state reporters (≥1,000 lbs) by absolute TRI pounds, not same-industry or same-county neighbors.
- Global Charlotte North & South Terminals Charlotte, NC · Petroleum Bulk Terminals 7.7K lbs reported
- Precision Technology Inc Salt Lake City, UT · Computers and Electronic Products 7.7K lbs reported
- Otics USA Kodak, TN · Fabricated Metals 7.7K lbs reported
- Curtiss Wright Electro Mech Corp Cheswick, PA · Machinery 7.7K lbs reported
Similar chemical count
Nearest out-of-state reporters by distinct Form-R chemicals (deduped against the release-pound neighborhood).
Other US Department of Defense Facilities
Same-parent TRI sites ranked by reported releases - including U.S. Army Radford Army Ammunition Plant, US Army Holston Army Ammunition Plant, McIeast-Mcb Camlej Main Facility.
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Aluminum (fume or dust), Lead And Lead Compounds, Chloroprene, Dinitrotoluene (mixed isomers); nearby reporters include US Army Hawthorne Army Depot Main Base. US Army Hawthorne Army Depot New Bomb stamps LIGHT volume · AIR pathway · TRACE-CARC carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This US Army Hawthorne Army Depot New Bomb TRI extract (LIGHT · AIR · TRACE-CARC · lead Aluminum (fume or dust)) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
US Army Hawthorne Army Depot New Bomb totals are self-reported EPCRA §313 estimates for Hawthorne, NV, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 928110 · Other. 2.6% of Mineral TRI pounds in this extract. Nearest ABS peer: Global Charlotte North & South Terminals (Δ 5 lbs). Pounds ≠ exposure.
US Army Hawthorne Army Depot New Bomb stamps LIGHT volume · AIR pathway · TRACE-CARC · lead Aluminum (fume or dust). PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov