EPA TRI Facility · Other

US Army Hawthorne Army Depot New Bomb

Hawthorne, NV · Parent: US Department of Defense

Total releases
7.7K lbs
Chemicals reported
5
Carcinogens
2
Primary pathway
Air Releases

AIR Form-R mix

US Army Hawthorne Army Depot New Bomb: how the 7.7K lbs splits

7.7K lbs across all reported pathways

  • Air Releases 7.7K lbs 100.0%

US Army Hawthorne Army Depot New Bomb's 7.7K lbs Form-R total is AIR - air releases is 100.0% of the bar. Off-site transfers stay separate from air, water, and land releases. Leading chemical by pounds: Aluminum (fume or dust).

Carcinogen-classified pounds vs other reported pounds

Same cumulative TRI total as above, split by EPA/IARC carcinogen classification on each chemical: pounds share, not chemical count. Classification is not a site health-risk score.

LIGHT volume AIR pathway TRACE-CARC

US Army Hawthorne Army Depot New Bomb is an EPA Toxics Release Inventory reporter in Hawthorne, NV, in the other sector. It reported 48 lbs of releases across 1 chemical in 2023, and 7.7K lbs in total across its 2019-2023 reporting years. That ranks 10,340 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Nevada's 158 reporting TRI sites, pounds #1 is not chemical-count #1. US Army Hawthorne Army Depot New Bomb is pounds #62 and chemical-count #50 at 7.7K lbs. Nevada Gold Mines LLC - Goldstrike Mines Inc leads reported pounds (930.8M lbs) at 33 chemicals (chemical-count #2). US Ecology Nevada Inc. leads chemical count at 93 chemicals (41.2M lbs, pounds #8). Reported volume fell against 2022. Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: US Army Hawthorne Army Depot Main Base; Aurora Mine; Borealis Mining Co LLC; Isabella Pearl Mine (006-240-02). Similar-scale Other peers outside Nevada: Isti Plant Services; Federal Bureau of Prisons; Grand Isle Shipyard Inc; Federal Correctional Institution Ray Brook. Other US Department of Defense sites in this extract: U.S. Army Radford Army Ammunition Plant; US Army Holston Army Ammunition Plant; McIeast-Mcb Camlej Main Facility; US Marine Corps Mcb Camp Pendleton. Largest disclosed chemicals by pounds: Aluminum (fume or dust); Lead And Lead Compounds; Chloroprene; Dinitrotoluene (mixed isomers).

View saved records
Verify at EPA TRI →

US Army Hawthorne Army Depot New Bomb stamps LIGHT volume with a dominant AIR pathway (100.0% air releases) across 5 chemicals · 2 carcinogen-classified. Cumulative Form-R extract: 7.7K lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Isti Plant Services and Federal Bureau of Prisons.

#10,340 of 25,986 TRI facilities nationwide by total reported releases. Ranking reflects reported pounds, not toxicity or health risk.

US Army Hawthorne Army Depot New Bomb vs. every reporting TRI facility

Cumulative reported release pounds, with this facility marked in the national distribution

7.7K lbs Top 40% higher than 60% of 25,986 reporting TRI facilities

This facility 0 lbs 20M+ lbs every reporting TRI facility, bucketed by value

Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.

Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year

US Army Hawthorne Army Depot New Bomb: Aluminum (fume or dust)-led volume

Among the 632 Other facilities in this database, US Army Hawthorne Army Depot New Bomb reports the 272nd-largest volume (7.7K lbs). Its reported volume is concentrated rather than spread: Aluminum (fume or dust) alone is 89.6% of the total. Scale peers outside Nevada include Isti Plant Services and Federal Bureau of Prisons.

Concentrated means ≥60% of US Army Hawthorne Army Depot New Bomb's pounds in one chemical - here Aluminum (fume or dust) at 89.6%. Not a toxicity score.

Annual disclosure change

What changed: EPA TRI 2023 reporting year

2022 → 2023
  • US Army Hawthorne Army Depot New Bomb's total reported releases fell from 6.9 thousand lb in 2022 to 48 lb in 2023, based on EPA TRI filings.
  • US Army Hawthorne Army Depot New Bomb's air releases fell from 6.9 thousand lb in 2022 to 48 lb in 2023, based on EPA TRI filings.
  • US Army Hawthorne Army Depot New Bomb's chemicals reported fell from 2 in 2022 to 1 in 2023, based on EPA TRI filings.

US Army Hawthorne Army Depot New Bomb Form-R facts

Sector
Other
LIGHT volume
7.7K lbs
AIR pathway
Air Releases
TRACE-CARC chem count
5 · 2 carc.
Lead chemical
Aluminum (fume or dust)

Compare this facility

See how US Army Hawthorne Army Depot New Bomb stacks up against nearby facilities and the typical reporter.

Total reported releases
US Army Hawthorne Army Depot New Bomb
7.7K lbs
US Army Hawthorne Army Depot Main Base
3.4K lbs

2.3× more than the comparison

Chemicals reported
US Army Hawthorne Army Depot New Bomb
5
US Army Hawthorne Army Depot Main Base
9

44% less than the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How US Army Hawthorne Army Depot New Bomb releases toxic chemicals into the environment. Total: 7.7K lbs.

Air Releases 7.7K lbs (100.0%)
View 5-Year Emissions Trend →

Emissions Trend Summary

From 2019 to 2023, total releases decreased by 86% (333 lbs to 48 lbs).

US Army Hawthorne Army Depot New Bomb: annual Form-R pounds

LIGHT site · AIR pathway · TRI years 2019–2023

million lbs

What this shows US Army Hawthorne Army Depot New Bomb year-over-year reported totals (decreased by 86% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Aluminum (fume or dust).

Source EPA Toxics Release Inventory (TRI)
Year Total Chemicals
2019 333 lbs 2
2020 257 lbs 3
2021 135 lbs 1
2022 6.9K lbs 2
2023 48 lbs 1

Chemical Releases

Aggregated across all reporting years (2019–2023). 2 of 5 chemicals are carcinogens. Sorted by total release volume.

Chemical Total Flags
Aluminum (fume or dust) 6.9K lbs -
Lead And Lead Compounds 795 lbs -
Chloroprene 5 lbs Carcinogen
Dinitrotoluene (mixed isomers) 0 lbs -
Hexachlorobenzene 0 lbs Carcinogen

US Army Hawthorne Army Depot New Bomb · AIR-pathway site

Hawthorne, NV
38.5475, -118.6607
County TRI context
Mineral · 2.6% of county pounds
Parent company
US Department of Defense

Compare beyond Nevada

Nationwide peers by reported pounds & chemical count

Cross-state TRI reporters nearest US Army Hawthorne Army Depot New Bomb on cumulative reported pounds (7.7K lbs) and distinct chemical count (5). Release-pound peers include Global Charlotte North & South Terminals, Precision Technology Inc, Otics USA. Chemical-count peers include Abbvie Ltd, Lilly del Caribe Inc Carolin A, Baxter Healthcare of Puerto Rico LLC. Neighborhoods are forced disjoint so each axis surfaces a different set of sites.

About TRI Data

Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

On this page the largest disclosed chemicals include Aluminum (fume or dust), Lead And Lead Compounds, Chloroprene, Dinitrotoluene (mixed isomers); nearby reporters include US Army Hawthorne Army Depot Main Base. US Army Hawthorne Army Depot New Bomb stamps LIGHT volume · AIR pathway · TRACE-CARC carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.

Use and verify this record

This US Army Hawthorne Army Depot New Bomb TRI extract (LIGHT · AIR · TRACE-CARC · lead Aluminum (fume or dust)) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.

US Army Hawthorne Army Depot New Bomb totals are self-reported EPCRA §313 estimates for Hawthorne, NV, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 928110 · Other. 2.6% of Mineral TRI pounds in this extract. Nearest ABS peer: Global Charlotte North & South Terminals (Δ 5 lbs). Pounds ≠ exposure.

US Army Hawthorne Army Depot New Bomb stamps LIGHT volume · AIR pathway · TRACE-CARC · lead Aluminum (fume or dust). PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.

All federal data sources used on this page
  • EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
  • EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
  • EPA Facility Registry Service - facility location and identity. epa.gov
  • EPA ECHO - regulatory and compliance context. epa.gov
  • EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov