EPA TRI Facility · Machinery

Parker Hannifin Copper & Assembly Facility

Greenfield, TN · Parent: Parker Hannifin Corp

Total releases
25 lbs
Chemicals reported
1
Latest report
2023
Primary pathway
Off-site Transfers
Verify at EPA TRI →

Parker Hannifin Copper & Assembly Facility has reported 25 lbs of toxic releases across 1 chemical to the EPA Toxic Release Inventory, based on annual facility disclosures from 2019 through 2023. The facility operates in the Machinery sector. The primary release pathway is off-site transfers, accounting for 100% of total releases. All release data shown below is self-reported to the EPA under the Emergency Planning and Community Right-to-Know Act (EPCRA) Section 313.

#17,792 of 25,902 TRI facilities nationwide by total reported releases. Ranking reflects reported pounds, not toxicity or health risk.

Parker Hannifin Copper & Assembly Facility files annual Form R disclosures to the EPA Toxics Release Inventory under EPCRA Section 313, classified under NAICS 333415 (Machinery). Across 5 years of records spanning 2019–2023, the site has disclosed 25 lbs in cumulative toxic releases across 1 distinct chemical.

The dominant release pathway is off-site transfers at 25 lbs (100.0% of total volume). Between 2019 and 2023, reported totals held roughly flat - from 5 lbs to 5 lbs. The facility is operated under parent company Parker Hannifin Corp.

TRI Form R values are self-reported estimates, not measured stack emissions, and treat every pound of reported chemical equally regardless of toxicity. Inclusion in the TRI database does not establish a health risk to nearby residents; it documents the annual reporting record that Parker Hannifin Copper & Assembly Facility has filed with the EPA under federal community right-to-know requirements.

Quick Facts

Industry
Machinery
NAICS Code
333415
Total Releases
25 lbs
Chemicals Reported
1
Latest Report Year
2023

Compare this facility

See how Parker Hannifin Copper & Assembly Facility stacks up against nearby facilities and the typical reporter.

Total reported releases
Parker Hannifin Copper & Assembly Facility
25 lbs
Nyrstar Clarksville Inc
72.9M lbs

100% less than the comparison

Chemicals reported
Parker Hannifin Copper & Assembly Facility
1
Nyrstar Clarksville Inc
13

92% less than the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How Parker Hannifin Copper & Assembly Facility releases toxic chemicals into the environment. Total: 25 lbs.

Off-site Transfers 25 lbs (100.0%)
View 5-Year Emissions Trend →

Emissions Trend Summary

From 2019 to 2023, total releases held roughly flat (5 lbs to 5 lbs).

Reported total releases by year

Parker Hannifin Copper & Assembly Facility - annual TRI totals

million lbs

What this shows Year-over-year reported totals. TRI figures are self-reported estimates and can swing with production levels, waste-rock handling and reporting changes, not only with emissions controls.

Source EPA Toxics Release Inventory (TRI)
Year Total Chemicals
2019 5 lbs 1
2020 5 lbs 1
2021 5 lbs 1
2022 5 lbs 1
2023 5 lbs 1

Chemical Releases

Aggregated across all reporting years (2019–2023). Sorted by total release volume.

Chemical Total Flags
Copper 25 lbs -

Location

Coordinates
36.1746, -88.8063
ZIP Code
38230
EPA Facility ID
38230PRKRH100PA

About TRI Data

Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

Data comes from the EPA Toxic Release Inventory (TRI) program. Facilities that manufacture, process, or otherwise use listed toxic chemicals above threshold amounts are required to report annually to the EPA.

Release quantities are self-reported by the facility and may represent estimates rather than exact measurements. "Total releases" includes releases to air, water, land, and off-site transfers for disposal. Quantities shown here are aggregated across all available reporting years.

PlainEnviro presents this data without advocacy framing. The presence of a facility in the TRI database does not by itself indicate a health risk. For site-specific health questions, consult your local environmental or health agency.

Frequently Asked Questions

What chemicals does Parker Hannifin Copper & Assembly Facility release?
Parker Hannifin Copper & Assembly Facility has reported releases of 1 chemical to the EPA Toxic Release Inventory, totaling 25 lbs.
What industry is Parker Hannifin Copper & Assembly Facility in?
Parker Hannifin Copper & Assembly Facility is classified under the "Machinery" industry (NAICS code 333415), located in Greenfield, TN.
How long has Parker Hannifin Copper & Assembly Facility reported to the TRI?
Parker Hannifin Copper & Assembly Facility has EPA Toxic Release Inventory data spanning 5 years, from 2019 to 2023.
How does Parker Hannifin Copper & Assembly Facility release toxic chemicals?
The primary release pathway for Parker Hannifin Copper & Assembly Facility is off-site transfers, accounting for 100.0% of total releases (25 lbs).
Are emissions from Parker Hannifin Copper & Assembly Facility increasing or decreasing?
From 2019 to 2023, total releases held roughly flat, from 5 lbs to 5 lbs.
Is Parker Hannifin Copper & Assembly Facility a health risk?
The presence of a facility in the TRI database does not by itself indicate a health risk. Release quantities are self-reported estimates. For site-specific health questions, consult your local environmental or health agency.

What to do with this facility's data

Use this facility profile as a starting point, then check how it compares.

  • See whether releases reported by Parker Hannifin Copper & Assembly Facility are rising or falling over time. View trends
  • This facility ranks #17,792 of 25,902 TRI facilities nationwide by total reported releases. Ranking reflects reported pounds, not toxicity or health risk. See the full rankings
  • Check Tennessee's statewide profile for the full picture: total facilities, water systems, and Superfund sites. View Tennessee profile

TRI release totals are self-reported estimates submitted to the EPA, not independently measured stack emissions; a high rank reflects reported volume, not necessarily local health risk.

Related

Sources & how this page was built

Every figure on this page traces to public, federal-government data on Parker Hannifin Copper & Assembly Facility. The records below are the primary sources; our methodology explains how they are joined, computed, and verified.

Retrieved and formatted by PlainEnviro Editorial. TRI release totals are self-reported estimates, not measured stack emissions.

According to the U.S. Environmental Protection Agency, the Toxics Release Inventory has required annual industrial disclosure since its creation under the Emergency Planning and Community Right-to-Know Act in October 1986, and this facility's record is drawn from PlainEnviro's database of more than 25,000 EPA-tracked facilities through the 2023 reporting year; see our methodology for full source citations and refresh cadence.