EPA TRI Facility · Nonmetallic Mineral Product

Txi-Bastrop Ready Mix

Bastrop, TX · Parent: Martin Marietta Materials Inc

Total releases
1 lbs
Chemicals reported
2
Latest report
2023
Primary pathway
Water Discharges

WATER Form-R mix

Txi-Bastrop Ready Mix: how the 1 lbs splits

1 lbs across all reported pathways

  • Water Discharges 1 lbs 83.8%
  • Air Releases 0 lbs 16.3%

Txi-Bastrop Ready Mix's 1 lbs Form-R total is WATER - water discharges is 83.8% of the bar. Next segment: air releases at 16.3%. Leading chemical by pounds: Lead And Lead Compounds.

TRACE volume WATER pathway CLEAN

Txi-Bastrop Ready Mix is an EPA Toxics Release Inventory reporter in Bastrop, TX, in the nonmetallic mineral product sector. It reported 0 lbs of releases across 1 chemical in 2023, and 1 lbs in total across its 2019-2023 reporting years. That ranks 19,956 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Texas's 2,016 reporting TRI sites, pounds #1 is not chemical-count #1. Txi-Bastrop Ready Mix is pounds #1804 and chemical-count #1422 at 1 lbs. Ascend Performance Materials-Chocolate Bayou Plant leads reported pounds (94.0M lbs) at 36 chemicals (chemical-count #35). Veolia Es Technical Solutions LLC Port Arthur Facility leads chemical count at 246 chemicals (1.5M lbs, pounds #112). Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Federal Correctional Institution Bastrop; US Army National Guard Camp Swift Ranges; Darling Ingredients Inc.; Giddings Gas Plant. Similar-scale Nonmetallic Mineral Product peers outside Texas: Central Pre-Mix Concrete Products Co; Kelso Rm; Adams an Oldcastle Co-Charlotte; Quikrete - Cleveland Oh Plant. Other Martin Marietta Materials Inc sites in this extract: Martin Marietta North Texas Cement LLC; Martin Marietta Magnesia Specialties Woodville; Mission Valley Rock; Martin Marietta Arizona LLC - River Ranch Plant. Largest disclosed chemicals by pounds: Lead And Lead Compounds; Lead compounds.

View saved records
Verify at EPA TRI →

Txi-Bastrop Ready Mix stamps TRACE volume with a dominant WATER pathway (83.8% water discharges) across 2 chemicals. Cumulative Form-R extract: 1 lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Central Pre-Mix Concrete Products Co and Kelso Rm.

#19,956 of 25,986 TRI facilities nationwide by total reported releases. Ranking reflects reported pounds, not toxicity or health risk.

Txi-Bastrop Ready Mix vs. every reporting TRI facility

Cumulative reported release pounds, with this facility marked in the national distribution

1 lbs 23rd percentile higher than 23% of 25,986 reporting TRI facilities

This facility 0 lbs 20M+ lbs every reporting TRI facility, bucketed by value

Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.

Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year

Txi-Bastrop Ready Mix in the Nonmetallic Mineral Product sector extract

Among the 3,265 Nonmetallic Mineral Product facilities in this database, Txi-Bastrop Ready Mix reports the 1,649th-largest volume (1 lbs). Scale peers outside Texas include Central Pre-Mix Concrete Products Co and Kelso Rm.

Sector rank uses reported TRI pounds only. Share callouts need ≥1,000 lbs so tiny totals cannot mint a false signal.

Txi-Bastrop Ready Mix Form-R facts

Sector
Nonmetallic Mineral Product
TRACE volume
1 lbs
WATER pathway
Water Discharges
CLEAN chem count
2
Lead chemical
Lead And Lead Compounds

Compare this facility

See how Txi-Bastrop Ready Mix stacks up against nearby facilities and the typical reporter.

Total reported releases
Txi-Bastrop Ready Mix
1 lbs
Federal Correctional Institution Bastrop
2.6K lbs

100% less than the comparison

Chemicals reported
Txi-Bastrop Ready Mix
2
Federal Correctional Institution Bastrop
1

2.0× more than the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How Txi-Bastrop Ready Mix releases toxic chemicals into the environment. Total: 1 lbs.

Water Discharges 1 lbs (83.8%)
Air Releases 0 lbs (16.3%)
View 5-Year Emissions Trend →

Emissions Trend Summary

From 2019 to 2023, total releases increased by 68% (0 lbs to 0 lbs).

Txi-Bastrop Ready Mix: annual Form-R pounds

TRACE site · WATER pathway · TRI years 2019–2023

million lbs

What this shows Txi-Bastrop Ready Mix year-over-year reported totals (increased by 68% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Lead And Lead Compounds.

Source EPA Toxics Release Inventory (TRI)
Year Total Chemicals
2019 0 lbs 1
2020 0 lbs 1
2021 0 lbs 1
2022 0 lbs 1
2023 0 lbs 1

Chemical Releases

Aggregated across all reporting years (2019–2023). Sorted by total release volume.

Chemical Total Flags
Lead And Lead Compounds 0 lbs -
Lead compounds 0 lbs -

Txi-Bastrop Ready Mix · WATER-pathway site

Bastrop, TX
30.0509, -97.1938
County TRI context
Bastrop · 0.0% of county pounds
Parent company
Martin Marietta Materials Inc

Similar Nonmetallic Mineral Product Facilities

Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside Texas - e.g. Central Pre-Mix Concrete Products Co, Kelso Rm, Adams an Oldcastle Co-Charlotte.

About TRI Data

Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

On this page the largest disclosed chemicals include Lead And Lead Compounds, Lead compounds; nearby reporters include Federal Correctional Institution Bastrop. Txi-Bastrop Ready Mix stamps TRACE volume · WATER pathway · CLEAN carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.

Use and verify this record

This Txi-Bastrop Ready Mix TRI extract (TRACE · WATER · CLEAN · lead Lead And Lead Compounds) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.

Txi-Bastrop Ready Mix totals are self-reported EPCRA §313 estimates for Bastrop, TX, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 327320 · Nonmetallic Mineral Product. 0.0% of Bastrop TRI pounds in this extract. Nearest ABS peer: Bull Moose Tube (Δ 0 lbs). Pounds ≠ exposure.

Txi-Bastrop Ready Mix stamps TRACE volume · WATER pathway · CLEAN · lead Lead And Lead Compounds. PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.

All federal data sources used on this page
  • EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
  • EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
  • EPA Facility Registry Service - facility location and identity. epa.gov
  • EPA ECHO - regulatory and compliance context. epa.gov
  • EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov