PlainEnviro

Superfund site · Utah

International Smelting and Refining Superfund site

International Smelting and Refining in Tooele, UT was on EPA's National Priorities List from July 27, 2000 until its deletion on October 11, 2011. EPA classes it as a manufacturing, processing or maintenance site. SEMS records 2 contaminants there, including arsenic and lead. (EPA SEMS, October 28, 2026.)

Check this record at EPA: EPA's site profile

Deleted fromNPL status

2000listed

2contaminants recorded

4Records of Decision

What is the International Smelting and Refining Superfund site?

Hazardous materials disposed: smelter & laboratory wastes placed in landfill & below ground lime sump. Atlantic Richfield Company (formerly ARCO) owns the former smelting property and the surrounding land. This residential area is locally referred to as Lincoln Township or Pine Canyon.

These passages are from EPA's own description of the site; the full text, the cleanup plan and the latest review are in EPA's site profile.

Source: EPA SEMS site description, report dated October 28, 2026.

What is the status of the International Smelting and Refining Superfund site?

The National Priorities List is EPA's list of the hazardous-waste sites that qualify for long-term federal cleanup.

EPA recorded construction of the cleanup remedies at International Smelting and Refining as complete on September 27, 2007, 4 years before the site was deleted from the list.

National Priorities List dates for International Smelting and Refining
StepDate
ProposedApril 23, 1999
Listed (final)July 27, 2000
Construction completeSeptember 27, 2007
DeletedOctober 11, 2011

Source: EPA SEMS report "All Final, Proposed and Deleted NPL sites with NPL date, category and contaminants", October 28, 2026; EPA "Superfund National Priorities List (NPL) Sites with Status Information", October 2026 (dates and construction completion). Confirm in EPA's site profile.

What contaminants are at International Smelting and Refining?

SEMS lists 2 contaminants found at the site in soil, sediment, groundwater, surface water or air during its investigation. A listed contaminant was found at the site; the list does not say how much, where, or whether people are exposed.

  • arsenic
  • lead

Source: EPA SEMS contaminant records for UTD093120921, October 28, 2026.

What has EPA decided about cleaning up International Smelting and Refining?

EPA's document index holds 4 Records of Decision (the cleanup plans) and 3 five-year reviews for International Smelting and Refining. The latest review is dated July 19, 2022; reviews recur every five years where contamination is left in place, which would put the next one around July 2027.

Source: EPA Superfund site documents (SEMS public document index, HQ master collection), read November 11, 2026.

Which public water systems serve Tooele County?

13 active community water systems list Tooele County as an area they serve; 11 draw on groundwater. Being in the same county is not evidence that a site affects a system's water: whether wells are affected is assessed in the site's five-year reviews and the state's source-water assessment.

The 10 largest community water systems in Tooele County
SystemPeople servedSource
Tooele City Water System41,770groundwater
Grantsville City16,284groundwater
Stansbury Park Improvement District9,839groundwater
Oquirrh Mountain Water Co2,500groundwater
Wendover City Water System1,525surface water
Erda Acres Water Co1,150groundwater
South Rim Water System834groundwater
Lincoln Culinary Water Assn660groundwater
Stockton Town Water System620surface water
Dugway - English Village600groundwater

Source: EPA SDWIS federal data, quarter 2026Q3: water systems and the counties they report serving.

Which TRI facilities report releases near International Smelting and Refining?

TRI facilities within 10 miles of the site's coordinates, nearest first
FacilityMilesLatest yearReleases that year (lb)
U.S. Army Tooele Army Depot5.420240
Airgas Nitrous Oxide Corp5.8202465,200
Hunter Panels A Div of Carlisle Construction Materials6.4202410
Erda RMX - Dba Altaview Concrete6.520221
Kennecott Utah Copper Mine Concentrators & Power Plant7.32024192,700,174
Geneva Rock Products Inc. - Tooele7.820240
Bullfrog International L.C.8.920240

Distance is straight-line from EPA's site coordinates to each facility's reported coordinates. Being near is not evidence that a facility contributed to the site.

Source: EPA TRI basic data files 2019-2024 (facility coordinates); EPA SEMS site coordinates.

Sources: the EPA files behind this page
  • EPA SEMS: all final, proposed and deleted NPL sites with dates, category and contaminants, report dated October 28, 2026: www.epa.gov
  • EPA National Priorities List: www.epa.gov
  • EPA Toxics Release Inventory basic data files, reporting years 2019-2024, reporting year 2024 processed November 5, 2025: www.epa.gov
  • EPA Safe Drinking Water Act data download (SDWIS), quarter 2026Q3, October 14, 2026: echo.epa.gov
  • EPA ECHO Exporter (inspections, enforcement, compliance), file dated November 8, 2026: echo.epa.gov