Tooele Army Depot (North Area)

Verify at EPA Superfund →
NPL Site

Tooele, UT

Tooele Army Depot (North Area) is listed in the EPA Superfund Enterprise Management System with an NPL status of NPL Site and a Hazard Ranking System (HRS) score of 53.95. The site is located in Tooele, UT. Superfund National Priorities List inclusion is the EPA's formal designation that a contaminated site qualifies for long-term federal cleanup authority under the Comprehensive Environmental Response, Compensation, and Liability Act.

EPA Superfund records catalog 29 contaminants associated with this site, documented through the remedial investigation process. Construction of the cleanup remedy has not yet been designated as complete in the EPA record.

NPL listing does not, by itself, establish a health risk to nearby residents, it triggers federal authority to investigate, score, and remediate. HRS scores of 28.50 or above qualify a site for the NPL; the ranking weighs contaminant toxicity, release pathways, waste quantity, and affected population. For current site conditions and community health guidance, contact the Utah environmental or health agency and the EPA Regional Superfund office listed on the official site profile.

What is the cleanup status of this Superfund site?

NPL Status
NPL Site
Federal Facility
No
Construction Complete
No
HRS Score
53.95
Deleted from NPL
No

Contaminants

Contaminant Media
2,4-DINITROTOLUENE Soil
ANTIMONY Soil
ARSENIC Soil
BARIUM Soil
BARIUM Solid Waste
BENZO(B)FLUORANTHENE Soil
BENZO[A]ANTHRACENE Soil
BENZO[A]PYRENE Soil
BERYLLIUM Soil
CADMIUM Soil
CADMIUM Solid Waste
CHLORDANE Soil
CHROMIUM Soil
CHROMIUM Solid Waste
COPPER Soil
DELTA-HEXACHLOROCYCLOHEXANE Soil
DIBENZO(A,H)ANTHRACENE Soil
HEXAHYDRO-1,3,5-TRINITRO-1,3,5-TRIAZINE (RDX) Soil
LEAD Soil
LEAD Solid Waste
MERCURY Soil
MERCURY Solid Waste
NICKEL Soil
NICKEL Solid Waste
POLYCHLORINATED BIPHENYLS (PCBs) Soil
PYRENE Soil
SILVER Soil
SILVER Solid Waste
UNEXPLODED ORDNANCE (UXO) Solid Waste

Location

City
Tooele
State
Coordinates
40.5417, -112.3750

Other Superfund Sites in Utah

Site Name Status HRS Score
700 South 1600 East PCE Plume NPL Site 50.00
Bountiful/Woods Cross 5th South PCE Plume NPL Site 50.00
Davenport and Flagstaff Smelters Deleted NPL Site 32.50
Eureka Mills Deleted NPL Site 50.00
Five Points PCE Plume NPL Site 50.00
Hill Air Force Base NPL Site 49.94
Intermountain Waste Oil Refinery Deleted NPL Site 50.00
International Smelting and Refining Deleted NPL Site 58.31
Jacobs Smelter NPL Site 50.00
Kennecott (North Zone) Proposed NPL Site 59.18

Frequently Asked Questions

What is the Tooele Army Depot (North Area) Superfund site?
Tooele Army Depot (North Area) is an active National Priorities List (NPL) Superfund site located in Tooele, UT. It has a Hazard Ranking System (HRS) score of 53.95. Superfund sites are contaminated locations identified by the EPA for long-term cleanup.
Is Tooele Army Depot (North Area) dangerous to live near?
The presence of a site on the EPA National Priorities List does not by itself indicate an immediate health risk to nearby residents. EPA evaluates sites through a comprehensive process including remedial investigation and risk assessment. Cleanup activities may still be ongoing. For site-specific health questions, contact your state environmental or health agency.
What is the HRS score for Tooele Army Depot (North Area)?
Tooele Army Depot (North Area) has a Hazard Ranking System (HRS) score of 53.95. The HRS is the EPA's principal mechanism for evaluating Superfund sites, scores of 28.50 or greater qualify for the NPL. Higher scores indicate greater potential risk based on toxicity, waste quantity, release likelihood, and affected population.
What contaminants are at the Tooele Army Depot (North Area) site?
The EPA has identified 29 contaminants at Tooele Army Depot (North Area). Contaminant data is maintained in the EPA's Superfund database and is based on site investigations conducted during the remedial process.
What is the cleanup status of Tooele Army Depot (North Area)?
Tooele Army Depot (North Area) is currently NPL Site on the National Priorities List. The EPA Superfund cleanup process includes phases from preliminary assessment through post-construction completion.

About Superfund

The National Priorities List (NPL) is the list of sites of national priority among the known releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. The NPL is intended primarily to guide the EPA in determining which sites warrant further investigation.

The Hazard Ranking System (HRS) score is the principal mechanism the EPA uses to evaluate sites for placement on the NPL. Sites with an HRS score of 28.50 or greater are eligible for the NPL. Higher scores indicate greater potential risk.

The EPA's Superfund cleanup process typically follows these phases: preliminary assessment, site inspection, NPL listing, remedial investigation/feasibility study, remedy selection, remedial design/action, construction completion, post-construction completion, and NPL deletion. Some sites remain on the NPL for decades.

PlainEnviro presents this data without advocacy framing. The presence of a site on the NPL does not by itself indicate an immediate health risk to nearby residents. For site-specific health questions, consult your local environmental or health agency.

Related

Data sourced from the U.S. Environmental Protection Agency (EPA). See our methodology for details. Retrieved and formatted by PlainEnviro Editorial