EPA TRI Facility · Nonmetallic Mineral Product
Holcim Wcr Inc Cs-Main Ready Mix Plant
Colorado Springs, CO · Parent: Holcim Participations (us) Inc
- Total releases
- 660 lbs
- Chemicals reported
- 3
- Latest report
- 2023
- Primary pathway
- Land Disposal
LAND Form-R mix
Holcim Wcr Inc Cs-Main Ready Mix Plant: how the 660 lbs splits
660 lbs across all reported pathways
- Land Disposal 657 lbs 99.6%
- Air Releases 3 lbs 0.4%
Holcim Wcr Inc Cs-Main Ready Mix Plant's 660 lbs Form-R total is LAND - land disposal is 99.6% of the bar. Next segment: air releases at 0.4%. Leading chemical by pounds: Nitrate compounds (water dissociable; reportable only when in aqueous solution).
TRACE volume LAND pathway CLEAN
Holcim Wcr Inc Cs-Main Ready Mix Plant is an EPA Toxics Release Inventory reporter in Colorado Springs, CO, in the nonmetallic mineral product sector. It reported 448 lbs of releases across 2 chemicals in 2023, and 660 lbs in total across its 2019-2023 reporting years. That ranks 14,435 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Colorado's 277 reporting TRI sites, pounds #1 is not chemical-count #1. Holcim Wcr Inc Cs-Main Ready Mix Plant is pounds #161 and chemical-count #126 at 660 lbs. Cripple Creek & Victor Gold Mining Co leads reported pounds (22.9M lbs) at 12 chemicals (chemical-count #13). Suncor Energy Commerce City Refinery leads chemical count at 33 chemicals (460.2K lbs, pounds #24). Reported volume rose against 2022. Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Colorado Springs Utilities Martin Drake Power Plant; Atmel Corp; Quantumclean Corp Colo Spgs; Electronics Metal Finishing Corp. Similar-scale Nonmetallic Mineral Product peers outside Colorado: Tpg Pressure - South Beloit; Virginia Concrete Dumfries Plant; Audubon Readymix LLC DBA Quicksilver Readymix - 104TH Street; Central Iowa Ready Mix. Other Holcim Participations (us) Inc sites in this extract: Holcim (us) Inc Holly Hill Plant; Holcim (us) Inc; Holcim (us) (including Systech Env. Corp.); Holcim (us) Inc.. Largest disclosed chemicals by pounds: Nitrate compounds (water dissociable; reportable only when in aqueous solution); Lead compounds; Mercury.
Compare Holcim Wcr Inc Cs-Main Ready Mix Plant with
Nearest reporters in Colorado
- Colorado Springs Utilities Martin Drake Power Plant Colorado Springs · 103.3K lbs
- Atmel Corp Colorado Springs · 252.4K lbs
- Quantumclean Corp Colo Spgs Colorado Springs · 648 lbs
- Electronics Metal Finishing Corp Colorado Springs · 18.8K lbs
Similar-scale Nonmetallic Mineral Product sites elsewhere: Tpg Pressure - South Beloit (IL) · Virginia Concrete Dumfries Plant (VA) · Audubon Readymix LLC DBA Quicksilver Readymix - 104TH Street (MO)
Holcim Wcr Inc Cs-Main Ready Mix Plant stamps TRACE volume with a dominant LAND pathway (99.6% land disposal) across 3 chemicals. Cumulative Form-R extract: 660 lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include Tpg Pressure - South Beloit and Virginia Concrete Dumfries Plant.
Holcim Wcr Inc Cs-Main Ready Mix Plant vs. every reporting TRI facility
Cumulative reported release pounds, with this facility marked in the national distribution
660 lbs 44th percentile higher than 44% of 25,986 reporting TRI facilities
Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.
Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year
Holcim Wcr Inc Cs-Main Ready Mix Plant in the Nonmetallic Mineral Product sector extract
Among the 3,265 Nonmetallic Mineral Product facilities in this database, Holcim Wcr Inc Cs-Main Ready Mix Plant reports the 684th-largest volume, placing it in the top 20.9% of its sector. Scale peers outside Colorado include Tpg Pressure - South Beloit and Virginia Concrete Dumfries Plant.
Sector rank uses reported TRI pounds only. Share callouts need ≥1,000 lbs so tiny totals cannot mint a false signal.
Annual disclosure change
What changed: EPA TRI 2023 reporting year
- Holcim Wcr Inc Cs-Main Ready Mix Plant's total reported releases rose from 1 lb in 2022 to 448 lb in 2023, based on EPA TRI filings.
- Holcim Wcr Inc Cs-Main Ready Mix Plant's land releases rose from 0 lb in 2022 to 448 lb in 2023, based on EPA TRI filings.
- Holcim Wcr Inc Cs-Main Ready Mix Plant's chemicals reported fell from 3 in 2022 to 2 in 2023, based on EPA TRI filings.
Holcim Wcr Inc Cs-Main Ready Mix Plant Form-R facts
Compare this facility
See how Holcim Wcr Inc Cs-Main Ready Mix Plant stacks up against nearby facilities and the typical reporter.
99% less than the comparison
63% less than the comparison
Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.
How does this facility release toxic chemicals?
How Holcim Wcr Inc Cs-Main Ready Mix Plant releases toxic chemicals into the environment. Total: 660 lbs.
Emissions Trend Summary
From 2019 to 2023, total releases increased by 89501% (1 lbs to 448 lbs).
Holcim Wcr Inc Cs-Main Ready Mix Plant: annual Form-R pounds
TRACE site · LAND pathway · TRI years 2019–2023
- 2019 0
- 2020 0
- 2021 0
- 2022 0
- 2023 0
What this shows Holcim Wcr Inc Cs-Main Ready Mix Plant year-over-year reported totals (increased by 89501% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Nitrate compounds (water dissociable; reportable only when in aqueous solution).
| Year | Total | Chemicals |
|---|---|---|
| 2019 | 1 lbs | 1 |
| 2020 | 0 lbs | 1 |
| 2021 | 209 lbs | 2 |
| 2022 | 1 lbs | 3 |
| 2023 | 448 lbs | 2 |
Chemical Releases
Aggregated across all reporting years (2019–2023). Sorted by total release volume.
| Chemical | Total | Flags |
|---|---|---|
| Nitrate compounds (water dissociable; reportable only when in aqueous solution) | 653 lbs | - |
| Lead compounds | 7 lbs | - |
| Mercury | 0 lbs | - |
Holcim Wcr Inc Cs-Main Ready Mix Plant · LAND-pathway site
Nearest TRI Facilities to Holcim Wcr Inc Cs-Main Ready Mix Plant
Closest other reporters in Colorado - including Colorado Springs Utilities Martin Drake Power Plant, Atmel Corp, Quantumclean Corp Colo Spgs, ordered by distance.
Showing 8 of 276 other reporting facilities in Colorado.
Similar Nonmetallic Mineral Product Facilities
Other Nonmetallic Mineral Product facilities with similar total release volumes (±80%), outside Colorado - e.g. Tpg Pressure - South Beloit, Virginia Concrete Dumfries Plant, Audubon Readymix LLC DBA Quicksilver Readymix - 104TH Street.
Other Holcim Participations (us) Inc Facilities
Same-parent TRI sites ranked by reported releases - including Holcim (us) Inc Holly Hill Plant, Holcim (us) Inc, Holcim (us) (including Systech Env. Corp.).
About TRI Data
Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.
On this page the largest disclosed chemicals include Nitrate compounds (water dissociable; reportable only when in aqueous solution), Lead compounds, Mercury; nearby reporters include Colorado Springs Utilities Martin Drake Power Plant. Holcim Wcr Inc Cs-Main Ready Mix Plant stamps TRACE volume · LAND pathway · CLEAN carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.
Use and verify this record
This Holcim Wcr Inc Cs-Main Ready Mix Plant TRI extract (TRACE · LAND · CLEAN · lead Nitrate compounds (water dissociable; reportable only when in aqueous solution)) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.
Holcim Wcr Inc Cs-Main Ready Mix Plant totals are self-reported EPCRA §313 estimates for Colorado Springs, CO, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 327320 · Nonmetallic Mineral Product. 0.0% of El Paso TRI pounds in this extract. Nearest ABS peer: Newlight Technologies Inc (Δ 0 lbs). Pounds ≠ exposure.
Holcim Wcr Inc Cs-Main Ready Mix Plant stamps TRACE volume · LAND pathway · CLEAN · lead Nitrate compounds (water dissociable; reportable only when in aqueous solution). PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.
All federal data sources used on this page
- EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
- EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
- EPA Facility Registry Service - facility location and identity. epa.gov
- EPA ECHO - regulatory and compliance context. epa.gov
- EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov