EPA TRI Facility · Electric Utilities

Golden Valley Electric Assoc Healy Power Plant

Healy, AK · Parent: Golden Valley Electric Assoc

Total releases
2.3M lbs
Chemicals reported
10
Carcinogens
2
Primary pathway
Off-site Transfers

OFFSITE Form-R mix

Golden Valley Electric Assoc Healy Power Plant: how the 2.3M lbs splits

2.3M lbs across all reported pathways

  • Off-site Transfers 2.1M lbs 95.2%
  • Land Disposal 100.7K lbs 4.5%
  • Air Releases 6.8K lbs 0.3%
  • Water Discharges 93 lbs <0.1%

Golden Valley Electric Assoc Healy Power Plant's 2.3M lbs Form-R total is OFFSITE - off-site transfers is 95.2% of the bar. Next segment: land disposal at 4.5%. Leading chemical by pounds: Barium compounds (except for barium sulfate (CAS No. 7727-43-7)).

Carcinogen-classified pounds vs other reported pounds

Same cumulative TRI total as above, split by EPA/IARC carcinogen classification on each chemical: pounds share, not chemical count. Classification is not a site health-risk score.

HEAVY volume OFFSITE pathway TRACE-CARC

Golden Valley Electric Assoc Healy Power Plant is an EPA Toxics Release Inventory reporter in Healy, AK, in the electric utilities sector. It reported 370.8K lbs of releases across 9 chemicals in 2023, and 2.3M lbs in total across its 2019-2023 reporting years. That ranks 797 of 25,986 TRI facilities nationwide by cumulative reported pounds, counting each facility over however many years it has filed. In Alaska's 54 reporting TRI sites, pounds #1 is not chemical-count #1. Golden Valley Electric Assoc Healy Power Plant is pounds #6 and chemical-count #20 at 2.3M lbs. Red Dog Operations leads reported pounds (3.3B lbs) at 23 chemicals (chemical-count #3). Pogo Mine leads chemical count at 30 chemicals (34.9M lbs, pounds #4). Reported volume fell against 2022. Pounds reported are not a measure of toxicity or health risk. Nearest other TRI reporters: Usibelli Coal Mine Inc.; Petro Star Fairbanks Rail & Truck Terminal; Aurora Energy LLC; Doyon Utilities Ft Wainwright Ak. Similar-scale Electric Utilities peers outside Alaska: White Bluff Generating Plant; Otter Tail Power Co Big Stone Plant; Twin Oaks; Aes Warrior Run Inc. Other Golden Valley Electric Assoc sites in this extract: Golden Valley Electric Assoc North Pole Power Plant. Largest disclosed chemicals by pounds: Barium compounds (except for barium sulfate (CAS No. 7727-43-7)); Manganese compounds; Lead compounds; Copper compounds.

View saved records
Verify at EPA TRI →

Golden Valley Electric Assoc Healy Power Plant stamps HEAVY volume with a dominant OFFSITE pathway (95.2% off-site transfers) across 10 chemicals · 2 carcinogen-classified. Cumulative Form-R extract: 2.3M lbs (2019–2023). All figures are self-reported EPCRA §313 estimates, not measured stack emissions or a health-risk score. Scale peers include White Bluff Generating Plant and Otter Tail Power Co Big Stone Plant.

#797 of 25,986 TRI facilities nationwide by total reported releases - among the top 3.1% of reporting sites by volume. Ranking reflects reported pounds, not toxicity or health risk.

Golden Valley Electric Assoc Healy Power Plant vs. every reporting TRI facility

Cumulative reported release pounds, with this facility marked in the national distribution

2.3M lbs Top 3% higher than 97% of 25,986 reporting TRI facilities

This facility 0 lbs 20M+ lbs every reporting TRI facility, bucketed by value

Each bar is a $1M-wide band; taller bars hold more reporting TRI facilities. The dashed line and filled bar mark this facility. Hover, focus, or tap a bar for its full count, share, and position.

Source U.S. Environmental Protection Agency, Toxics Release Inventory · 2023 reporting year

Golden Valley Electric Assoc Healy Power Plant inside Denali Borough's TRI pounds

Among the 513 Electric Utilities facilities in this database, Golden Valley Electric Assoc Healy Power Plant reports the 138th-largest volume (2.3M lbs). This one site accounts for 70.5% of every pound reported in Denali Borough. Its reported volume is concentrated rather than spread: Barium compounds (except for barium sulfate (CAS No. 7727-43-7)) alone is 70.3% of the total. Scale peers outside Alaska include White Bluff Generating Plant and Otter Tail Power Co Big Stone Plant.

County-dominant here means ≥25% of Denali Borough's reported pounds (3.2M lbs county total). Shares only print when the site reports ≥1,000 lbs.

Annual disclosure change

What changed: EPA TRI 2023 reporting year

2022 → 2023
  • Golden Valley Electric Assoc Healy Power Plant's total reported releases fell from 539.5 thousand lb in 2022 to 370.8 thousand lb in 2023, based on EPA TRI filings.
  • Golden Valley Electric Assoc Healy Power Plant's land releases rose from 8.0 thousand lb in 2022 to 92.0 thousand lb in 2023, based on EPA TRI filings.
  • Golden Valley Electric Assoc Healy Power Plant's off-site transfers fell from 530.0 thousand lb in 2022 to 277.5 thousand lb in 2023, based on EPA TRI filings.
  • Golden Valley Electric Assoc Healy Power Plant's air releases fell from 1.4 thousand lb in 2022 to 1.3 thousand lb in 2023, based on EPA TRI filings.

Golden Valley Electric Assoc Healy Power Plant Form-R facts

Sector
Electric Utilities
HEAVY volume
2.3M lbs
OFFSITE pathway
Off-site Transfers
TRACE-CARC chem count
10 · 2 carc.
Lead chemical
Barium compounds (except for barium sulfate (CAS No. 7727-43-7))

Compare this facility

See how Golden Valley Electric Assoc Healy Power Plant stacks up against nearby facilities and the typical reporter.

Total reported releases
Golden Valley Electric Assoc Healy Power Plant
2.3M lbs
Usibelli Coal Mine Inc.
941.0K lbs

2.4× more than the comparison

Chemicals reported
Golden Valley Electric Assoc Healy Power Plant
10
Usibelli Coal Mine Inc.
9

About the same as the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How Golden Valley Electric Assoc Healy Power Plant releases toxic chemicals into the environment. Total: 2.3M lbs.

Off-site Transfers 2.1M lbs (95.2%)
Land Disposal 100.7K lbs (4.5%)
Air Releases 6.8K lbs (0.3%)
Water Discharges 93 lbs (<0.1%)
View 5-Year Emissions Trend →

Emissions Trend Summary

From 2019 to 2023, total releases increased by 5% (353.4K lbs to 370.8K lbs).

Golden Valley Electric Assoc Healy Power Plant: annual Form-R pounds

HEAVY site · OFFSITE pathway · TRI years 2019–2023

million lbs

What this shows Golden Valley Electric Assoc Healy Power Plant year-over-year reported totals (increased by 5% from 2019 to 2023). TRI figures are self-reported estimates and can swing with production, waste handling, and reporting changes, not only with controls. Lead chemical in the extract: Barium compounds (except for barium sulfate (CAS No. 7727-43-7)).

Source EPA Toxics Release Inventory (TRI)
Year Total Chemicals
2019 353.4K lbs 9
2020 436.9K lbs 9
2021 549.9K lbs 9
2022 539.5K lbs 10
2023 370.8K lbs 9

Chemical Releases

Aggregated across all reporting years (2019–2023). 2 of 10 chemicals are carcinogens. Sorted by total release volume.

Chemical Total Flags
Barium compounds (except for barium sulfate (CAS No. 7727-43-7)) 1.6M lbs -
Manganese compounds 628.7K lbs -
Lead compounds 19.8K lbs -
Copper compounds 11.4K lbs -
Ammonia 7.5K lbs -
Mercury 228 lbs -
n-Hexane 125 lbs -
Naphthalene 31 lbs Carcinogen
1,2,4-Trimethylbenzene 5 lbs -
Dioxin and dioxin-like compounds 0 lbs Carcinogen

Golden Valley Electric Assoc Healy Power Plant · OFFSITE-pathway site

Healy, AK
63.8692, -149.0163
County TRI context
Denali Borough · 70.5% of county pounds
Parent company
Golden Valley Electric Assoc

Compare beyond Alaska

Nationwide peers by reported pounds & chemical count

Cross-state TRI reporters nearest Golden Valley Electric Assoc Healy Power Plant on cumulative reported pounds (2.3M lbs) and distinct chemical count (10). Release-pound peers include Valero Refining Texas LP Corpus Christi East Plant, Freeport-McMoran Tyrone Inc., Alon Refining Krotz Springs Inc. Chemical-count peers include Harris Paints Corp., Saint Thomas Bulk Terminal, Total Guaynabo Bulk Terminal. Neighborhoods are forced disjoint so each axis surfaces a different set of sites.

Other Golden Valley Electric Assoc Facilities

Same-parent TRI sites ranked by reported releases - including Golden Valley Electric Assoc North Pole Power Plant.

About TRI Data

Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

On this page the largest disclosed chemicals include Barium compounds (except for barium sulfate (CAS No. 7727-43-7)), Manganese compounds, Lead compounds, Copper compounds; nearby reporters include Usibelli Coal Mine Inc.. Golden Valley Electric Assoc Healy Power Plant stamps HEAVY volume · OFFSITE pathway · TRACE-CARC carcinogen-lbs on this Form-R extract. Totals are self-reported estimates under EPCRA §313, not measured stack emissions or a health-risk score.

Use and verify this record

This Golden Valley Electric Assoc Healy Power Plant TRI extract (HEAVY · OFFSITE · TRACE-CARC · lead Barium compounds (except for barium sulfate (CAS No. 7727-43-7))) joins EPA Form-R filings with facility identity - reported pounds, not a health-risk rating.

Golden Valley Electric Assoc Healy Power Plant totals are self-reported EPCRA §313 estimates for Healy, AK, latest year 2023. Form-R rows span 2019–2023 (5 years). NAICS 221112 · Electric Utilities. 70.5% of Denali Borough TRI pounds in this extract. Nearest ABS peer: Valero Refining Texas LP Corpus Christi East Plant (Δ 5.2K lbs). Pounds ≠ exposure.

Golden Valley Electric Assoc Healy Power Plant stamps HEAVY volume · OFFSITE pathway · TRACE-CARC · lead Barium compounds (except for barium sulfate (CAS No. 7727-43-7)). PlainEnviro renders this EPA Form-R extract from its pipeline; no figure is typed in by an editor. Corrections: editorial policy.

All federal data sources used on this page
  • EPA Toxics Release Inventory (TRI) Basic Data Files - annual self-reported chemical-release filings. epa.gov
  • EPA TRI Program reference - how chemicals and reported releases are counted. epa.gov
  • EPA Facility Registry Service - facility location and identity. epa.gov
  • EPA ECHO - regulatory and compliance context. epa.gov
  • EPA Envirofacts - the EPA data warehouse exposing these datasets. epa.gov