EPA TRI Facility · Electric Utilities

Dte Electric Co-Belle River Power Plant

China Township, MI · Parent: Dte Energy Co

Total releases
13.3M lbs
Chemicals reported
24
Carcinogens
4
Primary pathway
Land Disposal
Verify at EPA TRI →

Dte Electric Co-Belle River Power Plant has reported 13.3M lbs of toxic releases across 24 chemicals to the EPA Toxic Release Inventory, based on annual facility disclosures from 2019 through 2023. Of the chemicals reported, 4 are classified as carcinogens, representing 17% of the facility's chemical profile. The facility operates in the Electric Utilities sector. The primary release pathway is land disposal, accounting for 96% of total releases. All release data shown below is self-reported to the EPA under the Emergency Planning and Community Right-to-Know Act (EPCRA) Section 313.

#149 of 25,902 TRI facilities nationwide by total reported releases - among the top 0.6% of reporting sites by volume. Ranking reflects reported pounds, not toxicity or health risk.

Dte Electric Co-Belle River Power Plant files annual Form R disclosures to the EPA Toxics Release Inventory under EPCRA Section 313, classified under NAICS 221112 (Electric Utilities). Across 5 years of records spanning 2019–2023, the site has disclosed 13.3M lbs in cumulative toxic releases across 24 distinct chemicals, 4 of which (17%) carry a carcinogenic classification.

The dominant release pathway is land disposal at 8.2M lbs (95.6% of total volume), followed by air releases at 4.3%. Between 2019 and 2023, reported totals decreased by 40% - from 2.5M lbs to 1.5M lbs. The facility is operated under parent company Dte Energy Co.

TRI Form R values are self-reported estimates, not measured stack emissions, and treat every pound of reported chemical equally regardless of toxicity. Inclusion in the TRI database does not establish a health risk to nearby residents; it documents the annual reporting record that Dte Electric Co-Belle River Power Plant has filed with the EPA under federal community right-to-know requirements.

Quick Facts

Industry
Electric Utilities
NAICS Code
221112
Total Releases
13.3M lbs
Chemicals Reported
24
Latest Report Year
2023

Compare this facility

See how Dte Electric Co-Belle River Power Plant stacks up against nearby facilities and the typical reporter.

Total reported releases
Dte Electric Co-Belle River Power Plant
13.3M lbs
Cleveland-Cliffs Steel Corp Dearborn Works
53.0M lbs

75% less than the comparison

Chemicals reported
Dte Electric Co-Belle River Power Plant
24
Cleveland-Cliffs Steel Corp Dearborn Works
17

41% more than the comparison

Comparison reflects reported pounds and chemical counts, not toxicity or health risk. Averages cover facilities reporting any release.

How does this facility release toxic chemicals?

How Dte Electric Co-Belle River Power Plant releases toxic chemicals into the environment. Total: 8.6M lbs.

Land Disposal 8.2M lbs (95.6%)
Air Releases 372.5K lbs (4.3%)
Water Discharges 8.9K lbs (0.1%)
Off-site Transfers 427 lbs (<0.1%)
View 5-Year Emissions Trend →

Emissions Trend Summary

From 2019 to 2023, total releases decreased by 40% (2.5M lbs to 1.5M lbs).

Reported total releases by year

Dte Electric Co-Belle River Power Plant - annual TRI totals

million lbs

What this shows Year-over-year reported totals. TRI figures are self-reported estimates and can swing with production levels, waste-rock handling and reporting changes, not only with emissions controls.

Source EPA Toxics Release Inventory (TRI)
Year Total Chemicals
2019 2.5M lbs 17
2020 966.0K lbs 14
2021 1.7M lbs 16
2022 2.0M lbs 16
2023 1.5M lbs 11

Chemical Releases

Aggregated across all reporting years (2019–2023). 4 of 24 chemicals are carcinogens. Sorted by total release volume.

Chemical Total Flags
Barium compounds (except for barium sulfate (CAS No. 7727-43-7)) 6.3M lbs -
Barium And Barium Compounds 1.3M lbs -
Hydrochloric acid (acid aerosols including mists, vapors, gas, fog, and other airborne forms of any particle size) 189.0K lbs -
Manganese compounds 159.7K lbs -
Vanadium compounds 138.5K lbs -
Sulfuric acid (acid aerosols including mists, vapors, gas, fog, and other airborne forms of any particle size) 124.0K lbs -
Zinc compounds 106.0K lbs -
Copper compounds 79.5K lbs -
Hydrogen fluoride 42.8K lbs -
Manganese And Manganese Compounds 36.2K lbs -
Nickel compounds 35.2K lbs Carcinogen
Chromium compounds (except for chromite ore mined in the Transvaal Region) 30.1K lbs -
Lead compounds 23.6K lbs -
Copper And Copper Compounds 20.1K lbs -
Selenium compounds 12.6K lbs -
Lead And Lead Compounds 8.0K lbs -
Chromium and Chromium Compounds(except for chromite ore mined in the Transvaal Region) 6.2K lbs -
Selenium And Selenium Compounds 5.7K lbs -
Nickel And Nickel Compounds 5.4K lbs Carcinogen
Mercury compounds 604 lbs -
Mercury And Mercury Compounds 280 lbs -
Polycyclic aromatic compounds 46 lbs Carcinogen
Dioxin and dioxin-like compounds 5 lbs Carcinogen
Benzo[g,h,i]perylene 1 lbs -

Location

Coordinates
42.7757, -82.5124
ZIP Code
48054
EPA Facility ID
48054DTRTD4505K

About TRI Data

Data as of 2023 reporting year. Source: U.S. Environmental Protection Agency (EPA) Toxic Release Inventory.

Data comes from the EPA Toxic Release Inventory (TRI) program. Facilities that manufacture, process, or otherwise use listed toxic chemicals above threshold amounts are required to report annually to the EPA.

Release quantities are self-reported by the facility and may represent estimates rather than exact measurements. "Total releases" includes releases to air, water, land, and off-site transfers for disposal. Quantities shown here are aggregated across all available reporting years.

PlainEnviro presents this data without advocacy framing. The presence of a facility in the TRI database does not by itself indicate a health risk. For site-specific health questions, consult your local environmental or health agency.

Frequently Asked Questions

What chemicals does Dte Electric Co-Belle River Power Plant release?
Dte Electric Co-Belle River Power Plant has reported releases of 24 chemicals to the EPA Toxic Release Inventory, totaling 13.3M lbs. 4 of these (17%) are classified as carcinogens.
What industry is Dte Electric Co-Belle River Power Plant in?
Dte Electric Co-Belle River Power Plant is classified under the "Electric Utilities" industry (NAICS code 221112), located in China Township, MI.
How long has Dte Electric Co-Belle River Power Plant reported to the TRI?
Dte Electric Co-Belle River Power Plant has EPA Toxic Release Inventory data spanning 5 years, from 2019 to 2023.
How does Dte Electric Co-Belle River Power Plant release toxic chemicals?
The primary release pathway for Dte Electric Co-Belle River Power Plant is land disposal, accounting for 95.6% of total releases (8.2M lbs). Secondary pathway: air releases (4.3%).
Are emissions from Dte Electric Co-Belle River Power Plant increasing or decreasing?
From 2019 to 2023, total releases decreased by 40%, from 2.5M lbs to 1.5M lbs.
Is Dte Electric Co-Belle River Power Plant a health risk?
The presence of a facility in the TRI database does not by itself indicate a health risk. Release quantities are self-reported estimates. For site-specific health questions, consult your local environmental or health agency.
Does Dte Electric Co-Belle River Power Plant release carcinogens?
Yes, Dte Electric Co-Belle River Power Plant reports 4 chemicals classified as carcinogens, representing 17% of all chemicals reported by this facility. Carcinogen classification is based on EPA and IARC assessments.

What to do with this facility's data

Use this facility profile as a starting point, then check how it compares.

  • See whether releases reported by Dte Electric Co-Belle River Power Plant are rising or falling over time. View trends
  • This facility ranks #149 of 25,902 TRI facilities nationwide by total reported releases - among the top 0.6% of reporting sites by volume. Ranking reflects reported pounds, not toxicity or health risk. See the full rankings
  • Check Michigan's statewide profile for the full picture: total facilities, water systems, and Superfund sites. View Michigan profile

TRI release totals are self-reported estimates submitted to the EPA, not independently measured stack emissions; a high rank reflects reported volume, not necessarily local health risk.

Related

Sources & how this page was built

Every figure on this page traces to public, federal-government data on Dte Electric Co-Belle River Power Plant. The records below are the primary sources; our methodology explains how they are joined, computed, and verified.

Retrieved and formatted by PlainEnviro Editorial. TRI release totals are self-reported estimates, not measured stack emissions.

According to the U.S. Environmental Protection Agency, the Toxics Release Inventory has required annual industrial disclosure since its creation under the Emergency Planning and Community Right-to-Know Act in October 1986, and this facility's record is drawn from PlainEnviro's database of more than 25,000 EPA-tracked facilities through the 2023 reporting year; see our methodology for full source citations and refresh cadence.